Tonzi (362) 2016-12-27 11:30:00 Joe Verfaillie Disconnected CO2 profile system due night time power loss.
Tonzi (355) 2016-12-20 09:20:00 Siyan Ma Vaira Pond is full, standard field work, repaired fences at Tonzi, restarted CO2 profile.
Tonzi (342) 2016-12-07 12:00:00 Joe Verfaillie Standard field work, cold and gray, swapped 7500s, co2 profile system turned off due to dead pump, fixed IP address for camera images.
Tonzi (342) 2016-12-07 10:30:00 Siyan Ma swapped 7500s, collected pond data, Tower co2 profile down due to dead pump.
Tonzi (322) 2016-11-17 11:00:00 Joe Verfaillie Standard fieldwork, cleaned and calibrated LI-820, serviced zcams, fixed Tower fence battery.
Tonzi (322) 2016-11-17 10:30:00 Siyan Ma Standard fieldwork, put pressure sensor in Vaira pond, swapped Moisture Point probe near Tower.
Tonzi (307) 2016-11-02 12:00:00 Joe Verfaillie Beautiful day, green grass, fixed co2 profile system, installed HMP60 at tower top.
Tonzi (307) 2016-11-02 09:00:00 Siyan Ma Standard fieldwork, grass is growing, trees still have leaves.
Tonzi (294) 2016-10-20 12:00:00 Joe Verfaillie Cleaned zcam windows checked on Tower HMP45s, spider webs on Tower eddy sensors.
Tonzi (287) 2016-10-13 10:30:00 Joe Verfaillie Standard field work, fixed Floor fence, removed equipment from sap flow stations, reset CR200 clock, water potential
Tonzi (287) 2016-10-13 09:30:00 Siyan Ma Standard field work, trees turning brown, rain is coming, fixed Floor fence, midday water potential.
Tonzi (257) 2016-09-13 11:15:00 Joe Verfaillie fixed/improve daily data transfer, removed Eosence profile experiment, swapped CO2 tank, Phenocam Ethernet loose connection
Tonzi (257) 2016-09-13 10:30:00 Siyan Ma Standard data collection, might have been some rain - pocked marker dust and dirty sensors. Floor fence charger not working.
Tonzi (236) 2016-08-23 10:00:00 Siyan Ma Standard fieldwork, very dry, swapper all 7500s, manual well meter not working - estimated by wetness, floor fence charger not working, understory HMP fan not working.
Tonzi (210) 2016-07-28 10:00:00 Siyan Ma Standard fieldwork, left electric fence off at Vaira, showing Alison the sites
Tonzi (197) 2016-07-15 09:30:00 Joe Verfaillie Replaced motor in rotating shadow band, collected Eosense CO2 probe data.
Tonzi (189) 2016-07-07 10:00:00 Joe Verfaillie Connected soilco2 and fmet to tower computer, found line quantum sensor, rotating shadow band stopped, sonic heading, removed wind profile boom.
Tonzi (189) 2016-07-07 09:30:00 Siyan Ma Standard fieldwork, dry grass green trees, still some water in ponds.
Tonzi (168) 2016-06-16 10:45:00 Joe Verfaillie Added batteries to Floor, added Eosense probes to Tower, fixed automatic sftp, more tree survey.
Tonzi (152) 2016-05-31 10:30:00 Siyan Ma Help Karine from UC Davis Susan’s lab to do tree leaf samples
Tonzi (147) 2016-05-26 11:00:00 Joe Verfaillie Worked on auto upload code, restarted co2 profile, serviced zcams, Floor solar battery exploded, tree survey continued.
Tonzi (147) 2016-05-26 11:00:00 Siyan Ma Standard fieldwork, grass growing season over, continuing tree survey.
Tonzi (131) 2016-05-10 10:30:00 Joe Verfaillie Swapped 7500s, Tried to restart co2 profile, Cleaned up Tower computer box, new serial multiport, added towermet tz6 to daily data
Tonzi (131) 2016-05-10 10:30:00 Siyan Ma Swapped 7500s, standard field work, started tree survey, midday water potential, grasses seeding
Tonzi (116) 2016-04-25 10:30:00 Joe Verfaillie Take down of Ameriflux inter-comparison, added tz3 soil moisture to daily data.
Tonzi (111) 2016-04-20 10:30:00 Siyan Ma Standard fieldwork and data collection, Ameriflux inter-comparison running, midday water potential
Tonzi (103) 2016-04-12 09:00:00 Joe Verfaillie Super Ameriflux inter-comparison with CO2 profile, new rope, cell modem working, serviced zcams.
Tonzi (96) 2016-04-05 11:30:00 Joe Verfaillie ATT modem not working - removed, moved shadow band diffuse PAR, reinstalled CO2 profile pump - system still not running, reinstalled relay for Open soil CO2 profile.
Tonzi (96) 2016-04-05 10:00:00 Siyan Ma Nice day, standard fieldwork, no photos from Tower.
Tonzi (83) 2016-03-23 10:00:00 Joe Verfaillie Swapped tower computer and added modem, removed tower rope, removed soil CO2 relay at Open profile.
Tonzi (83) 2016-03-23 09:00:00 Siyan Ma Beautiful day, Standard field work
Tonzi (68) 2016-03-08 09:30:00 Joe Verfaillie Tower power out - fixed, tram track down, Tower 7500 unpowered - plugged in.
Tonzi (63) 2016-03-03 10:20:00 Siyan Ma Standard field work. The trees have leaves!
Tonzi (54) 2016-02-23 11:00:00 Joe Verfaillie Swapped both 7500s, reinstalled li-820 but removed pump, Tower computer hung, reinstalled Vaisala CO2 probes, photos for UC equipment inventory.
Tonzi (54) 2016-02-23 09:30:00 Siyan Ma Standard fieldwork, reinstalled Vaisala CO2 probes, swapped 7500s, grass height, clip plots.
Tonzi (35) 2016-02-04 12:30:00 Joe Verfaillie Collected data as best we could without Siyan, had problems with well depth meter, removed Vaisala soil CO2 probes for calibration.
Tonzi (20) 2016-01-20 10:00:00 Siyan Ma Standard field work, things wet after several days of rain, tram brought in - dead battery, Floor power improved.
Tonzi (20) 2016-01-20 10:00:00 Joe Verfaillie Wet, but pond only half full, improved Floor power, service z-cams, brought in tram - dead battery, fixed cow fences, fixed loose stuff at tower top.
Tonzi (8) 2016-01-08 09:20:00 Siyan Ma Standard data collection, Two probes from Vaira East location brought in one wire chewed. Tonzi tower co2 profile system still down.