Skip to main content
rice field banner biometlab logo
   
   
 
   
   
   
   
   
 
 

Field Notes

Fieldnotes Limited To:
Site = Tonzi
Year = 2010

2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024
34 Rows returned:
SiteDateAuthorSummary
Tonzi (364) 2010-12-30 08:00:00 Siyan Ma Floor site computer died
Tonzi (343) 2010-12-09 09:00:00 Joe Verfaillie tower, floor power out, tram out - fixed, data copied, z-cam cards swapped, IRTs brough in, Floor computer clock reset.
Tonzi (316) 2010-11-12 10:00:00 Siyan Ma regular check; new soil moisture probes installed at Vaira
Tonzi (316) 2010-11-12 10:00:00 Siyan Ma regular check; new soil moisture probes installed at Vaira
Tonzi (316) 2010-11-12 09:40:00 Joe Verfaillie Reset time on z-cams, new CO2 profile pump.
Tonzi (301) 2010-10-28 10:00:00 Siyan Ma Swapped CO2 profile pump,collected Jaclyn's grass samples, swapped z-cam cards, grass sprouting.
Tonzi (280) 2010-10-07 11:30:00 Joe Verfaillie Show Sonia the towers, regular maintenance, fixed chewed z-cam 1 wire.
Tonzi (280) 2010-10-07 10:00:00 Siyan Ma Show Sonia the towers, swap LI7500s, standard field work.
Tonzi (253) 2010-09-10 12:00:00 Hideki Kobayashi Extensive LAI, canopy, and radiation measurements.
Tonzi (245) 2010-09-02 05:27:00 Siyan Ma Predawn water potential, standard field work, collected left and needle samples.
Tonzi (245) 2010-09-02 05:20:00 Joe Verfaillie predawn water potential, fix west and east sap flow stations, moved tipping bucket.
Tonzi (241) 2010-08-29 11:39:00 Jaclyn Hatala Field trip to Tonzi Ranch, Saturday 8/28/2010
Tonzi (231) 2010-08-19 10:30:00 Joe Verfaillie Tonzi 8/19/2010 I arrived about 10:30 PDT from Vaira. It was clear, sunny, and hot with very little wind at first but increasing towards midday. My first task was to fix the tram charging station. I put a fresh SLA battery inside the tram and fixed th
Tonzi (226) 2010-08-14 05:10:00 Siyan Ma html
When: Date: 8/14/2010 , Day: 226 , Watch Time: 5:10am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather: Sunny
Phenology: yellow g
Tonzi (217) 2010-08-05 09:30:00 Joe Verfaillie Tonzi 2010/8/5 Returned to Tonzi about 9:30PDT where Jaclyn was busy taking soil cores. The weather is clear, warm, and sunny with a little breeze. Talked to Mr. Tonzi about nothing of consequence. The trees still look happy and there is still some
Tonzi (197) 2010-07-16 09:00:00 Joe Verfaillie Jaclyn doing photo degradation, checked sap flow stations, cleaned tower battery terminals, removed surface renewal equipment
Tonzi (175) 2010-06-24 05:00:00 Joe Verfaillie Tonzi 6/24/2010 Arrived about 5am with Siyan for pre-dawn water potential. Not too cold and no wind before dawn. Warming to pleasant temperatures at midday, a few clouds but mostly sunny. The wind was light but increasing. The oaks look strong and
Tonzi (175) 2010-06-24 05:00:00 Siyan Ma
When: Date: 6/24/2010 , Day: 175 , Watch Time: 5:00 am .
Where: Tonzi/Vaira Ranch
Who: Siyan, Joe
Weather: n
Tonzi (161) 2010-06-10 10:00:00 Siyan Ma
When: Date: 6/10/2010 , Day: 161 , Watch Time: 10:00 .
Where: Tonzi/Vaira Ranch
Who: Siyan, De
Tonzi (148) 2010-05-28 05:10:00 Siyan Ma
When: Date: 5/28/2010 , Day: 148 , Watch Time: 5:10 am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather: partia
Tonzi (133) 2010-05-13 11:00:00 Siyan Ma
When: Date: 5/13/2010 , Day: 133 , Watch Time: 11:00 .
Where: Tonzi/Vaira Ranch
Who: Siyan, Jo
Tonzi (133) 2010-05-13 10:00:00 Joe Verfaillie Anders Ameriflux inter-comparison, LI7500 swap, IRT sensors cow chewed, two new N2 tanks.
Tonzi (120) 2010-04-30 06:10:00 Siyan Ma
When: Date: 4/30/2010 , Day: 120 , Watch Time: 6:10am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather: clear,
Tonzi (103) 2010-04-13 10:00:00 Joe Verfaillie Tonzi 4/13/2010 Arrived about 10am. Tonzi's pound is still full, ground is very wet like recent storm dropped a lot of rain. I fixed the under-story HMP45 solar shield, removing home made on and installing 12 plate gill with ventilation. Replac
Tonzi (92) 2010-04-02 06:00:00 Siyan Ma
When: Date: 4/2/2010 , Day: 92 , Watch Time: 6:00 am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather: cloudy, slight wind, a lot of dews, sta
Tonzi (80) 2010-03-21 11:30:00 Siyan Ma
When: Date: 3/21/2010 , Day: 80 , Watch Time: 11:30 .
Where: Tonzi/Vaira Ranch
Who: Siyan
Tonzi (75) 2010-03-16 09:00:00 Joe Verfaillie Tonzi pond nearly full, Installed a KZ NR-Lite and two PAR sensors, Tower tipping rain bucket needs cleaning.
Tonzi (64) 2010-03-05 09:50:00 Siyan Ma
When: Date: 3/5/2010 , Day: 63 , Watch Time: 9:50 am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather: partially
Tonzi (56) 2010-02-25 09:00:00 Joe Verfaillie Took detour to ranch, Tram not running, Several equipment in disrepair, Removed Vaisala CO2 probes, Little scorpions in bottom of the storage box.
Tonzi (41) 2010-02-10 11:00:00 Joe Verfaillie Installed Tram with 24VDC chargin station, left CO2 profile off, brought in old sap flow equipment.
Tonzi (41) 2010-02-10 10:00:00 Siyan Ma
When: Date: 2/10/2010 , Day: 41 , Watch Time: 10:00 .
Where: Tonzi/Vaira Ranch
Who: Siyan, DDB,
Tonzi (27) 2010-01-27 11:30:00 Joe Verfaillie Evidence of strong winds, consolidated soil co2 solar system, power out at Tower and soil co2
Tonzi (8) 2010-01-08 11:00:00 Joe Verfaillie Power outages at Floor and Tower, swapped soil co2 batteries, Floor computer not booting - had to use auxiliary battery.
Tonzi (8) 2010-01-08 09:50:00 Siyan Ma
When: Date: 1/8/2010 , Day: 8 , Watch Time: 9:50 .
Where: Tonzi/Vaira Ranch
Who: Siyan Joe Naa
 
 

Login
Select Notes:

This material is based upon work supported by the National Science Foundation and US Department of Energy. Any opinions, findings, conclusions, or recommendations expressed in the material are those of the author(s) and do not necessarily reflect the views of the supporters.