Skip to main content
rice field banner biometlab logo
   
   
 
   
   
   
   
   
 
 

Field Notes

Fieldnotes Limited To:
Site = Tonzi
Year = 2014

2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024
33 Rows returned:
SiteDateAuthorSummary
Tonzi (357) 2014-12-23 09:00:00 Siyan Ma Ponds are full, swapped 7500s at Tonzi, Brought in LI-820, Tower sonic hung up again.
Tonzi (343) 2014-12-09 11:00:00 Joe Verfaillie Tower sonic stopped - fixed, co2 profile bad solenoid, dirty path - partially fixed, Tree 2 Soil CO2 fixed, tram derailed - fixed
Tonzi (343) 2014-12-09 09:00:00 Siyan Ma Standard field work, clip plots, grass height, power outages do to low sunlight at Tonzi, CO2 profile not working
Tonzi (330) 2014-11-26 09:40:00 Siyan Ma Grass germinated, still oak leaves at Vaira, fixed Tonzi tower fence, no 7500 analog data at Floor - digital okay, standard field work.
Tonzi (317) 2014-11-13 09:30:00 Siyan Ma Standard fieldwork, rain last night and a little this morning, Tower fence broken, did not collect z-cam images
Tonzi (297) 2014-10-24 10:30:00 Siyan Ma Standard fieldwork, all went well, Tower fence broken - fixed
Tonzi (280) 2014-10-07 11:00:00 Joe Verfaillie Maintained fences, fixed CO2 profile system.
Tonzi (275) 2014-10-02 12:00:00 Joe Verfaillie Mr. Tonzi died today.
Tonzi (273) 2014-09-30 09:30:00 Siyan Ma A little rain last week, trees turning brown - not so much at Vaira, Cows broke fences at Tonzi, begin new fence at Vaira, CO2 profile needs fixing, swapped Floor 7500.
Tonzi (254) 2014-09-11 11:00:00 Joe Verfaillie PRI sensors operational, reinstalled LI-820 but still some plumbing problem, Tower fence down - repaired, missing Tram data, swapped tower 7500.
Tonzi (254) 2014-09-11 09:20:00 Siyan Ma Standard fieldwork, Joe fixed fence at Vaira, reinstalled CO2 profile system, trees starting to turn color, midday water potential
Tonzi (233) 2014-08-21 10:30:00 Joe Verfaillie Tried to install Decagon PRI sensors, tried to fix the CO2 profile system, set up daily split on the tower computer.
Tonzi (233) 2014-08-21 09:00:00 Siyan Ma Standard field work, co2 profile system down - IGRA brought it, midday water potential, litter biomass.
Tonzi (217) 2014-08-05 09:40:00 Siyan Ma Trees started to change color, did not span co2 profile, tram and co2 profile files need daily split set up.
Tonzi (190) 2014-07-09 04:50:00 Siyan Ma Predawn water potential, new tank for midday potential, standard field work, Joe replaced tower computer.
Tonzi (183) 2014-07-02 12:00:00 Joe Verfaillie Swapped CO2 profile N2 tank, tower computer has crashed with bad disk
Tonzi (176) 2014-06-25 04:40:00 Siyan Ma Predawn water potential, reset dendrometers, fixed co2 profile system, fixed tram
Tonzi (176) 2014-06-25 04:30:00 Joe Verfaillie Predawn water potential, fixed CO2 profile calibration solenoids and dirty cell, fixed Tram bad wheel, mapped trees, checked tower sonic settings
Tonzi (162) 2014-06-11 05:00:00 Siyan Ma Predawn water potential, CO2 profile system down - needs cleaning, Swapped 7500 at Floor and Tower
Tonzi (142) 2014-05-22 05:30:00 Joe Verfaillie Predawn water potential, cleaned co2 profile cell, tram brought in for repair, z-cams serviced, no Tower phenocam images, Floor HMP45 fan replaced.
Tonzi (128) 2014-05-08 05:50:00 Siyan Ma Predawn water potential, reinstalled tram, Trouble connecting to data loggers at Vaira, no moisture point data, standard fieldwork.
Tonzi (112) 2014-04-22 05:45:00 Joe Verfaillie Predawn water potential, fix z-cam 1 wire, fixed CO2 profile, did not fix tram and floor hmp45 fan, condensation in diffuse sensor.
Tonzi (112) 2014-04-22 05:45:00 Siyan Ma Predawn water potential, standard field work, tower co2 profile broken - fixed, tram broken - not fixed, moved co2 probes at Vaira
Tonzi (98) 2014-04-08 06:30:00 Siyan Ma Standard field work, pre-dawn water potential, installed new CO2 soil probes
Tonzi (86) 2014-03-27 00:00:00 Siyan Ma oak leaf-out, grass green, no cows at either site, Checked CO2 probes at Vaira - ok, Removed last of sap flow east station, swapped CO2 profile CO2 tank, zcam 1 down, Moved CO2 probes at Tonzi
Tonzi (77) 2014-03-18 09:30:00 Siyan Ma Oak leaves came out 2 weeks early, CO2 profile CO2 tank empty, Rotated CO2 soil probes, removed one, swapped 7500 at Vaira
Tonzi (63) 2014-03-04 09:30:00 Siyan Ma Leaf out starting, swapped 7500s on Tower and Floor, No met data collected at Vaira due to dead battery
Tonzi (41) 2014-02-10 10:00:00 Joe Verfaillie Standard field work, ground is very wet, swapped CO2 profile inlet filters.
Tonzi (41) 2014-02-10 09:00:00 Siyan Ma Standard fieldwork, light rain, ground very wet from recent heavy rain.
Tonzi (29) 2014-01-29 13:00:00 Joe Verfaillie HUNGRY cows, reinstalled Vaisala CO2 soil profile, reinstall HMP45 in RH/Temp profile, removed folding arm, fix multiple breaks in tower fence.
Tonzi (24) 2014-01-24 09:10:00 Siyan Ma Very dry, 50 cows at Tonzi, Tower fence broken - fixed, removed Vaisala CO2 probes for calibration, CO2 profile large offsets and data logger readings do not match licor interface, tram reinstalled, lost empty CF card near tower.
Tonzi (7) 2014-01-07 10:45:00 Joe Verfaillie Tram not running - dead battery, CO2 profile pump not working - fixed, RH/temp profile problems - removed on HMP45, replaced LED filter, fixed z-cam cards.
Tonzi (7) 2014-01-07 09:00:00 Siyan Ma Standard fieldwork, tested wireless data transfer at Vaira, fixed CO2 profile
 
 

Login
Select Notes:

This material is based upon work supported by the National Science Foundation and US Department of Energy. Any opinions, findings, conclusions, or recommendations expressed in the material are those of the author(s) and do not necessarily reflect the views of the supporters.