Site | Date | Author | Summary |
Tonzi |
(357) 2014-12-23 09:00:00 |
Siyan Ma |
Ponds are full, swapped 7500s at Tonzi, Brought in LI-820, Tower sonic hung up again.
|
Tonzi |
(343) 2014-12-09 11:00:00 |
Joe Verfaillie |
Tower sonic stopped - fixed, co2 profile bad solenoid, dirty path - partially fixed, Tree 2 Soil CO2 fixed, tram derailed - fixed
|
Tonzi |
(343) 2014-12-09 09:00:00 |
Siyan Ma |
Standard field work, clip plots, grass height, power outages do to low sunlight at Tonzi, CO2 profile not working
|
Tonzi |
(330) 2014-11-26 09:40:00 |
Siyan Ma |
Grass germinated, still oak leaves at Vaira, fixed Tonzi tower fence, no 7500 analog data at Floor - digital okay, standard field work.
|
Tonzi |
(317) 2014-11-13 09:30:00 |
Siyan Ma |
Standard fieldwork, rain last night and a little this morning, Tower fence broken, did not collect z-cam images
|
Tonzi |
(297) 2014-10-24 10:30:00 |
Siyan Ma |
Standard fieldwork, all went well, Tower fence broken - fixed
|
Tonzi |
(280) 2014-10-07 11:00:00 |
Joe Verfaillie |
Maintained fences, fixed CO2 profile system.
|
Tonzi |
(275) 2014-10-02 12:00:00 |
Joe Verfaillie |
Mr. Tonzi died today.
|
Tonzi |
(273) 2014-09-30 09:30:00 |
Siyan Ma |
A little rain last week, trees turning brown - not so much at Vaira, Cows broke fences at Tonzi, begin new fence at Vaira, CO2 profile needs fixing, swapped Floor 7500.
|
Tonzi |
(254) 2014-09-11 11:00:00 |
Joe Verfaillie |
PRI sensors operational, reinstalled LI-820 but still some plumbing problem, Tower fence down - repaired, missing Tram data, swapped tower 7500.
|
Tonzi |
(254) 2014-09-11 09:20:00 |
Siyan Ma |
Standard fieldwork, Joe fixed fence at Vaira, reinstalled CO2 profile system, trees starting to turn color, midday water potential
|
Tonzi |
(233) 2014-08-21 10:30:00 |
Joe Verfaillie |
Tried to install Decagon PRI sensors, tried to fix the CO2 profile system, set up daily split on the tower computer.
|
Tonzi |
(233) 2014-08-21 09:00:00 |
Siyan Ma |
Standard field work, co2 profile system down - IGRA brought it, midday water potential, litter biomass.
|
Tonzi |
(217) 2014-08-05 09:40:00 |
Siyan Ma |
Trees started to change color, did not span co2 profile, tram and co2 profile files need daily split set up.
|
Tonzi |
(190) 2014-07-09 04:50:00 |
Siyan Ma |
Predawn water potential, new tank for midday potential, standard field work, Joe replaced tower computer.
|
Tonzi |
(183) 2014-07-02 12:00:00 |
Joe Verfaillie |
Swapped CO2 profile N2 tank, tower computer has crashed with bad disk
|
Tonzi |
(176) 2014-06-25 04:40:00 |
Siyan Ma |
Predawn water potential, reset dendrometers, fixed co2 profile system, fixed tram
|
Tonzi |
(176) 2014-06-25 04:30:00 |
Joe Verfaillie |
Predawn water potential, fixed CO2 profile calibration solenoids and dirty cell, fixed Tram bad wheel, mapped trees, checked tower sonic settings
|
Tonzi |
(162) 2014-06-11 05:00:00 |
Siyan Ma |
Predawn water potential, CO2 profile system down - needs cleaning, Swapped 7500 at Floor and Tower
|
Tonzi |
(142) 2014-05-22 05:30:00 |
Joe Verfaillie |
Predawn water potential, cleaned co2 profile cell, tram brought in for repair, z-cams serviced, no Tower phenocam images, Floor HMP45 fan replaced.
|
Tonzi |
(128) 2014-05-08 05:50:00 |
Siyan Ma |
Predawn water potential, reinstalled tram, Trouble connecting to data loggers at Vaira, no moisture point data, standard fieldwork.
|
Tonzi |
(112) 2014-04-22 05:45:00 |
Joe Verfaillie |
Predawn water potential, fix z-cam 1 wire, fixed CO2 profile, did not fix tram and floor hmp45 fan, condensation in diffuse sensor.
|
Tonzi |
(112) 2014-04-22 05:45:00 |
Siyan Ma |
Predawn water potential, standard field work, tower co2 profile broken - fixed, tram broken - not fixed, moved co2 probes at Vaira
|
Tonzi |
(98) 2014-04-08 06:30:00 |
Siyan Ma |
Standard field work, pre-dawn water potential, installed new CO2 soil probes
|
Tonzi |
(86) 2014-03-27 00:00:00 |
Siyan Ma |
oak leaf-out, grass green, no cows at either site, Checked CO2 probes at Vaira - ok, Removed last of sap flow east station, swapped CO2 profile CO2 tank, zcam 1 down, Moved CO2 probes at Tonzi
|
Tonzi |
(77) 2014-03-18 09:30:00 |
Siyan Ma |
Oak leaves came out 2 weeks early, CO2 profile CO2 tank empty, Rotated CO2 soil probes, removed one, swapped 7500 at Vaira
|
Tonzi |
(63) 2014-03-04 09:30:00 |
Siyan Ma |
Leaf out starting, swapped 7500s on Tower and Floor, No met data collected at Vaira due to dead battery
|
Tonzi |
(41) 2014-02-10 10:00:00 |
Joe Verfaillie |
Standard field work, ground is very wet, swapped CO2 profile inlet filters.
|
Tonzi |
(41) 2014-02-10 09:00:00 |
Siyan Ma |
Standard fieldwork, light rain, ground very wet from recent heavy rain.
|
Tonzi |
(29) 2014-01-29 13:00:00 |
Joe Verfaillie |
HUNGRY cows, reinstalled Vaisala CO2 soil profile, reinstall HMP45 in RH/Temp profile, removed folding arm, fix multiple breaks in tower fence.
|
Tonzi |
(24) 2014-01-24 09:10:00 |
Siyan Ma |
Very dry, 50 cows at Tonzi, Tower fence broken - fixed, removed Vaisala CO2 probes for calibration, CO2 profile large offsets and data logger readings do not match licor interface, tram reinstalled, lost empty CF card near tower.
|
Tonzi |
(7) 2014-01-07 10:45:00 |
Joe Verfaillie |
Tram not running - dead battery, CO2 profile pump not working - fixed, RH/temp profile problems - removed on HMP45, replaced LED filter, fixed z-cam cards.
|
Tonzi |
(7) 2014-01-07 09:00:00 |
Siyan Ma |
Standard fieldwork, tested wireless data transfer at Vaira, fixed CO2 profile
|