Site | Date | Author | Summary |
Tonzi |
(361) 2004-12-26 13:27:00 |
Siyan Ma |
Leaf and grass samples, no power on soil co2 cow fence, regeneration project
|
Vaira |
(361) 2004-12-26 11:40:00 |
Siyan Ma |
Laptop off - restated, standard fieldwork
|
Tonzi |
(350) 2004-12-15 13:50:00 |
Siyan Ma |
Swapped 7500s, Alex's isotopes samples, leaf samples, clip plots
|
Vaira |
(350) 2004-12-15 11:30:00 |
Siyan Ma |
Swapped 7500, clip plots
|
Tonzi |
(345) 2004-12-10 10:00:00 |
Ted Hehn |
Problems connecting to Tower co2 profile CR10X7, new battery from CR10X4 (sap Flow), new HMP fan
|
Vaira |
(344) 2004-12-09 13:00:00 |
Ted Hehn |
All is well, some water in 23x box due to wire pinch in door.
|
Vaira |
(336) 2004-12-01 13:00:00 |
Ted Hehn |
Fixed diffuse PAR leveling mount, all is well
|
Tonzi |
(333) 2004-11-28 13:00:00 |
Siyan Ma |
Restart both laptops, spectral measurements, clip plots
|
Vaira |
(333) 2004-11-28 13:00:00 |
Siyan Ma |
Cow fence battery dead, standard data collection
|
Vaira |
(325) 2004-11-20 10:30:00 |
Siyan Ma |
clip plots, spectral measurements
|
Vaira |
(307) 2004-11-02 10:30:00 |
Siyan Ma |
Swapped 7500, grass beginning to grow, soil samples, spectral measurements
|
Vaira |
(306) 2004-11-01 10:00:00 |
Ted Hehn |
Quick check - all is well
|
Vaira |
(296) 2004-10-22 15:00:00 |
Ted Hehn |
Flux system losing power over night, reconnected two solar panels for winter, Diffuse PAR mis-wired - fixed, ppt bucket wire broken, fixed and tested, swapped soil moisture probe, change soil moisture warm up to 5sec
|
Vaira |
(287) 2004-10-13 13:09:00 |
Siyan Ma |
Standard fieldwork, all seems well
|
Tonzi |
(287) 2004-10-13 10:35:00 |
Siyan Ma |
Swapped 7500s, Floor screen still bad, JPL will fly site, spectra measurements, tree leaf samples - leaves yellowing
|
Vaira |
(282) 2004-10-08 13:00:00 |
Ted Hehn |
Quick check after working at Tonzi - all is well
|
Vaira |
(280) 2004-10-06 13:00:00 |
Ted Hehn |
Quick check after working at Tonzi - All is well
|
Tonzi |
(265) 2004-09-21 11:16:00 |
Siyan Ma |
Floor laptop screen dying, Tower co2 profile shutdown - Li-800 brought in, Open soil CO2 battery dead, tree leaf samples
|
Vaira |
(265) 2004-09-21 10:04:00 |
Siyan Ma |
Very dry, Swapped 7500, all is well
|
Vaira |
(260) 2004-09-16 09:00:00 |
Matthias Falk |
Quick systems check
|
Tonzi |
(252) 2004-09-08 10:15:00 |
Siyan Ma |
Moisture point read, tree leaves collected, standard fieldwork
|
Vaira |
(252) 2004-09-08 09:45:00 |
Siyan Ma |
Ten days lost due to laptop hang, soil moisture
|
Tonzi |
(240) 2004-08-27 10:45:00 |
Siyan Ma |
2 days lost on Floor eddy, Tower co2 profile cell temp low, no moisture point readings - dead battery,
|
Vaira |
(240) 2004-08-27 09:50:00 |
Siyan Ma |
Standard fieldwork - all is well
|
Vaira |
(230) 2004-08-17 17:30:00 |
Siyan Ma |
10 days eddy data lost due to laptop hang
|
Tonzi |
(230) 2004-08-17 10:30:00 |
Siyan Ma |
Swapped 7500s for calibration, Tower laptop not running 3 days lost, leaf samples, standard fieldwork
|
Vaira |
(218) 2004-08-05 12:50:00 |
Siyan Ma |
Standard fieldwork, first download from new data logger, soil samples?
|
Tonzi |
(218) 2004-08-05 09:41:00 |
Siyan Ma |
Soil samples for bulk density and moisture, leaf samples, set up Floor regeneration study
|
Vaira |
(207) 2004-07-25 10:00:00 |
Ted Hehn |
Power up and debug on rebuilt met system
|
Vaira |
(207) 2004-07-25 07:02:00 |
Ted Hehn |
Finish up rebuild of met system, set up software
|
Vaira |
(205) 2004-07-23 10:00:00 |
Ted Hehn |
Rewiring met sesnors
|
Vaira |
(204) 2004-07-22 08:02:00 |
Ted Hehn |
Start re-configuring met systems
|
Vaira |
(203) 2004-07-21 14:41:00 |
Siyan Ma |
Standard fieldwork, Ted with upgrade data loggers tomorrow
|
Tonzi |
(203) 2004-07-21 11:00:00 |
Siyan Ma |
Leaf samples, new CO2 N2 tanks for Tower co2 profile,
|
Vaira |
(190) 2004-07-08 14:08:00 |
Siyan Ma |
swapped 7500, power line still needs permanent splice, radiation boom installed
|
Tonzi |
(190) 2004-07-08 10:30:00 |
Siyan Ma |
Swapped 7500s, leaf samples, trouble connecting to data loggers
|
Vaira |
(159) 2004-06-07 13:00:00 |
Siyan Ma |
Broke power line with soil core, soil cores for bulk density
|
Tonzi |
(159) 2004-06-07 10:00:00 |
Siyan Ma |
Soil Samples for bulk density, Tower cow fence open and unpowered, Oak leaves collected from trees.
|
Tonzi |
(152) 2004-05-31 09:48:00 |
Ted Hehn |
Data download, fix power on soil co2 system
|
Vaira |
(152) 2004-05-31 09:30:00 |
Ted Hehn |
Data download, cleaned radiometers, all is well
|
Tonzi |
(142) 2004-05-21 00:00:00 |
Siyan Ma |
Swapped 7500s, changed pump in tower co2 profile, took oak leaves for LAI, C/N etc
|
Vaira |
(142) 2004-05-21 00:00:00 |
Siyan Ma |
Standard fieldwork, fix filenames
|
Vaira |
(139) 2004-05-18 13:00:00 |
Ted Hehn |
Downloaded data, all is well, todo list
|
Tonzi |
(139) 2004-05-18 10:00:00 |
Ted Hehn |
Tower sonic hung up, Tower co2 profile pump dead, change Tower co2 profile program
|
Vaira |
(127) 2004-05-06 13:09:00 |
Dennis Baldocchi |
Siyan's first visit, standard fieldwork, clip plots
|
Vaira |
(121) 2004-04-30 09:00:00 |
Ted Hehn |
All is well, todo list
|
Vaira |
(114) 2004-04-23 12:00:00 |
Dennis Baldocchi |
Grass starting to yellow, clip plots, grass height
|
Vaira |
(111) 2004-04-20 10:00:00 |
Ted Hehn |
Radiometer inter-comparison notes
|
Vaira |
(100) 2004-04-09 08:30:00 |
Dennis Baldocchi |
Ameriflux inter-comparison, standard fieldwork, clip plots
|
Vaira |
(99) 2004-04-08 19:00:00 |
Ted Hehn |
Ameriflux inter-comparison, sonic heading 234
|
Tonzi |
(99) 2004-04-08 14:44:00 |
Ted Hehn |
Tower computer crashed - three days lost, level pyranometer
|
Vaira |
(98) 2004-04-07 16:00:00 |
Ted Hehn |
swapped 7500, leveled sonic, begin Ameriflux inter-comparison, todo list
|
Vaira |
(85) 2004-03-25 13:00:00 |
LiuKang Xu |
Standard fieldwork - all ok
|
Tonzi |
(85) 2004-03-25 10:00:00 |
LiuKang Xu |
Grass grows a lot, all ok, clip plots
|
Vaira |
(72) 2004-03-12 13:00:00 |
LiuKang Xu |
Cow fence off, all seems well
|
Tonzi |
(72) 2004-03-12 10:00:00 |
LiuKang Xu |
Bird poop on Tower 7500 window, Tress beginning to leaf out
|
Tonzi |
(66) 2004-03-06 17:45:00 |
Ted Hehn |
Gillsonic.exe failed to get serial port on boot.
|
Vaira |
(66) 2004-03-06 15:09:00 |
Ted Hehn |
Swap old AM416 with new AM16/32, SHF plates coefficients confirmed, todo list.
|
Vaira |
(65) 2004-03-05 13:00:00 |
LiuKang Xu |
Blown fuse lost ten days of data, clip plots
|
Tonzi |
(65) 2004-03-05 10:00:00 |
LiuKang Xu |
Tower laptop swapped, clip plots, moisture point, DBH
|
Tonzi |
(64) 2004-03-04 10:00:00 |
Ted Hehn |
Removed solar and battery fuses on Floor system, Tower laptop swapped,
|
Vaira |
(64) 2004-03-04 10:00:00 |
Ted Hehn |
Removed solar and battery fuses, disturbed theta probe, added radiation calibration sensors
|
Vaira |
(30) 2004-01-30 00:00:00 |
LiuKang Xu |
swapped 7500, standard fieldwork
|
Vaira |
(23) 2004-01-23 13:00:00 |
LiuKang Xu |
Standard fieldwork, lots of missing data from day 016-021
|
Tonzi |
(23) 2004-01-23 10:00:00 |
LiuKang Xu |
PC box left open, Floor missing lots of data due to solar system failing.
|
Vaira |
(13) 2004-01-13 13:00:00 |
Ted Hehn |
Move rain bucket away from radiometers, laptop crashed twice - reset, todo list for site upgrade
|
Tonzi |
(13) 2004-01-13 10:00:00 |
Ted Hehn |
Reinstall Tower computer, Wind profile sensor heights, fixed Tower HMP fan
|
Vaira |
(8) 2004-01-08 13:00:00 |
Dennis Baldocchi |
Clocks one hour behind - reset
|