Site | Date | Author | Summary |
Tonzi |
(351) 2013-12-17 10:00:00 |
Siyan Ma |
Annual grasses germinated under litters. Oak leaves fell. I met Mr. Tonzi, Tried to reinstall tower profile pump, LED filter lost.
|
Tonzi |
(331) 2013-11-27 10:30:00 |
Siyan Ma |
Forbs have germinated few grasses, swapped 7500 at Vaira, tram reset, co2 profile pump not running - removed.
|
Vaira |
(311) 2013-11-07 09:00:00 |
Joe Verfaillie |
Standard fieldwork, no problems
|
Tonzi |
(311) 2013-11-07 09:00:00 |
Siyan Ma |
No rain yet! 90% of oak leaves turned into yellow or brown at Tonzi; cows and cars disturbed area at Vaira, swapped 7500s at Tonzi
|
Vaira |
(291) 2013-10-18 09:00:00 |
Joe Verfaillie |
Cow fence fixed - not as bad as reported, tested tipping bucket, leveled radiometers, standard fieldwork, tree still have leaves.
|
Tonzi |
(291) 2013-10-18 09:00:00 |
Siyan Ma |
Standard fieldwork, Joe tested tipping buckets and leveled radiometers, Tram came in for repair, partial Moisture point due to dead battery.
|
Vaira |
(268) 2013-09-25 10:30:00 |
Joe Verfaillie |
Standard fieldwork, reorganize PSU / CR1000 box, very dry even with a little rain last weekend.
|
Tonzi |
(268) 2013-09-25 10:30:00 |
Siyan Ma |
Standard fieldwork, offset in CO2 profile system, LED sensor at Tonzi broken - removed, little rain last weekend, but stiff very dry.
|
Tonzi |
(247) 2013-09-04 10:50:00 |
Siyan Ma |
Standard fieldwork, things look very dry
|
Tonzi |
(225) 2013-08-13 09:15:00 |
Siyan Ma |
Standard field work, swapped Vaira 7500, fixed minor problems with VR HMP45 solar shield and LI820, midday water potential
|
Vaira |
(225) 2013-08-13 09:15:00 |
Joe Verfaillie |
Collected data, changed CR1000 program to allocate memory better, swapped 7500, fixed HMP45 solar shield.
|
Tonzi |
(209) 2013-07-28 10:30:00 |
Siyan Ma |
Standard field work, swapped IRGAs at Tower and Floor, did not collect data at VR other than CR1000, replaced co2 profile pump, replaced HMP45 fan at VR
|
Vaira |
(192) 2013-07-11 09:30:00 |
Joe Verfaillie |
Standard fieldwork, collected data, remounted Raspberry Pi
|
Tonzi |
(192) 2013-07-11 09:10:00 |
Siyan Ma |
Standard fieldwork, midday water potential, CO2 profile pump down, HMP45 fan down at VR, Floor CR100 data not recorded - winflux okay
|
Vaira |
(170) 2013-06-19 13:15:00 |
Joe Verfaillie |
Standard fieldwork, collected data, no problems
|
Tonzi |
(170) 2013-06-19 09:00:00 |
Siyan Ma |
Standard fieldwork, midday water potential, moved tram.
|
Vaira |
(150) 2013-05-30 09:00:00 |
Joe Verfaillie |
No Phenocam images recorded due to bad settings, updated Raspberry Pi, standard fieldwork
|
Tonzi |
(150) 2013-05-30 09:00:00 |
Siyan Ma |
Standard field work, midday water potential, no Floor CR100 data, MD9 network okay, wind profile system removed.
|
Vaira |
(135) 2013-05-15 10:00:00 |
Joe Verfaillie |
Swapped CR1000 with Raspberry Pi to collect phenocam photos.
|
Tonzi |
(128) 2013-05-08 10:30:00 |
Siyan Ma |
Standard field work, broke USB drive with Vaira data on it, CO2 profile IRGA railed - brought in, checked settings on Tonzi Tower diffuse PAR, MD9 sporadic.
|
Vaira |
(114) 2013-04-24 13:00:00 |
Joe Verfaillie |
Swapped 7500, split loomed radiation cables, standard fieldwork
|
Tonzi |
(114) 2013-04-24 09:30:00 |
Siyan Ma |
Swapped both co2 profile tanks, tram ok, RH/T profile ok, swapped 7500 at Vaira, standard field work, grass turning yellow
|
Vaira |
(100) 2013-04-10 09:00:00 |
Joe Verfaillie |
Things look moist, green and growing, changed CR1000 program, standard field work
|
Tonzi |
(100) 2013-04-10 09:00:00 |
Siyan Ma |
Standard fieldwork, Extra grass samples at Vaira
|
Vaira |
(86) 2013-03-27 14:30:00 |
Joe Verfaillie |
Standard field work, leaf out.
|
Tonzi |
(86) 2013-03-27 10:30:00 |
Siyan Ma |
Tram moved, standard fieldwork, LI800 far off scale, collected soil diffusion samples.
|
Vaira |
(72) 2013-03-13 09:00:00 |
Joe Verfaillie |
Standard field work, things look dry for this time of year, no leaves yet.
|
Tonzi |
(72) 2013-03-13 09:00:00 |
Siyan Ma |
Standard field work.
|
Tonzi |
(58) 2013-02-27 10:30:00 |
Siyan Ma |
Standard field work, collected all data - missed soil CO2 at Vaira, Collected soil samples for diffusion, Li800 pretty far off cal. Swapped 7500 at Vaira
|
Vaira |
(37) 2013-02-06 12:30:00 |
Joe Verfaillie |
CR1000 for stardot images worked, Collected data, new program for met 23x for new peltier chip shf sensors.
|
Tonzi |
(37) 2013-02-06 09:30:00 |
Siyan Ma |
Standard field work, swapped Tower and Floor 7500s, CO2 profile railed - fixed, installed new peltier SHF at Vaira
|
Vaira |
(24) 2013-01-24 09:15:00 |
Joe Verfaillie |
Cleaned Phenocam, added CR1000 to collect Phenocam images.
|
Vaira |
(16) 2013-01-16 09:15:00 |
Joe Verfaillie |
Computer dead - removed, data okay on data loggers, AM16/32 okay - did not swap.
|
Tonzi |
(16) 2013-01-16 09:00:00 |
Siyan Ma |
Standard field work, collected soil samples,Vaira PC dead, CO2 profile system fixed, tram reset.
|
Tonzi |
(1) 2013-01-01 11:30:00 |
Siyan Ma |
Floor and Tower fences down, CO2 profile system not working, tram was derailed - reset at charging station, soil co2 partially working
|