Site | Date | Author | Summary |
Tonzi |
(352) 2011-12-18 00:00:00 |
Siyan Ma |
checked and downloaded data at Tower, Floor, and Vaira, Swapped Li-7500 at TZ Tower and Floor, Li-800 showed "-9999", not working in the field, taken
back to the lab, Collected oak litter of this fall within 1x1 m2
square
|
Tonzi |
(335) 2011-12-01 10:00:00 |
Joe Verfaillie |
Check Stardot, replace SFH5, brought sap flow serial lines out of the trees, fixed sap flow west and south.
|
Tonzi |
(335) 2011-12-01 09:00:00 |
Siyan Ma |
Standard field work. Laurie and Erika tried soil cores and tree cores.
|
Tonzi |
(320) 2011-11-16 12:00:00 |
Joe Verfaillie |
Fixed Stardot ethernet, removed N2 scrub and recaled LI810, Changed cr10x2_soiltemp program, fixed two STC and removed SHF5, serviced z-cams.
|
Tonzi |
(313) 2011-11-09 09:20:00 |
Siyan Ma |
Standard field work.
|
Tonzi |
(306) 2011-11-02 10:00:00 |
Joe Verfaillie |
Checked refocused Stardot camera, fixed labels in Loggernet on floor computer, replaced flowmeter in co2 profile system, did EMI survey, cleaned z-cam windows, tree circumfrence.
|
Tonzi |
(299) 2011-10-26 09:30:00 |
Joe Verfaillie |
Swapped CO2 profile IRGA, possibly sticky solinoid, sticky flow meter, fixed focus and network for stardot camera, serviced z-cams.
|
Tonzi |
(299) 2011-10-26 09:00:00 |
Siyan Ma |
Standard field work, Fixed CO2 profile system.
|
Tonzi |
(291) 2011-10-18 09:30:00 |
Joe Verfaillie |
Swapped Floor 7500, Installed Stardot camera. Did EMI survey.
|
Tonzi |
(286) 2011-10-13 11:00:00 |
Joe Verfaillie |
Swapped LI800-820, Walked EMI survey.
|
Tonzi |
(286) 2011-10-13 11:00:00 |
Siyan Ma |
Grass is up, Vaira 7500 down and swapped with Frank's, Stardot camera added to Vaira, swapped co2 profile IRGA, EMI survey.
|
Tonzi |
(272) 2011-09-29 10:00:00 |
Siyan Ma |
Standard fieldwork, CO2 profile system not working, error message on Floor computer.
|
Tonzi |
(266) 2011-09-23 10:00:00 |
Joe Verfaillie |
EMI survey, Tower IRGA blocked by bird dropping - cleaned, Floor computer okay, Dead tree list, changed z-cam programs.
|
Tonzi |
(259) 2011-09-16 09:00:00 |
Joe Verfaillie |
Rebuilt Floor solar battery pack. Replaced Floor computer.
|
Tonzi |
(243) 2011-08-31 09:30:00 |
Joe Verfaillie |
Standard field work, new sunset z-cam program works, strange growths on tree leaves, broke tree corer, trees beginning to yellow.
|
Tonzi |
(221) 2011-08-09 09:30:00 |
Joe Verfaillie |
Standard field work. Fixed adjusted zcam programs for sunset refference, Floor computer hung in boot, MD9 connections unstable, tree 4cm co2 probe bad.
|
Tonzi |
(201) 2011-07-20 12:30:00 |
Joe Verfaillie |
Change z-cam 1 and 2 program to sunset version, measured tower instruments.
|
Tonzi |
(187) 2011-07-06 11:00:00 |
Siyan Ma |
Need new tank for water potetial, PC at Vaira crashed - restarted, maybe need fan for box, swapped LI7500 at TZ Tower and Vaira.
|
Tonzi |
(166) 2011-06-15 11:00:00 |
Siyan Ma |
Standard fieldwork, midday water potential.
|
Tonzi |
(154) 2011-06-03 10:30:00 |
Joe Verfaillie |
Setting up isoprene REA system, z-cam service, fix renaming time on floor computer, reset tower sonic/IRGA mount.
|
Tonzi |
(147) 2011-05-27 09:30:00 |
Siyan Ma |
Standard field work and met with University of Michigan group intersted in soil moisture.
|
Tonzi |
(130) 2011-05-10 08:20:00 |
Joe Verfaillie |
COSMOS probe install, Finishing root survey, Standard field work.
|
Tonzi |
(125) 2011-05-05 09:30:00 |
Joe Verfaillie |
Continuing root survey with GPR, pits and cores.
|
Tonzi |
(124) 2011-05-04 09:00:00 |
Joe Verfaillie |
Continuing root survey with GPR, pits and cores.
|
Tonzi |
(123) 2011-05-03 09:30:00 |
Joe Verfaillie |
Beginning or root survey with GPR, pits, and cores.
|
Tonzi |
(112) 2011-04-22 00:00:00 |
Siyan Ma |
Tower Li-7500 worked well
|
Tonzi |
(105) 2011-04-15 12:00:00 |
Joe Verfaillie |
Serviced z-cams - advanced image collection one hour, Fixed unsetup DAC channels on tower LI-7500, changed co2 profile filters.
|
Tonzi |
(105) 2011-04-15 00:00:00 |
Siyan Ma |
Tonzi: 100% oak leaf out
|
Tonzi |
(89) 2011-03-30 10:45:00 |
Joe Verfaillie |
swapped tower LI7500, serviced z-cams, fixed water pluggin lowest co2 profile inlet, new fan from floor HMP45.
|
Tonzi |
(89) 2011-03-30 00:00:00 |
Siyan Ma |
tree leaf start coming out
|
Tonzi |
(70) 2011-03-11 10:30:00 |
Joe Verfaillie |
Swapped solar power battery bank, restarted co2 profile.
|
Tonzi |
(67) 2011-03-08 11:00:00 |
Joe Verfaillie |
Fixed tram, Moved tipping bucket, updated soil co2 data logger program, fixed all cow fences, serviced z-cams, fixed west sap flow station.
|
Tonzi |
(53) 2011-02-22 00:00:00 |
Siyan Ma |
Tower batteries need to be replaced because no nighttime data.
|
Tonzi |
(34) 2011-02-03 12:15:00 |
Joe Verfaillie |
Swapped tram battery, collected data, spectra, moisture point. Brought in floor supplimental sensors.
|
Tonzi |
(19) 2011-01-19 00:00:00 |
Siyan Ma |
power problem at Vaira and Tonzi-Tower
|
Tonzi |
(5) 2011-01-05 08:00:00 |
Siyan Ma |
Installed new computer at Floor site, swapped Floor and Tower LI-7500.
|