Field Notes

Fieldnotes Limited To:
Site = Vaira
Year = 2012

2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024
39 Rows returned:
SiteDateAuthorSummary
Vaira (354) 2012-12-19 10:15:00 Joe Verfaillie Power out but fixed, multiplexor reset, CR1000 program changed, computer battery changed.
Vaira (346) 2012-12-11 09:20:00 Joe Verfaillie Flux power out for 11 days due to blown fuse.
Tonzi (346) 2012-12-11 09:00:00 Siyan Ma Standard field work, Tower CO2 profile down, serviced Vaisala probes, serviced z-cams
Vaira (320) 2012-11-15 09:00:00 Joe Verfaillie Cows got inside the fence, fixed fence, restarted computer.
Tonzi (312) 2012-11-07 09:30:00 Siyan Ma Swapped Floor 7500, reinstalled LI800, reinstalled SHF plates, Standard fieldwork.
Vaira (312) 2012-11-07 09:00:00 Joe Verfaillie Reinstalled SHF plate, installed Vaisala relay and changed program, restarted computer.
Tonzi (298) 2012-10-24 11:30:00 Siyan Ma Just after first rain of the fall, Tree dendrometers read, Swapped 7500 at tower and Vaira, Co2 Profile down, Standard fieldwork.
Vaira (283) 2012-10-09 09:00:00 Joe Verfaillie Tested HMP45, checked data logger batteries.
Tonzi (283) 2012-10-09 05:50:00 Siyan Ma Pre-dawn water potential, Oaks 80-90% senescent, standard field work, Joe installed CR1000s at Tonzi, Tram broken, Tower IRGA fouled and cleaned.
Vaira (263) 2012-09-19 07:00:00 Joe Verfaillie Standard field work, fixed auto rename run time, USC has been working here again.
Tonzi (263) 2012-09-19 05:30:00 Siyan Ma Standard field work, reinstalled CO2 profile IRGA, fixed daily rename at Vaira.
Vaira (249) 2012-09-05 07:30:00 Joe Verfaillie Swapped CR1000 card, added serail port for CR1000, removed SHF plate for calibration.
Tonzi (249) 2012-09-05 05:30:00 Siyan Ma Predawn water potential - new tank, standard field work, swapped new CR1000 card at Vaira, removed two SHF plates for cal, co2 profile down for IRGA service.
Vaira (235) 2012-08-22 10:30:00 Joe Verfaillie Added CR1000 to collect flux data, removed old web cam, reset computer clock and data logger clocks, lots of brown leaves.
Tonzi (235) 2012-08-22 10:30:00 Siyan Ma Lots of brown leaves, midday water potential, standard field work, Martin did leaf survey.
Vaira (221) 2012-08-08 16:30:00 Joe Verfaillie USC soil moisture orientation, fixed overheating computer.
Tonzi (207) 2012-07-25 05:30:00 Siyan Ma Standard fieldwork, swapped 7500s at all towers, removed CO2 profile pump.
Vaira (192) 2012-07-10 09:00:00 Joe Verfaillie Fixed serial connection for soil CO2 system, removed Pyranometer for repair.
Tonzi (186) 2012-07-04 05:20:00 Siyan Ma Swapped tank and measured water potential, standard field work.
Tonzi (151) 2012-05-30 09:30:00 Siyan Ma Grasses are senescent, tried swapping Floor IRGA but new IRGA had bad water, well batteries bad, could not collect Vaira soil CO2 data.
Vaira (145) 2012-05-24 11:30:00 Joe Verfaillie EMI survey.
Tonzi (139) 2012-05-18 09:00:00 Siyan Ma Grass becoming senescent, tree leaves complete, swapped 7500s at Tower and Vaira, data not collected.
Vaira (125) 2012-05-04 09:30:00 Joe Verfaillie Chinese visitors, computer bobble, fixed CNR1 CM3 in.
Tonzi (125) 2012-05-04 09:30:00 Siyan Ma Showing Chinese Visitors the site, standard fieldwork.
Vaira (114) 2012-04-23 08:30:00 Joe Verfaillie replaced tower computer, diffuse PAR sensor, soil co2 data logger power supply.
Vaira (110) 2012-04-19 09:30:00 Joe Verfaillie Naama did an EMI survey, tower computer had crashed and would not reboot, brought in diffuse PAR sensor for cable repair.
Tonzi (110) 2012-04-19 09:30:00 Siyan Ma Sonia and Jessica launching weather ballons, Naama did EMI survey at Vaira, Laurie took soil sample at Tonzi, Vaira computer crashed - removed, Diffuse PAR removed for repair
Vaira (96) 2012-04-05 09:30:00 Joe Verfaillie AM16/32 offset again, added ground wire to soil CO2 cr10x, brought in N2 tank from Ameriflux comparison. Green grass and trees.
Tonzi (96) 2012-04-05 09:30:00 Siyan Ma Standard field work, Met Sonia and Jessica who installed a Lidar profiler near the soil CO2 site.
Tonzi (81) 2012-03-21 09:00:00 Siyan Ma Installed CO2 probes in ground at Vaira, Martin doing tree scans at Tonzi, Laurie taking soil cores.
Vaira (81) 2012-03-21 09:00:00 Joe Verfaillie Replaced new soil co2 batteries, installed soil co2 probes, reinstalled SHF plate 3, reset cr23x to fix am16/32, oak tree leaves starting
Vaira (79) 2012-03-19 10:40:00 Joe Verfaillie Meet Stephen Chan for Ameriflux inter-comparison, new soil co2 batteries dead - removed, reset CR23X to fix AM16/32 problem, SHF plate removed for repair.
Tonzi (62) 2012-03-02 11:00:00 Siyan Ma Sonia and Matthias choose location for LIDAR, cows in Viara cow fence, diffuse radiations stablized, 3rd soil co2 profile installed at Tonzi.
Tonzi (47) 2012-02-16 09:30:00 Siyan Ma Installed soil co2 equipment at Vaira (probes not in ground yet), reinstalled soil co2 profiles at Tonzi
Vaira (47) 2012-02-16 09:00:00 Joe Verfaillie New soil CO2 equipment setup but probes not in ground, Met AM16/32 having problems.
Vaira (32) 2012-02-01 12:00:00 Joe Verfaillie Cows got inside the cow fence, extended cow fence for soil co2 install, low solar power, changed pyranometer desiccant.
Tonzi (32) 2012-02-01 09:00:00 Siyan Ma Standard field work, extended cow fence at Varia.
Tonzi (18) 2012-01-18 09:30:00 Siyan Ma Tried to reinstall LI820 for co2 profile - didn't work, swapped co2 profile co2 and N2 tanks.
Tonzi (4) 2012-01-04 09:30:00 Siyan Ma Grasses look stressed by dryness, bird droppings on Tonzi Tower 7500, tower hmp45 fan dead, tram not moving.