Site | Date | Author | Summary |
Vaira |
(113) 2024-04-22 11:06:00 |
Joe Verfaillie |
Standard data collection, went to the pond, trees still not 100% full of leaves.
|
Vaira |
(101) 2024-04-10 11:20:00 |
Joe Verfaillie |
Standard fieldwork, new cable for north FD, Jaz battery dead, lots of cows, trees still putting on leaves
|
Vaira |
(86) 2024-03-26 10:13:00 |
Joe Verfaillie |
Swapped 7500 for calibration, added repaired FD chamber to north location, removed old HMP45, standard fieldwork.
|
Vaira |
(67) 2024-03-07 12:30:00 |
Joe Verfaillie |
Quick stop to collect data, less than usual two week interval to reduce work load next week.
|
Vaira |
(58) 2024-02-27 11:30:00 |
Joe Verfaillie |
Added new HYGROVUE RH/T sensor, will compare before removing old HMP45, New program improvements to RevBow calculations, removed Decagon SRS NDVI sensors, Pond CR10x seems working
|
Vaira |
(47) 2024-02-16 14:30:00 |
Joe Verfaillie |
Checked on pond CR10x, tightened screws on power connector, reloaded program.
|
Vaira |
(40) 2024-02-09 11:15:00 |
Joe Verfaillie |
Jackie from Keenan lab visiting, very wet, pond full, swapped Arable Mark3, some missing data from the pond, big storms tilted solar panel, new tree down
|
Vaira |
(25) 2024-01-25 11:30:00 |
Joe Verfaillie |
Standard fieldwork, checked on BF3
|
Vaira |
(2) 2024-01-02 10:20:00 |
Joe Verfaillie |
End of year field work, swapped 7500 for calibration, all seems well
|