Skip to main content
rice field banner biometlab logo
   
   
 
   
   
   
   
   
 
 

Field Notes

Fieldnotes Limited To:
Site = Tonzi
Year = 2009

2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024
31 Rows returned:
SiteDateAuthorSummary
Tonzi (356) 2009-12-22 09:00:00 Siyan Ma
When: Date: 12/22/2009 , Day: 356 , Watch Time: 9:00 .
Where: Tonzi/Vaira Ranch
Who: Siyan
Tonzi (333) 2009-11-29 06:00:00 Siyan Ma
When: Date: 11/29/2009 , Day: 333 , Watch Time: 6:00 .
Where: Tonzi/Vaira Ranch
Who: Siyan
Tonzi (309) 2009-11-05 10:00:00 Siyan Ma
When: Date: 11/5/2009 , Day: 309 , Watch Time: 10:00 .
Where: Tonzi/Vaira Ranch
Who: Siyan
Tonzi (301) 2009-10-28 11:45:00 Joe Verfaillie Tonzi 10-28-2009 Arrived about 11:45 PST. Clear, sunny, cool, windy. Put the tram back into place and it began run at 12:00 noon. And ran again at 1pm PDT. Removed the CNR1 from the top of the tower and put a K&Z NR-Lite in place. Downloaded d
Tonzi (295) 2009-10-22 05:40:00 Siyan Ma
When: Date: 10/22/2009 , Day: 295 , Watch Time: 5:40am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather:nice bre
Tonzi (275) 2009-10-02 10:30:00 Joe Verfaillie Installed Tram, Installed CNR1 for check, updated zcam 1 and 2.
Tonzi (275) 2009-10-02 09:00:00 Siyan Ma
When: Date: 10/2/2009 , Day: 275 , Watch Time: 9:00 .
Where: Tonzi/Vaira Ranch
Who: Dennis, Joe
Tonzi (261) 2009-09-18 12:00:00 Joe Verfaillie Tram brought in, swapped co2 profile tanks, copied data.
Tonzi (250) 2009-09-07 05:00:00 Siyan Ma html
When: Date: 9/7/2009 , Day: 250 , Watch Time: 5:00 .
Where: Tonzi/Vaira Ranch
Who: Siyan
Tonzi (214) 2009-08-02 05:00:00 Siyan Ma html
When: Date: 8/2/2009 , Day: 214 , Watch Time: 5:00 .
Where: Tonzi/Vaira Ranch
Who: Siyan
Tonzi (191) 2009-07-10 11:00:00 Dennis Baldocchi Tonzi: Arrived about 11am. Left new N2 tank. Old tank still have better than 500psi in it so I left it in place. Tram had stopped working. Coupling between motor and drive gears is broken. I will have to replace it and return it with the next pers
Tonzi (191) 2009-07-10 11:00:00 Joe Verfaillie Left new N2 tank, Tram broke coupling.
Tonzi (186) 2009-07-05 04:40:00 Siyan Ma html
When: Date: 7/5/2009 , Day: 186 , Watch Time: 4:40am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather: clea
Tonzi (172) 2009-06-21 04:56:00 Siyan Ma
When: Date: 6/21/2009 , Day: 172 , Watch Time: 4:56am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather:
Tonzi (161) 2009-06-10 09:30:00 Joe Verfaillie Zcam 3 setup
Tonzi (160) 2009-06-09 04:40:00 Siyan Ma
When: Date: 6/9/2009 , Day: 160 , Watch Time: 4:40am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather:
Tonzi (147) 2009-05-27 04:45:00 Siyan Ma
When: Date: 5/27/2009 , Day: 147 , Watch Time: 4:45am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather:
Tonzi (133) 2009-05-13 09:00:00 Joe Verfaillie Show Josep the site, installed two zenith cams, fixed tram maybe, no display on Floor computer.
Tonzi (127) 2009-05-07 05:00:00 Siyan Ma
When: Date: 5/7/2009 , Day: 127 , Watch Time: 5:00am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather:
Tonzi (114) 2009-04-24 09:00:00 Siyan Ma
When: Date: 4/24/2009 , Day: 114 , Watch Time: 9:00am .
Where: Tonzi/Vaira Ranch
Who: Siyan, Gretchen
Wea
Tonzi (107) 2009-04-17 05:10:00 Siyan Ma
When: Date: 4/17/2009 , Day: 107 , Watch Time: 5:10am .
Where: Tonzi/Vaira Ranch
Who: Siyan, Joe
Weather: clea
Tonzi (93) 2009-04-03 05:30:00 Siyan Ma
When: Date: 4/3/2009 , Day: 93 , Watch Time: 5:30am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather: cle
Tonzi (86) 2009-03-27 10:00:00 Siyan Ma
When: Date: 3/27/2009 , Day: 86 , Watch Time: 10:00am .
Where: Tonzi/Vaira Ranch
Who: Siyan, Gretchen
Tonzi (71) 2009-03-12 10:00:00 Siyan Ma
When: Date: 3/12/2009 , Day: 71 , Watch Time: 10:00am .
Where: Tonzi/Vaira Ranch
Who: Siyan, Joe, Gretchen
Tonzi (71) 2009-03-12 10:00:00 Joe Verfaillie Tram fixed, prototype zenith cam installed
Tonzi (58) 2009-02-27 00:00:00 Joe Verfaillie Tonzi 2-27-2009 1) New pump for CO2 profile installed. 2) Cal panel for web cam installed in lower left corner of image. 3) Radiation Railroad Robot reinstalled. The controlling program has been completely rewritten and still has a few bugs in i
Tonzi (58) 2009-02-27 00:00:00 Siyan Ma
When: Date: 2/27/2009 , Day: 58 , Watch Time: .
Where: Tonzi/Vaira Ranch
Who: Siyan, Joe, Dennis, Hideki, Gretch
Tonzi (41) 2009-02-10 09:30:00 Siyan Ma
When: Date: 2/10/2009 , Day: 41 , Watch Time: 9:30am .
Where: Tonzi/Vaira Ranch
Who: Siyan, Joe, Hideke
Tonzi (19) 2009-01-19 10:30:00 Siyan Ma
When: Date: 1/19/2009 , Day: 19 , Watch Time: 10:30am .
Where: Tonzi/Vaira Ranch
Who: Siyan, Joe
Wea
Tonzi (14) 2009-01-14 10:00:00 Siyan Ma
When: Date: 1/14/2009 , Day: 14 , Watch Time: 10:00am .
Where: Tonzi/Vaira Ranch
Who: Siyan, Joe, Gretchen
Tonzi (8) 2009-01-08 10:00:00 Siyan Ma Showing Sebastiaan Luyssaert the sites, cow fences had problems everywhere, Floor off due to low solar power, Swapped 7500, Tower CO2 profile pump broken, swapped Tower HMP45 shield.
 
 

Login
Select Notes:

This material is based upon work supported by the National Science Foundation and US Department of Energy. Any opinions, findings, conclusions, or recommendations expressed in the material are those of the author(s) and do not necessarily reflect the views of the supporters.