Skip to main content
rice field banner biometlab logo
   
   
 
   
   
   
   
   
 
 

Field Notes

Fieldnotes Limited To:
Site = Tonzi
Year = 2019

2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024
44 Rows returned:
SiteDateAuthorSummary
Tonzi (353) 2019-12-19 11:30:00 Joe Verfaillie Grass is growing, trees are bare, standard fieldwork, fixed TC on FLIR, problems with FLIR cal equipment, collected FD data, electric fences back on.
Tonzi (353) 2019-12-19 11:00:00 Siyan Ma Grass is growing, tree have lost all leaves, standard fieldwork.
Tonzi (350) 2019-12-16 00:00:00 Ana Andreu Mendez Thermal camara re-install, crown diameters from oak and pine taken
Tonzi (337) 2019-12-03 09:30:00 Joe Verfaillie First rains of the wet season, Ana collected emissivity samples, brought in FLIR camera, first FD Chamber data
Tonzi (323) 2019-11-19 12:15:00 Joe Verfaillie Swapped Tower 7500, replace Floor 7500, Removed DFRobot IRT looking at grass, installed two FD chambers at soil co2.
Tonzi (323) 2019-11-19 11:00:00 Siyan Ma Standard data collection, swapped 7500s for calibration, added FD chambers to Tonzi soil co2
Tonzi (311) 2019-11-07 11:30:00 Joe Verfaillie Visitors from LBNL, Standard data collection, tested two remaining tipping buckets, fixed unplugged Arable, Removed Floor 7500 head for use at Vaira
Tonzi (311) 2019-11-07 10:00:00 Siyan Ma LBNL visitors, Standard fieldwork, lowered Road Well sensor.
Tonzi (297) 2019-10-24 11:00:00 Joe Verfaillie Standard fieldwork, trees turning brown, Tested two tipping buckets, took black body images with FLIR
Tonzi (297) 2019-10-24 09:00:00 Siyan Ma Standard fieldwork, testing rain buckets
Tonzi (282) 2019-10-09 11:15:00 Daphne Szutu Regular data collection, trees starting to lose leaves
Tonzi (282) 2019-10-09 10:00:00 Siyan Ma Standard fieldwork
Tonzi (268) 2019-09-25 11:00:00 Joe Verfaillie Recent rains, upgraded Ethernet switch and added co2 profile CR6 to the network, standard data collection, midday water potential.
Tonzi (268) 2019-09-25 10:00:00 Siyan Ma Standard data collection, some recent rain
Tonzi (252) 2019-09-09 11:30:00 Joe Verfaillie Standard data collection, no Phenocam images, partial midday water potential, Tree 79 needs DBH gauge.
Tonzi (234) 2019-08-22 11:30:00 Joe Verfaillie Swapped 7500s, standard data collection, swapped soil co2 solar batteries, missed downloading Floor well, midday water potential
Tonzi (234) 2019-08-22 10:30:00 Siyan Ma Standard data collection, swapped 7500s, swapped Tonzi soil co2 solar batteries.
Tonzi (218) 2019-08-06 11:30:00 Daphne Szutu Regular data collection
Tonzi (218) 2019-08-06 10:00:00 Siyan Ma Standard fieldwork, midday water potential
Tonzi (197) 2019-07-16 11:30:00 Joe Verfaillie dry and crispy, forgot equipment could not download Floor well and soil co2, swapped out FLIR cal panel CR10X for 23X, Remounted Arable and connected to tower power, checked on soil co2 battery bank and CR1000 IRTs system.
Tonzi (197) 2019-07-16 10:30:00 Siyan Ma Standard fieldwork, missing USB-serial cable so could not collect soil co2 and floor well data. midday water potential
Tonzi (183) 2019-07-02 11:30:00 Joe Verfaillie Standard fieldwork, added Arable to top of tower, soilco2 losing power over night, neighbor's barn burned down
Tonzi (183) 2019-07-02 10:00:00 Siyan Ma Standard fieldwork, went to the pond, midday water potential
Tonzi (164) 2019-06-13 11:00:00 Joe Verfaillie Tower computer okay, FLIR cal IRT programs could use some work, reinstall tree 102 DBH scale, checked COSMOS, lots of flowers
Tonzi (164) 2019-06-13 10:00:00 Siyan Ma Standard field work, midday water potential, still somewhat green, lots of flowers
Tonzi (150) 2019-05-30 11:30:00 Joe Verfaillie Still damp from recent rains, fixed FLIR focus, Added Apogee and DFRobot IRTs, regular fieldwork
Tonzi (150) 2019-05-30 10:00:00 Siyan Ma Standard fieldwork, clip plots, midday water potential, still some green grass and more flowers.
Tonzi (134) 2019-05-14 09:30:00 Joe Verfaillie LBL/Mirage Systems ECOSTRESS ground truth survey, Standard fieldwork, reset two dendrometers, road well clock ahead by 10min - reset
Tonzi (127) 2019-05-07 09:30:00 Joe Verfaillie Reinstalled Floor IRGA, Fixes Floor well cable, undated file names on Tower computer, brought in fence charger from Floor solar panel fence.
Tonzi (120) 2019-04-30 12:30:00 Joe Verfaillie Tower power down and Tower Licor box dead, moved Floor IRGA to Tower, swapped 7500 for calibration, Soil samples for moisture, C/N, microbial community, gate combo lock broken
Tonzi (106) 2019-04-16 11:30:00 Joe Verfaillie Rain last night, radio connection for OSU SP1, new fan for Tower HMP45, old FLIR cal panel removed. First midday water potential of the season.
Tonzi (106) 2019-04-16 10:00:00 Siyan Ma Wet from last night's rain, Trees have leaves - first midday water potential of the season
Tonzi (88) 2019-03-29 10:30:00 Joe Verfaillie Standard fieldwork, wet, leaves coming out, LattePanda okay, Tower HMP45 fan broken, tags for DBH trees, more evidence of pigs.
Tonzi (88) 2019-03-29 09:00:00 Siyan Ma Standard fieldwork, trees are putting on leaves.
Tonzi (70) 2019-03-11 11:30:00 Joe Verfaillie Regular fieldwork, green and wet, SMAP crew left wheel tracks, added new computer and radios, cleaned acorns out of JPL boxes, evidence of wild pigs, Ana made distance measurements from FLIR
Tonzi (51) 2019-02-20 10:30:00 Joe Verfaillie Cold and wet, reinstalled C4 dendrometer, standard fieldwork, updated soil co2 program
Tonzi (51) 2019-02-20 09:00:00 Siyan Ma Standard fieldwork, cold and wet, added SRS NDVI to Vaira, clip plots
Tonzi (38) 2019-02-07 10:00:00 Joe Verfaillie Showing the site to Kuno, Robert, Baptiste and George. SMAP/Mariage Systems tour, very wet, Rob says wild pigs present, open soil co2 not working
Tonzi (22) 2019-01-22 11:00:00 Joe Verfaillie Very wet but ground water still recovering, dead wood fallen, fixed Floor and Road well logging.
Tonzi (22) 2019-01-22 09:30:00 Siyan Ma Standard fieldwork, grass samples, Joe fixed TX well loggers.
Tonzi (14) 2019-01-14 10:20:00 Joe Verfaillie Fixed Tower power, powered new FLIR cal panel, fixed Floor well, fixed/replaced HMP45 fans.
Tonzi (13) 2019-01-13 10:00:00 Ana Andreu Mendez Installed new cal panel for the FLIR, Discovered Tower power down due to blown fuse.
Tonzi (4) 2019-01-04 10:30:00 Joe Verfaillie Swapped 7500s, well sensors not working, test hole for fence post, fixed chewed cable on OSU SP1 solar panel
Tonzi (4) 2019-01-04 09:00:00 Siyan Ma Swapped 7500s, measured newly discovered well at Vaira, standard field work
 
 

Login
Select Notes:

This material is based upon work supported by the National Science Foundation and US Department of Energy. Any opinions, findings, conclusions, or recommendations expressed in the material are those of the author(s) and do not necessarily reflect the views of the supporters.