Field Notes

Fieldnotes Limited To:
Site = Vaira
Year = 2016
2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024
35 Rows returned:
SiteDateAuthorSummary
Vaira (362) 2016-12-27 11:00:00 Joe Verfaillie Restarted the computer, Cell modem not working, disabled auto data send
Tonzi (355) 2016-12-20 09:20:00 Siyan Ma Vaira Pond is full, standard field work, repaired fences at Tonzi, restarted CO2 profile.
Vaira (342) 2016-12-07 11:00:00 Joe Verfaillie Downloaded first set of pressure data from pond, fix software error for sending data, swapped 7500, Stardot date reset.
Tonzi (342) 2016-12-07 10:30:00 Siyan Ma swapped 7500s, collected pond data, Tower co2 profile down due to dead pump.
Vaira (322) 2016-11-17 12:30:00 Joe Verfaillie Installed water pressure sensor at the pond, standard fieldwork.
Tonzi (322) 2016-11-17 10:30:00 Siyan Ma Standard fieldwork, put pressure sensor in Vaira pond, swapped Moisture Point probe near Tower.
Vaira (307) 2016-11-02 09:30:00 Joe Verfaillie Beautiful day, green grass, still some leaves on the trees, removed radiometer inter-comparison set, fixed data transfer, installed staff gauges at the pond.
Tonzi (307) 2016-11-02 09:00:00 Siyan Ma Standard fieldwork, grass is growing, trees still have leaves.
Vaira (294) 2016-10-20 10:00:00 Joe Verfaillie Met Vairas about the pond monitoring, installed compute stick and cell modem, cut grass, set up radiometer test, new grass beginning to sprout.
Tonzi (287) 2016-10-13 09:30:00 Siyan Ma Standard field work, trees turning brown, rain is coming, fixed Floor fence, midday water potential.
Vaira (287) 2016-10-13 09:00:00 Joe Verfaillie Standard fieldwork, tried to install compute stick.
Tonzi (257) 2016-09-13 10:30:00 Siyan Ma Standard data collection, might have been some rain - pocked marker dust and dirty sensors. Floor fence charger not working.
Vaira (257) 2016-09-13 10:30:00 Joe Verfaillie Standard data collection, electric fence was left off on purpose.
Tonzi (236) 2016-08-23 10:00:00 Siyan Ma Standard fieldwork, very dry, swapper all 7500s, manual well meter not working - estimated by wetness, floor fence charger not working, understory HMP fan not working.
Tonzi (210) 2016-07-28 10:00:00 Siyan Ma Standard fieldwork, left electric fence off at Vaira, showing Alison the sites
Tonzi (189) 2016-07-07 09:30:00 Siyan Ma Standard fieldwork, dry grass green trees, still some water in ponds.
Vaira (189) 2016-07-07 09:00:00 Joe Verfaillie Standard fieldwork, dry, hot, area along Twin Cities Rd burned.
Vaira (168) 2016-06-16 10:00:00 Joe Verfaillie Standard fieldwork, checked clocks.
Tonzi (152) 2016-05-31 10:30:00 Siyan Ma Help Karine from UC Davis Susan’s lab to do tree leaf samples
Tonzi (147) 2016-05-26 11:00:00 Siyan Ma Standard fieldwork, grass growing season over, continuing tree survey.
Vaira (147) 2016-05-26 10:00:00 Joe Verfaillie Standard field work, grasses mostly dead.
Tonzi (131) 2016-05-10 10:30:00 Siyan Ma Swapped 7500s, standard field work, started tree survey, midday water potential, grasses seeding
Tonzi (111) 2016-04-20 10:30:00 Siyan Ma Standard fieldwork and data collection, Ameriflux inter-comparison running, midday water potential
Vaira (96) 2016-04-05 10:30:00 Joe Verfaillie Replaced Peltier SHF plate one, replace BF3 desiccant
Tonzi (96) 2016-04-05 10:00:00 Siyan Ma Nice day, standard fieldwork, no photos from Tower.
Tonzi (83) 2016-03-23 09:00:00 Siyan Ma Beautiful day, Standard field work
Vaira (83) 2016-03-23 09:00:00 Joe Verfaillie Fixed Phenocam cable, condensation in BF3, removed Peltier SHF 1 due to broken wire.
Vaira (68) 2016-03-08 08:30:00 Joe Verfaillie Phenocam is not working for some reason.
Tonzi (63) 2016-03-03 10:20:00 Siyan Ma Standard field work. The trees have leaves!
Vaira (54) 2016-02-23 09:30:00 Joe Verfaillie Swapped 7500, reinstalled Vaisala CO2 probes, photos from UC equipment inventory. Nice day.
Tonzi (54) 2016-02-23 09:30:00 Siyan Ma Standard fieldwork, reinstalled Vaisala CO2 probes, swapped 7500s, grass height, clip plots.
Vaira (35) 2016-02-04 11:45:00 Joe Verfaillie Nice day, Peltier SHF 1 not reading, removed Vaisala CO2 probes.
Vaira (20) 2016-01-20 13:00:00 Joe Verfaillie Checked on soil CO2 system, main solar batteries and fixed cow fence.
Tonzi (20) 2016-01-20 10:00:00 Siyan Ma Standard field work, things wet after several days of rain, tram brought in - dead battery, Floor power improved.
Tonzi (8) 2016-01-08 09:20:00 Siyan Ma Standard data collection, Two probes from Vaira East location brought in one wire chewed. Tonzi tower co2 profile system still down.