Field Notes

Fieldnotes Limited To:
Site = Vaira
Year = 2017
2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024
43 Rows returned:
SiteDateAuthorSummary
Vaira (348) 2017-12-14 10:00:00 Joe Verfaillie Calibrated North soil CO2 profile, grass growing the FD chamber collars - pulled, powered Phenocam continuously and reset clock.
Tonzi (348) 2017-12-14 09:30:00 Siyan Ma Green grass, standard fieldwork
Vaira (340) 2017-12-06 09:30:00 Joe Verfaillie Field trip to Fiddletown, collected/cleared FD chamber data, calibrated East co2 profile, swapped LI-GHG USb stick, fixed 4cm TC on North soil co2 profile
Vaira (333) 2017-11-29 10:00:00 Joe Verfaillie Grass has sprouted, collected FD data, keyboard failing on compute stick, stardot clock set to zero again, swapped 7500 head, collected pond data
Tonzi (333) 2017-11-29 10:00:00 Siyan Ma Standard fieldwork, swapped 7500s, grass has sprouted - clip plots collected.
Vaira (311) 2017-11-07 10:30:00 Joe Verfaillie Standard fieldwork, collected FD data.
Tonzi (311) 2017-11-07 09:00:00 Siyan Ma Standard fieldwork, Joe worked on tower CO2 profile system.
Vaira (298) 2017-10-25 10:30:00 Joe Verfaillie Added third FD chamber, standard fieldwork, collected pond data
Tonzi (298) 2017-10-25 09:00:00 Siyan Ma Standard data collection
Vaira (291) 2017-10-18 10:30:00 Joe Verfaillie Installed FD chambers, added DC converter to Eos GP sensors, cleaned up met data logger wiring.
Vaira (278) 2017-10-05 09:30:00 Joe Verfaillie Standard fieldwork, collected pond data - lower than last year, calibrated Vaisala CO2 probes.
Tonzi (278) 2017-10-05 09:00:00 Siyan Ma Standard fieldwork, Vaisala CO2 probe calibrations
Vaira (264) 2017-09-21 10:30:00 Joe Verfaillie Standard fieldwork, upgraded soil CO2 system adding Eosense probes, measured instrument heights.
Vaira (264) 2017-09-21 09:30:00 Siyan Ma Standard fieldwork, spectrum and litter collections, upgraded soil co2 system, upgraded Tonzi tower met CR1000 OS
Vaira (257) 2017-09-14 14:30:00 Joe Verfaillie Reinstalled Vaisala soil co2 probes in North and East profiles
Vaira (250) 2017-09-07 10:30:00 Daphne Szutu Regular data collection, many brown trees, updated met datalogger program
Vaira (237) 2017-08-25 15:45:00 Daphne Szutu Downloaded Licor GHG and eclipse met data, Removed Vaisala CO2 probes
Vaira (229) 2017-08-17 10:30:00 Daphne Szutu Downloaded met/cam/GHG data, updated LI-7550 software to v8.7.5, swapped 7500 head, re-wired met sensors from CR23x to CR1000
Tonzi (208) 2017-07-27 21:28:00 Siyan Ma Standard data collection, Collected pond data, midday water potential
Tonzi (186) 2017-07-05 10:30:00 Siyan Ma Little bit of rain, changed program on old Tower EC CR1000 for phenocam only, midday water potential, standard data collection
Tonzi (166) 2017-06-15 09:30:00 Siyan Ma Standard fieldwork, hot and dry, no manual soil moisture due to dead battery, midday water potential, last litter collection.
Vaira (166) 2017-06-15 09:00:00 Joe Verfaillie Hot and dry, pond radio not making connection, no manual soil moisture due to low battery.
Vaira (152) 2017-06-01 12:30:00 Joe Verfaillie Reset Licor GHG clock - it was 20 hours behind
Vaira (144) 2017-05-24 10:00:00 Joe Verfaillie standard fieldwork, removed old eddy system
Tonzi (144) 2017-05-24 10:00:00 Siyan Ma Standard fieldwork, removed old eddy equipment, grasses are getting senescent, midday water potential
Tonzi (131) 2017-05-11 09:10:00 Siyan Ma Standard fieldwork, new Ameriflux eddy equipment, midday water potential
Vaira (131) 2017-05-11 09:00:00 Joe Verfaillie Set up radio to pond, installed Ameriflux eddy equipment, standard fieldwork, grass is turning brown
Tonzi (114) 2017-04-24 10:00:00 Siyan Ma Last day of Ameriflux inter-comparison at Vaira, clip plots, grass height, midday water potential, pond.
Vaira (114) 2017-04-24 10:00:00 Joe Verfaillie Ameriflux to take down later today, standard data collection, grass has grown a lot, tested radio link to pond, collected pond data.
Vaira (100) 2017-04-10 10:30:00 Joe Verfaillie Setup up Ameriflux inter-comparison, swapped 7500, added 7500A eddy system.
Tonzi (95) 2017-04-05 10:30:00 Siyan Ma Standard field work, leaves nearly full at Varia, halfway to tow thirds at Tonzi, midday water potential, clip plots, grass height, tower computer removed.
Vaira (95) 2017-04-05 10:30:00 Joe Verfaillie Standard field work, met Jim Vaira, went to the pond.
Tonzi (75) 2017-03-16 09:00:00 Siyan Ma The trees have leaves, standard fieldwork, foggy in the morning, ground water increased.
Vaira (75) 2017-03-16 09:00:00 Joe Verfaillie Foggy early, the trees have leaves, standard fieldwork
Vaira (61) 2017-03-02 13:00:00 Joe Verfaillie Standard field work, went to the pond, met cow rancher
Tonzi (61) 2017-03-02 10:30:00 Siyan Ma Standard field work, clear and sunny, went to the pond
Tonzi (46) 2017-02-15 10:30:00 Siyan Ma Standard field work, everything very wet, clip plots, raised well sensor at Tonzi
Vaira (31) 2017-01-31 10:30:00 Daphne Szutu We arrived around 10:30am. It was clear and mild. There was thick fog as we drove through the Delta, but it cleared up as soon as we reached Galt. Joe downloaded met data. The computer was having trouble sending data, so he turned off the process that se
Tonzi (17) 2017-01-17 11:30:00 Joe Verfaillie very wet, pond much higher, removed bad batteries from Tower battery bank, cut down dead tree near Tower, swapped Floor 7500, resealed z-cam windows.
Tonzi (17) 2017-01-17 10:30:00 Siyan Ma Very wet, fixed Tower power, swapped Floor 7500, Standard field work, cut down dead tree by tower guy wires.
Vaira (17) 2017-01-17 10:30:00 Joe Verfaillie Very wet, standard data collection, computer not sending data for unknown reason, did not go to pond
Tonzi (6) 2017-01-06 09:30:00 Siyan Ma Cold and wet, standard data collection, tower co2 profile not running
Vaira (6) 2017-01-06 09:30:00 Joe Verfaillie Very wet, pond actively overflowing, added USB hub and swapped cable on cell modem.