Equipment and Calibration History

Page: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 [26] 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70
Ser No.DateLoc FromTitleLoc ToNotes
S2-411 1054 2020-08-05 Lab none Installed East End Narrow Band NDVI Reflected B Installed at EE in the NDVI outgoing position
S2-411 1053 2020-08-05 Lab none Installed East End Narrow Band NDVI Incoming B Installed at EE in the NDVI incoming position
CS451 70011229 2020-08-05 Lab none Installed East End Water Level Installed at EE to replace sn 20010375, which was brought back to the lab for repair. From field note calculations, sensor was installed 22cm below ground level.
Top of well to ground level= 41 cm
Top of well to sensor = 63 cm
Top of well to bottom of well inside pipe = 66 cm (dry at bottom of well)
S2-411 1050 2020-08-05 Lab none Installed Bouldin Alfalfa Narrow Band NDVI Reflected Test Installed at BA in the NDVI outgoing position
S2-411 1049 2020-08-05 Lab none Installed Bouldin Alfalfa Narrow Band NDVI Incoming Test Installed at BA in the NDVI incoming position
PS-15 03220377 2012-02-16 Lab none Installed Vaira none Installed with the solar system for the new soil CO2 profile.
CS450 20010026 2020-07-17 Lab none Shipped Factory none Shipped back to Campbell for repair on RMA # 32203
CS450 20010026 2020-07-09 Sherman Wetland Water Level Removed Lab none Removed from SW and brought back to the lab because this sensor was causing the met system to short
HMP60 L1740395 2020-08-04 Factory none Disposed Disposed none The sensor was unrepairable and Campbell Sci disposed of it. Note from Campbell: "Sensor is shorted on the 12V input. Sensor is completely potted except for RH and Temperature components. Sensor cannot be repaired."
CS451 20010375 2020-08-04 Factory none Disposed Disposed none The sensor was unrepairable and Campbell Sci disposed of it. Note from Campbell: "There are cracks in the cable almost the the entire length as well as what appears to be a repair in an attempt to seal the cable. Water got inside the probe and shorted out the board. The sensor and cable are about 7.5 years old, neither one is repairable."
HMP60 L1740398 2020-07-30 Lab none Installed Bouldin Corn RH & Temp Installed at BC to replace sn L1740395, which was sent to Campbell for repair
RPI0W RPI0W-004 2020-07-30 Bouldin Corn Removed Lab none Removed from BC and brought back to the lab because the corn canopy is about done developing for the season
RPI0W RPI0W-002 2020-07-30 Bouldin Corn Removed Lab none Removed from BC and brought back to the lab because the corn canopy is about done developing for the season
RPI0W RPI0W-001 2020-07-30 Bouldin Corn Removed Lab none Removed from BC and brought back to the lab because the corn canopy is about done developing for the season
GMM222 L2010070 2017-09-21 Vaira CO2 probe North Profile -0.08 Location Vaira CO2 probe North Profile -0.08 This probe did not change location
CS451 70011234 2020-05-19 Bouldin Corn Water Level Moved Bouldin Corn Water Level Dug new well after moving tower into corn field. Sensor is 91cm below ground level.
Water level from top of well = 131 cm (4.3’)
Top of well to ground = 47 cm
Top of well to sensor = 138 cm
Sensor psi reading = 0.12 psi ~ 8 cm (checks out with physical measurement!)
CS451 20010375 2020-07-29 Lab none Shipped Factory none Sent back to Campbell for repair on RMA # 32280.
HMP60 L1740395 2020-07-28 Lab none Shipped Factory none Sent back to Campbell for repair on RMA # 32280.
PQS 1 140455 2020-07-28 Vaira PAR Sensor Incoming Cal Moved Vaira PAR Sensor Reflected Cal Moved from the incoming position to the reflected position to continue inter-comparison
PQS 1 161073 2020-07-28 Vaira PAR Sensor Reflected Cal Moved Vaira PAR Sensor Incoming Cal Moved from the reflected position to the incoming position to continue inter-comparison
BB-Fab BB-VR_soilco2 2012-03-21 Lab none Installed Vaira none I installed new batteries (borrowed from DWR) for the new soil co2 system. The original batteries were killed because they were wired for 24V and the solar for 12V.
BB-Fab BB-VR_soilco2 2012-03-19 Vaira Removed Lab none The four new batteries for the soil CO2 sensors were completely dead (~2V). The batteries were wired for 24V but the solar panels were wired for 12V. Batteries removed.
BB-Fab BB-VR_soilco2 2012-02-16 Lab none Installed Vaira none Initial installation of the VR_soilco2 battery bank. Two pairs of deep cycle batteries were installed for a 24V system. However the solar panels were only wired as 12V and bled the batteries dry.
PQS 1 161073 2020-06-12 Lab none Installed Vaira PAR Sensor Reflected Cal Installed on the Vaira Tower mounted in the reflected position for cross comparison and eventual swap of the old sensor on the tower for cable repair.
PQS 1 140455 2020-06-12 Lab none Installed Vaira PAR Sensor Incoming Cal Installed on the Vaira Tower mounted in the incoming position for cross comparison and eventual swap of the old sensor on the tower for cable repair.
GMP222 Z2720012 2012-02-16 Lab none Installed Tonzi CO2 Probe Open Profile -0.02 Installed at Tonzi in the Open set at -2cm. This was supposed to be sn X3830001 but that probe was not working and so was returned to the lab.
GMP222 Z2720012 2010-01-08 Tonzi CO2 Probe Open Profile -0.16 Location Tonzi CO2 Probe Open Profile -0.16 Pulled out for ambient air reading and put back.
GMP222 Z2720011 2010-01-08 Tonzi CO2 Probe Open Profile -0.08 Location Tonzi CO2 Probe Open Profile -0.08 Pulled out for ambient air reading and put back.
GMP222 X5050014 2010-01-08 Tonzi CO2 Probe Open Profile -0.04 Location Tonzi CO2 Probe Open Profile -0.04 Pulled out for ambient air reading and put back.
GMP222 Z2720013 2010-01-08 Tonzi CO2 Probe Open Profile -0.02 Location Tonzi CO2 Probe Open Profile -0.02 Pulled out for ambient air reading and put back.
GMP222 X1920001 2010-01-08 Tonzi CO2 Probe Tree1 Profile -0.16 Location Tonzi CO2 Probe Tree1 Profile -0.16 Pulled out for ambient air reading and put back.
GMP222 Z2720014 2010-01-08 Tonzi CO2 Probe Tree1 Profile -0.08 Location Tonzi CO2 Probe Tree1 Profile -0.08 Pulled out for ambient air reading and put back.
GMP222 X4840007 2010-01-08 Tonzi CO2 Probe Tree1 Profile -0.04 Location Tonzi CO2 Probe Tree1 Profile -0.04 Pulled out for ambient air reading and put back.
GMP222 X3830001 2010-01-08 Tonzi CO2 Probe Tree1 Profile -0.02 Location Tonzi CO2 Probe Tree1 Profile -0.02 Pulled out for ambient air reading and put back.
CS451 20010375 2020-07-23 Lab none Tested Lab none This sensor browned out the power at East End. I found one bad nick in the cable but after opening it up I did not see any damage to the conductors there. I plugged it into a power supply in the lab and it immediately pulled the 12V supply down to 7V. This needs to be sent to Campbell.
HMP60 L1740395 2020-07-23 Lab none Tested Lab none Tested in the lab. I used a cable in the lab to power the sensor and measure its temperature signal with a volt meter. The reading was wrong and the base of the sensor definitely got warm. I same cable with another HMP60 and got a much more reasonable temperature reading and did not notice the sensor getting warm. The sensor needs to go back to Campbell for evaluation.
eosFD FD20180047 2020-07-21 Lab none Installed Bouldin Corn Forced Diffusion A Installed in the normal density corn in front of the tower.
HMP60 L1740395 2020-07-21 Bouldin Corn RH & Temp Removed Lab none Removed from BC and brought back to the lab for inspection. AirT/RH both went bad on 7/5 but nothing obviously wrong with it.
PA-II-SD 68c63acc07a9 2020-07-21 Bouldin Corn Air Quality Sensor Removed Lab none Removed from BC and brought back to the lab to test. No data files on card.
miniDOT-usb 899502 2020-07-21 West Pond DO Sensor A Removed West Pond none Removed from WP tower and loaned to Ariane to bury underground in WP. There's not much water at the WP tower anyways, and Ariane is planning on draining it the following week.
RPI0W RPI0W-005 2020-07-21 Lab none Installed East End Camera Installed at EE to replace the Canon camera that was stolen in June.
CS451 20010375 2020-07-21 East End Water Level Removed Lab none Removed from EE and brought back to the lab to repair a chewed section of the cable.
S2-411 1050 2020-07-15 Lab none Initial settings Lab none Set up as SDI-12 address H for NDVIout
S2-411 1054 2020-07-15 Lab none Initial settings Lab none Set up as SDI-12 address H for NDVIout
S2-411 1053 2020-07-15 Lab none Initial settings Lab none Set up as SDI-12 address G for NDVIin
S2-411 1049 2020-07-15 Lab none Initial settings Lab none Set up as SDI-12 address G for NDVIin
RPI0W RPI0W-005 2020-07-15 Lab none Tested Lab none This RTC clock does not work, keep resetting the clock to 2017-12-10, which is strange because usually the clock resets back to 12-31-1999 (especially if the battery is dead). I'm borrowing the RTC clock from RPIW-003, which is still in the lab. We should order a new RTC to replace it.

I set up the access network as RPI0W-005.
AM16/32B 27703 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
PS-30M 0127000A 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
KD140SX-UFBS 11ZV0M0862 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
KD140SX-UFBS 11ZV0M0861 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
KD140SX-UFBS 11ZV0M0860 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
HMP45AC T2130005 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
TE525MM 49187-109 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
ML2x 377/010 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
ML2x 54/016 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
ML2x 377/008 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
NR01 1570 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
SRS-Ni NDVI 882103061 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
SRS-Ni NDVI 882103036 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
SRS-Pi PRI 913003007 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
SRS-Pi PRI 913003006 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
PQS 1 110338 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
PQS 1 110339 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
HFP01 6498 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
HFP01 6491 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
HFP01 6342 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
CS451 20010046 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
WM 1590 153802 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
LI-7700 TG1-0357 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
LI-7500A 75H-2668 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
LI-7550 AIU-1557 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
AM25T 6767 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
CR1000 47108 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
AM16/32B 11662 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
NL115 6763 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
SD130BN 0030F4D2148D 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
AM16/32B 27703 2020-07-09 Lab none Loaned Loaned none Given to Sabina of Hydrofocus with the Sherman Barn system. This was an extra mux to replace the old, failing mux sn 11662.
PS-30M 0127000A 2020-07-09 Lab none Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
KD140SX-UFBS 11ZV0M0862 2020-07-09 Lab none Loaned Loaned none Given to Sabina of Hydrofocus with the Sherman Barn system
KD140SX-UFBS 11ZV0M0861 2020-07-09 Lab none Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
KD140SX-UFBS 11ZV0M0860 2020-07-09 Lab none Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
HMP45AC T2130005 2020-07-09 Sherman Barn RH & Temp Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
TE525MM 49187-109 2020-07-09 Sherman Barn Precipitation Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
ML2x 377/010 2020-07-09 Sherman Barn Soil Moisture Probe C Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. This sensor was just below the surface and in the southern profile (relative to the other 2 profiles).
ML2x 54/016 2020-07-09 Sherman Barn Soil Moisture Probe B Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. This sensor was near the surface, between the other two soil profiles.
ML2x 377/008 2020-07-09 Sherman Barn Soil Moisture Probe A Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. This sensor was near the surface in the northern profile (relative to the other 2 profiles).
NR01 1570 2020-07-09 Sherman Barn Net Radiometer 4-way Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
SRS-Ni NDVI 882103061 2020-07-09 Sherman Barn Narrow Band NDVI Reflected Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
SRS-Ni NDVI 882103036 2020-07-09 Sherman Barn Narrow Band NDVI Incoming Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
SRS-Pi PRI 913003007 2020-07-09 Sherman Barn Narrow Band PRI Reflected Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
SRS-Pi PRI 913003006 2020-07-09 Sherman Barn Narrow Band PRI Incoming Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
PQS 1 110338 2020-07-09 Sherman Barn PAR Sensor Reflected Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
PQS 1 110339 2020-07-09 Sherman Barn PAR Sensor Incoming Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
HFP01 6498 2020-07-09 Sherman Barn Heat Flux Plate C Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. This sensor was in the southern soil profile relative to the other two profiles.
HFP01 6491 2020-07-09 Sherman Barn Heat Flux Plate B Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. This sensor was in the middle soil profile, located between the north and south profile. The sensor was very near the surface, with only litter covering it.
HFP01 6342 2020-07-09 Sherman Barn Heat Flux Plate A Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. This sensor was in a northern position relative to the other soil profiles.
CS451 20010046 2020-07-09 Sherman Barn Water Level Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
WM 1590 153802 2020-07-09 Sherman Barn Anemometer Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
LI-7700 TG1-0357 2020-07-09 Sherman Barn Gas Analyzer CH4 Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.