Field Notes

Fieldnotes Limited To:
Site = Vaira
Year = 2014
2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024
33 Rows returned:
SiteDateAuthorSummary
Tonzi (357) 2014-12-23 09:00:00 Siyan Ma Ponds are full, swapped 7500s at Tonzi, Brought in LI-820, Tower sonic hung up again.
Vaira (343) 2014-12-09 09:00:00 Joe Verfaillie Maintained Vaisala CO2 probes, standard field work
Tonzi (343) 2014-12-09 09:00:00 Siyan Ma Standard field work, clip plots, grass height, power outages do to low sunlight at Tonzi, CO2 profile not working
Tonzi (330) 2014-11-26 09:40:00 Siyan Ma Grass germinated, still oak leaves at Vaira, fixed Tonzi tower fence, no 7500 analog data at Floor - digital okay, standard field work.
Tonzi (317) 2014-11-13 09:30:00 Siyan Ma Standard fieldwork, rain last night and a little this morning, Tower fence broken, did not collect z-cam images
Tonzi (297) 2014-10-24 10:30:00 Siyan Ma Standard fieldwork, all went well, Tower fence broken - fixed
Vaira (280) 2014-10-07 08:00:00 Joe Verfaillie Finished barbed wire fence, buried remains of dead calf, improved solar panel position.
Tonzi (273) 2014-09-30 09:30:00 Siyan Ma A little rain last week, trees turning brown - not so much at Vaira, Cows broke fences at Tonzi, begin new fence at Vaira, CO2 profile needs fixing, swapped Floor 7500.
Vaira (273) 2014-09-30 09:30:00 Joe Verfaillie Standard field work, a little rain last week, started upgrading fence to barbed wire.
Tonzi (254) 2014-09-11 09:20:00 Siyan Ma Standard fieldwork, Joe fixed fence at Vaira, reinstalled CO2 profile system, trees starting to turn color, midday water potential
Vaira (254) 2014-09-11 09:15:00 Joe Verfaillie Rewired met power to main solar, new fence charger, swapped 7500, solar panels dirty, soil co2 need reset.
Vaira (233) 2014-08-21 09:00:00 Joe Verfaillie Standard field work, fixed cow fence, met solar panels not pointed at the sun - fixed.
Tonzi (233) 2014-08-21 09:00:00 Siyan Ma Standard field work, co2 profile system down - IGRA brought it, midday water potential, litter biomass.
Tonzi (217) 2014-08-05 09:40:00 Siyan Ma Trees started to change color, did not span co2 profile, tram and co2 profile files need daily split set up.
Tonzi (190) 2014-07-09 04:50:00 Siyan Ma Predawn water potential, new tank for midday potential, standard field work, Joe replaced tower computer.
Vaira (183) 2014-07-02 12:30:00 Joe Verfaillie Cleared grass about the cow fence.
Vaira (176) 2014-06-25 08:30:00 Joe Verfaillie Standard field work, missed collecting latest me data, checked sonic settings.
Tonzi (176) 2014-06-25 04:40:00 Siyan Ma Predawn water potential, reset dendrometers, fixed co2 profile system, fixed tram
Tonzi (162) 2014-06-11 05:00:00 Siyan Ma Predawn water potential, CO2 profile system down - needs cleaning, Swapped 7500 at Floor and Tower
Vaira (142) 2014-05-22 08:15:00 Joe Verfaillie Standard field work. Soil co2 sensors need reinstall. Grass is tall.
Tonzi (128) 2014-05-08 05:50:00 Siyan Ma Predawn water potential, reinstalled tram, Trouble connecting to data loggers at Vaira, no moisture point data, standard fieldwork.
Vaira (112) 2014-04-22 09:00:00 Joe Verfaillie Standard fieldwork, reset Phenocam clock, cleaned weeds from solar panels.
Tonzi (112) 2014-04-22 05:45:00 Siyan Ma Predawn water potential, standard field work, tower co2 profile broken - fixed, tram broken - not fixed, moved co2 probes at Vaira
Tonzi (98) 2014-04-08 06:30:00 Siyan Ma Standard field work, pre-dawn water potential, installed new CO2 soil probes
Tonzi (86) 2014-03-27 00:00:00 Siyan Ma oak leaf-out, grass green, no cows at either site, Checked CO2 probes at Vaira - ok, Removed last of sap flow east station, swapped CO2 profile CO2 tank, zcam 1 down, Moved CO2 probes at Tonzi
Tonzi (77) 2014-03-18 09:30:00 Siyan Ma Oak leaves came out 2 weeks early, CO2 profile CO2 tank empty, Rotated CO2 soil probes, removed one, swapped 7500 at Vaira
Tonzi (63) 2014-03-04 09:30:00 Siyan Ma Leaf out starting, swapped 7500s on Tower and Floor, No met data collected at Vaira due to dead battery
Vaira (41) 2014-02-10 09:00:00 Joe Verfaillie Standard fieldwork, wet and misty, changed Raspberry Pi screen settings.
Tonzi (41) 2014-02-10 09:00:00 Siyan Ma Standard fieldwork, light rain, ground very wet from recent heavy rain.
Vaira (29) 2014-01-29 14:30:00 Joe Verfaillie Reinstalled Vaisala CO2 soil profiles. Raining!
Tonzi (24) 2014-01-24 09:10:00 Siyan Ma Very dry, 50 cows at Tonzi, Tower fence broken - fixed, removed Vaisala CO2 probes for calibration, CO2 profile large offsets and data logger readings do not match licor interface, tram reinstalled, lost empty CF card near tower.
Vaira (7) 2014-01-07 09:00:00 Joe Verfaillie Tested SMS text messaging - not enough signal, standard fieldwork, clipping litter, fixed fence.
Tonzi (7) 2014-01-07 09:00:00 Siyan Ma Standard fieldwork, tested wireless data transfer at Vaira, fixed CO2 profile