Equipment and Calibration History
Page: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 [26] 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70Ser No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
S2-411 1054 | 2020-08-05 | Lab none | Installed | East End Narrow Band NDVI Reflected B | Installed at EE in the NDVI outgoing position |
S2-411 1053 | 2020-08-05 | Lab none | Installed | East End Narrow Band NDVI Incoming B | Installed at EE in the NDVI incoming position |
CS451 70011229 | 2020-08-05 | Lab none | Installed | East End Water Level | Installed at EE to replace sn 20010375, which was brought back to the lab for repair. From field note calculations, sensor was installed 22cm below ground level.
Top of well to ground level= 41 cm Top of well to sensor = 63 cm Top of well to bottom of well inside pipe = 66 cm (dry at bottom of well) |
S2-411 1050 | 2020-08-05 | Lab none | Installed | Bouldin Alfalfa Narrow Band NDVI Reflected Test | Installed at BA in the NDVI outgoing position |
S2-411 1049 | 2020-08-05 | Lab none | Installed | Bouldin Alfalfa Narrow Band NDVI Incoming Test | Installed at BA in the NDVI incoming position |
PS-15 03220377 | 2012-02-16 | Lab none | Installed | Vaira none | Installed with the solar system for the new soil CO2 profile. |
CS450 20010026 | 2020-07-17 | Lab none | Shipped | Factory none | Shipped back to Campbell for repair on RMA # 32203 |
CS450 20010026 | 2020-07-09 | Sherman Wetland Water Level | Removed | Lab none | Removed from SW and brought back to the lab because this sensor was causing the met system to short |
HMP60 L1740395 | 2020-08-04 | Factory none | Disposed | Disposed none | The sensor was unrepairable and Campbell Sci disposed of it. Note from Campbell: "Sensor is shorted on the 12V input. Sensor is completely potted except for RH and Temperature components. Sensor cannot be repaired." |
CS451 20010375 | 2020-08-04 | Factory none | Disposed | Disposed none | The sensor was unrepairable and Campbell Sci disposed of it. Note from Campbell: "There are cracks in the cable almost the the entire length as well as what appears to be a repair in an attempt to seal the cable. Water got inside the probe and shorted out the board. The sensor and cable are about 7.5 years old, neither one is repairable." |
HMP60 L1740398 | 2020-07-30 | Lab none | Installed | Bouldin Corn RH & Temp | Installed at BC to replace sn L1740395, which was sent to Campbell for repair |
RPI0W RPI0W-004 | 2020-07-30 | Bouldin Corn | Removed | Lab none | Removed from BC and brought back to the lab because the corn canopy is about done developing for the season |
RPI0W RPI0W-002 | 2020-07-30 | Bouldin Corn | Removed | Lab none | Removed from BC and brought back to the lab because the corn canopy is about done developing for the season |
RPI0W RPI0W-001 | 2020-07-30 | Bouldin Corn | Removed | Lab none | Removed from BC and brought back to the lab because the corn canopy is about done developing for the season |
GMM222 L2010070 | 2017-09-21 | Vaira CO2 probe North Profile -0.08 | Location | Vaira CO2 probe North Profile -0.08 | This probe did not change location |
CS451 70011234 | 2020-05-19 | Bouldin Corn Water Level | Moved | Bouldin Corn Water Level | Dug new well after moving tower into corn field. Sensor is 91cm below ground level.
Water level from top of well = 131 cm (4.3’) Top of well to ground = 47 cm Top of well to sensor = 138 cm Sensor psi reading = 0.12 psi ~ 8 cm (checks out with physical measurement!) |
CS451 20010375 | 2020-07-29 | Lab none | Shipped | Factory none | Sent back to Campbell for repair on RMA # 32280. |
HMP60 L1740395 | 2020-07-28 | Lab none | Shipped | Factory none | Sent back to Campbell for repair on RMA # 32280. |
PQS 1 140455 | 2020-07-28 | Vaira PAR Sensor Incoming Cal | Moved | Vaira PAR Sensor Reflected Cal | Moved from the incoming position to the reflected position to continue inter-comparison |
PQS 1 161073 | 2020-07-28 | Vaira PAR Sensor Reflected Cal | Moved | Vaira PAR Sensor Incoming Cal | Moved from the reflected position to the incoming position to continue inter-comparison |
BB-Fab BB-VR_soilco2 | 2012-03-21 | Lab none | Installed | Vaira none | I installed new batteries (borrowed from DWR) for the new soil co2 system. The original batteries were killed because they were wired for 24V and the solar for 12V. |
BB-Fab BB-VR_soilco2 | 2012-03-19 | Vaira | Removed | Lab none | The four new batteries for the soil CO2 sensors were completely dead (~2V). The batteries were wired for 24V but the solar panels were wired for 12V. Batteries removed. |
BB-Fab BB-VR_soilco2 | 2012-02-16 | Lab none | Installed | Vaira none | Initial installation of the VR_soilco2 battery bank. Two pairs of deep cycle batteries were installed for a 24V system. However the solar panels were only wired as 12V and bled the batteries dry. |
PQS 1 161073 | 2020-06-12 | Lab none | Installed | Vaira PAR Sensor Reflected Cal | Installed on the Vaira Tower mounted in the reflected position for cross comparison and eventual swap of the old sensor on the tower for cable repair. |
PQS 1 140455 | 2020-06-12 | Lab none | Installed | Vaira PAR Sensor Incoming Cal | Installed on the Vaira Tower mounted in the incoming position for cross comparison and eventual swap of the old sensor on the tower for cable repair. |
GMP222 Z2720012 | 2012-02-16 | Lab none | Installed | Tonzi CO2 Probe Open Profile -0.02 | Installed at Tonzi in the Open set at -2cm. This was supposed to be sn X3830001 but that probe was not working and so was returned to the lab. |
GMP222 Z2720012 | 2010-01-08 | Tonzi CO2 Probe Open Profile -0.16 | Location | Tonzi CO2 Probe Open Profile -0.16 | Pulled out for ambient air reading and put back. |
GMP222 Z2720011 | 2010-01-08 | Tonzi CO2 Probe Open Profile -0.08 | Location | Tonzi CO2 Probe Open Profile -0.08 | Pulled out for ambient air reading and put back. |
GMP222 X5050014 | 2010-01-08 | Tonzi CO2 Probe Open Profile -0.04 | Location | Tonzi CO2 Probe Open Profile -0.04 | Pulled out for ambient air reading and put back. |
GMP222 Z2720013 | 2010-01-08 | Tonzi CO2 Probe Open Profile -0.02 | Location | Tonzi CO2 Probe Open Profile -0.02 | Pulled out for ambient air reading and put back. |
GMP222 X1920001 | 2010-01-08 | Tonzi CO2 Probe Tree1 Profile -0.16 | Location | Tonzi CO2 Probe Tree1 Profile -0.16 | Pulled out for ambient air reading and put back. |
GMP222 Z2720014 | 2010-01-08 | Tonzi CO2 Probe Tree1 Profile -0.08 | Location | Tonzi CO2 Probe Tree1 Profile -0.08 | Pulled out for ambient air reading and put back. |
GMP222 X4840007 | 2010-01-08 | Tonzi CO2 Probe Tree1 Profile -0.04 | Location | Tonzi CO2 Probe Tree1 Profile -0.04 | Pulled out for ambient air reading and put back. |
GMP222 X3830001 | 2010-01-08 | Tonzi CO2 Probe Tree1 Profile -0.02 | Location | Tonzi CO2 Probe Tree1 Profile -0.02 | Pulled out for ambient air reading and put back. |
CS451 20010375 | 2020-07-23 | Lab none | Tested | Lab none | This sensor browned out the power at East End. I found one bad nick in the cable but after opening it up I did not see any damage to the conductors there. I plugged it into a power supply in the lab and it immediately pulled the 12V supply down to 7V. This needs to be sent to Campbell. |
HMP60 L1740395 | 2020-07-23 | Lab none | Tested | Lab none | Tested in the lab. I used a cable in the lab to power the sensor and measure its temperature signal with a volt meter. The reading was wrong and the base of the sensor definitely got warm. I same cable with another HMP60 and got a much more reasonable temperature reading and did not notice the sensor getting warm. The sensor needs to go back to Campbell for evaluation. |
eosFD FD20180047 | 2020-07-21 | Lab none | Installed | Bouldin Corn Forced Diffusion A | Installed in the normal density corn in front of the tower. |
HMP60 L1740395 | 2020-07-21 | Bouldin Corn RH & Temp | Removed | Lab none | Removed from BC and brought back to the lab for inspection. AirT/RH both went bad on 7/5 but nothing obviously wrong with it. |
PA-II-SD 68c63acc07a9 | 2020-07-21 | Bouldin Corn Air Quality Sensor | Removed | Lab none | Removed from BC and brought back to the lab to test. No data files on card. |
miniDOT-usb 899502 | 2020-07-21 | West Pond DO Sensor A | Removed | West Pond none | Removed from WP tower and loaned to Ariane to bury underground in WP. There's not much water at the WP tower anyways, and Ariane is planning on draining it the following week. |
RPI0W RPI0W-005 | 2020-07-21 | Lab none | Installed | East End Camera | Installed at EE to replace the Canon camera that was stolen in June. |
CS451 20010375 | 2020-07-21 | East End Water Level | Removed | Lab none | Removed from EE and brought back to the lab to repair a chewed section of the cable. |
S2-411 1050 | 2020-07-15 | Lab none | Initial settings | Lab none | Set up as SDI-12 address H for NDVIout |
S2-411 1054 | 2020-07-15 | Lab none | Initial settings | Lab none | Set up as SDI-12 address H for NDVIout |
S2-411 1053 | 2020-07-15 | Lab none | Initial settings | Lab none | Set up as SDI-12 address G for NDVIin |
S2-411 1049 | 2020-07-15 | Lab none | Initial settings | Lab none | Set up as SDI-12 address G for NDVIin |
RPI0W RPI0W-005 | 2020-07-15 | Lab none | Tested | Lab none | This RTC clock does not work, keep resetting the clock to 2017-12-10, which is strange because usually the clock resets back to 12-31-1999 (especially if the battery is dead). I'm borrowing the RTC clock from RPIW-003, which is still in the lab. We should order a new RTC to replace it. I set up the access network as RPI0W-005. |
AM16/32B 27703 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
PS-30M 0127000A | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
KD140SX-UFBS 11ZV0M0862 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
KD140SX-UFBS 11ZV0M0861 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
KD140SX-UFBS 11ZV0M0860 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
HMP45AC T2130005 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
TE525MM 49187-109 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
ML2x 377/010 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
ML2x 54/016 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
ML2x 377/008 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
NR01 1570 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
SRS-Ni NDVI 882103061 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
SRS-Ni NDVI 882103036 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
SRS-Pi PRI 913003007 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
SRS-Pi PRI 913003006 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
PQS 1 110338 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
PQS 1 110339 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
HFP01 6498 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
HFP01 6491 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
HFP01 6342 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
CS451 20010046 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
WM 1590 153802 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
LI-7700 TG1-0357 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
LI-7500A 75H-2668 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
LI-7550 AIU-1557 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
AM25T 6767 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
CR1000 47108 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
AM16/32B 11662 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
NL115 6763 | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
SD130BN 0030F4D2148D | 2020-07-09 | Loaned | Disposed | Disposed | Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
AM16/32B 27703 | 2020-07-09 | Lab none | Loaned | Loaned none | Given to Sabina of Hydrofocus with the Sherman Barn system. This was an extra mux to replace the old, failing mux sn 11662. |
PS-30M 0127000A | 2020-07-09 | Lab none | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
KD140SX-UFBS 11ZV0M0862 | 2020-07-09 | Lab none | Loaned | Loaned none | Given to Sabina of Hydrofocus with the Sherman Barn system |
KD140SX-UFBS 11ZV0M0861 | 2020-07-09 | Lab none | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
KD140SX-UFBS 11ZV0M0860 | 2020-07-09 | Lab none | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
HMP45AC T2130005 | 2020-07-09 | Sherman Barn RH & Temp | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
TE525MM 49187-109 | 2020-07-09 | Sherman Barn Precipitation | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
ML2x 377/010 | 2020-07-09 | Sherman Barn Soil Moisture Probe C | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. This sensor was just below the surface and in the southern profile (relative to the other 2 profiles). |
ML2x 54/016 | 2020-07-09 | Sherman Barn Soil Moisture Probe B | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. This sensor was near the surface, between the other two soil profiles. |
ML2x 377/008 | 2020-07-09 | Sherman Barn Soil Moisture Probe A | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. This sensor was near the surface in the northern profile (relative to the other 2 profiles). |
NR01 1570 | 2020-07-09 | Sherman Barn Net Radiometer 4-way | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
SRS-Ni NDVI 882103061 | 2020-07-09 | Sherman Barn Narrow Band NDVI Reflected | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
SRS-Ni NDVI 882103036 | 2020-07-09 | Sherman Barn Narrow Band NDVI Incoming | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
SRS-Pi PRI 913003007 | 2020-07-09 | Sherman Barn Narrow Band PRI Reflected | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
SRS-Pi PRI 913003006 | 2020-07-09 | Sherman Barn Narrow Band PRI Incoming | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
PQS 1 110338 | 2020-07-09 | Sherman Barn PAR Sensor Reflected | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
PQS 1 110339 | 2020-07-09 | Sherman Barn PAR Sensor Incoming | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
HFP01 6498 | 2020-07-09 | Sherman Barn Heat Flux Plate C | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. This sensor was in the southern soil profile relative to the other two profiles. |
HFP01 6491 | 2020-07-09 | Sherman Barn Heat Flux Plate B | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. This sensor was in the middle soil profile, located between the north and south profile. The sensor was very near the surface, with only litter covering it. |
HFP01 6342 | 2020-07-09 | Sherman Barn Heat Flux Plate A | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. This sensor was in a northern position relative to the other soil profiles. |
CS451 20010046 | 2020-07-09 | Sherman Barn Water Level | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
WM 1590 153802 | 2020-07-09 | Sherman Barn Anemometer | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |
LI-7700 TG1-0357 | 2020-07-09 | Sherman Barn Gas Analyzer CH4 | Removed | Loaned none | Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus. |