Site | Date | Author | Summary |
Twitchell Rice |
(362) 2011-12-28 11:30:00 |
Joe Verfaillie |
Collect data and check tower
|
Twitchell Rice |
(352) 2011-12-18 09:00:00 |
Joe Verfaillie |
Calibrated LGR, cleaned pyranometer, cold and foggy.
|
Twitchell Rice |
(348) 2011-12-14 09:00:00 |
Joe Verfaillie |
Pressure was low on LGR, collected data.
|
Twitchell Rice |
(335) 2011-12-01 08:30:00 |
Joe Verfaillie |
Quick check on power.
|
Twitchell Rice |
(326) 2011-11-22 09:30:00 |
Joe Verfaillie |
Power down due to GFI, LGR calibration.
|
Twitchell Rice |
(320) 2011-11-16 08:00:00 |
Joe Verfaillie |
Installed new autocam, replaced weather stripping, added braces to doors, power down due to popped GFI on generator.
|
Twitchell Rice |
(312) 2011-11-08 09:15:00 |
Joe Verfaillie |
LGR filter blocked and cleared of condensation, Beginning to flood field.
|
Twitchell Rice |
(306) 2011-11-02 07:00:00 |
Joe Verfaillie |
Field chopped, reinstalled soil sensors, AC power line cut, radiation boom over field.
|
Twitchell Rice |
(300) 2011-10-27 08:15:00 |
Joe Verfaillie |
Swapped LGR, brought in SHF plates, tipping bucket for repair.
|
Twitchell Rice |
(293) 2011-10-20 08:30:00 |
Jaclyn Hatala |
rice is harvested
|
Twitchell Rice |
(286) 2011-10-13 07:30:00 |
Joe Verfaillie |
Removed ground sensors and turned radiation boom from the field for Harvest.
|
Twitchell Rice |
(277) 2011-10-04 09:00:00 |
Jaclyn Hatala |
everything OK, rice drying out to brown
|
Twitchell Rice |
(272) 2011-09-29 07:20:00 |
Joe Verfaillie |
Insulated LGR tubing, LGR plugged in low flow, cut grass, reset one theta probe.
|
Twitchell Rice |
(265) 2011-09-22 07:30:00 |
Joe Verfaillie |
LGR locked up, tube broken and fixed, DO sensor brought in.
|
Twitchell Rice |
(258) 2011-09-15 07:00:00 |
Joe Verfaillie |
Tubing for LGR broke and repaired, LGR cal checked, data collected, Theta probes back in field, connected tomorrow.
|
Twitchell Rice |
(245) 2011-09-02 08:30:00 |
Joe Verfaillie |
Water was turned off last Tuesday, quick check and LAI etc, Cristina installed water flow sensor.
|
Twitchell Rice |
(237) 2011-08-25 13:00:00 |
Joe Verfaillie |
Swapped LI7500, rice is heading, cleaned solar panels.
|
Twitchell Rice |
(226) 2011-08-14 09:59:00 |
Dennis Baldocchi |
visited Twitchell
|
Twitchell Rice |
(224) 2011-08-12 08:30:00 |
Joe Verfaillie |
Swapped internal 2um filter in the LGR, calibrated the LGR, replaced the 40um strainer.
|
Twitchell Rice |
(216) 2011-08-04 09:30:00 |
Jaclyn Hatala |
Reinstalled DO sensor, canopy measurements
|
Twitchell Rice |
(209) 2011-07-28 09:00:00 |
Joe Verfaillie |
Still no screen for LGR, cut DO with cutting grass, tested three new LED sensors.
|
Twitchell Rice |
(202) 2011-07-21 13:30:00 |
Joe Verfaillie |
LGR screen died,changed pyranometer desiccant.
|
Twitchell Rice |
(195) 2011-07-14 09:30:00 |
Jaclyn Hatala |
Reinstalled well pressure transducer, reconnected atm pressure sensor, normal round of canopy measurements
|
Twitchell Rice |
(188) 2011-07-07 09:15:00 |
Joe Verfaillie |
Herbicide sprayed yesterday, discovered chew cables on water pressure and Theta probe, problems with CR1000 and LI7500, misplaced CF card.
|
Twitchell Rice |
(182) 2011-07-01 11:00:00 |
Joe Verfaillie |
Replaced sonic with RS422/232 converter. Troubleshot power short in theta probe.
|
Twitchell Rice |
(181) 2011-06-30 09:00:00 |
Joe Verfaillie |
New air conditioner installed. Sonic found not reporting and removed for lab check. UC Davis in field.
|
Twitchell Rice |
(172) 2011-06-21 09:15:00 |
Joe Verfaillie |
Standard fieldwork, cut grass, field flooded since June 16th, met Michael Marshall.
|
Twitchell Rice |
(161) 2011-06-10 10:30:00 |
Joe Verfaillie |
Fluxnet fieldtrip. Swapped LGR.
|
Twitchell Rice |
(153) 2011-06-02 12:45:00 |
Jaclyn Hatala |
Replaced DO sensor fluid and cleaned membrane, took LAI-2000, clip plots, and spectral reflectance measurements.
|
Twitchell Rice |
(145) 2011-05-25 12:00:00 |
Joe Verfaillie |
Swapped LI7500, replaced HMP45 fan, trouble with CR1000 card swap, field drained, showers, box lock WD40'd.
|
Twitchell Rice |
(136) 2011-05-16 18:03:00 |
Dennis Baldocchi |
Notes from Frank..
|
Twitchell Rice |
(133) 2011-05-13 08:30:00 |
Joe Verfaillie |
Field beginning to flood, fixed soil heat flux plate #2, Calibrated LGR.
|
Twitchell Rice |
(128) 2011-05-08 21:35:00 |
Dennis Baldocchi |
rice up, everything working
|
Twitchell Rice |
(116) 2011-04-26 09:00:00 |
Joe Verfaillie |
Reinstall ground sensors, Moved tower and box closer to the field by about 1m.
|
Twitchell Rice |
(112) 2011-04-22 09:30:00 |
Joe Verfaillie |
Field will be planted today. Tower okay.
|
Twitchell Rice |
(103) 2011-04-13 09:45:00 |
Joe Verfaillie |
Soil sensors pulled on Monday, field disked and plowed, radiation boom rotated to south.
|
Twitchell Rice |
(81) 2011-03-22 09:30:00 |
Joe Verfaillie |
Calibrated LGR, started computer, tipping bucket lost funnel and pyramnometer lost shield in wind - replaced, DO pulled from field.
|
Twitchell Rice |
(60) 2011-03-01 09:30:00 |
Joe Verfaillie |
LGR hung on reboot - restarted, still no keyboard/mouse, collected data.
|
Twitchell Rice |
(39) 2011-02-08 11:30:00 |
Joe Verfaillie |
New generator, Keyboard/mouse still don't work, radiation boom rotated, field water draining, DO dry - reposisitoned.
|
Twitchell Rice |
(28) 2011-01-28 09:30:00 |
Joe Verfaillie |
Installed DO, Plantcam, Line conditioner. Generator and LGR up and running.
|
Twitchell Rice |
(18) 2011-01-18 12:30:00 |
Joe Verfaillie |
Swapped HMP45, Swapped LGR, Removed air conditioning, Installed fans, Mouse dead?, generator quit.
|
Twitchell Rice |
(5) 2011-01-05 13:55:00 |
Dennis Baldocchi |
Methane not operating, had Bruce Start generator, Tair is dead
|