Field Notes

Fieldnotes Limited To:
Site = Tonzi
Year = 2010
2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 | 2024
34 Rows returned:
SiteDateAuthorSummary
Tonzi (364) 2010-12-30 08:00:00 Siyan Ma Floor site computer died
Tonzi (343) 2010-12-09 09:00:00 Joe Verfaillie tower, floor power out, tram out - fixed, data copied, z-cam cards swapped, IRTs brough in, Floor computer clock reset.
Tonzi (316) 2010-11-12 10:00:00 Siyan Ma regular check; new soil moisture probes installed at Vaira
Tonzi (316) 2010-11-12 10:00:00 Siyan Ma regular check; new soil moisture probes installed at Vaira
Tonzi (316) 2010-11-12 09:40:00 Joe Verfaillie Reset time on z-cams, new CO2 profile pump.
Tonzi (301) 2010-10-28 10:00:00 Siyan Ma Swapped CO2 profile pump,collected Jaclyn's grass samples, swapped z-cam cards, grass sprouting.
Tonzi (280) 2010-10-07 11:30:00 Joe Verfaillie Show Sonia the towers, regular maintenance, fixed chewed z-cam 1 wire.
Tonzi (280) 2010-10-07 10:00:00 Siyan Ma Show Sonia the towers, swap LI7500s, standard field work.
Tonzi (253) 2010-09-10 12:00:00 Hideki Kobayashi Extensive LAI, canopy, and radiation measurements.
Tonzi (245) 2010-09-02 05:27:00 Siyan Ma Predawn water potential, standard field work, collected left and needle samples.
Tonzi (245) 2010-09-02 05:20:00 Joe Verfaillie predawn water potential, fix west and east sap flow stations, moved tipping bucket.
Tonzi (241) 2010-08-29 11:39:00 Jaclyn Hatala Field trip to Tonzi Ranch, Saturday 8/28/2010
Tonzi (231) 2010-08-19 10:30:00 Joe Verfaillie Tonzi 8/19/2010 I arrived about 10:30 PDT from Vaira. It was clear, sunny, and hot with very little wind at first but increasing towards midday. My first task was to fix the tram charging station. I put a fresh SLA battery inside the tram and fixed th
Tonzi (226) 2010-08-14 05:10:00 Siyan Ma html
When: Date: 8/14/2010 , Day: 226 , Watch Time: 5:10am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather: Sunny
Phenology: ye
Tonzi (217) 2010-08-05 09:30:00 Joe Verfaillie Tonzi 2010/8/5 Returned to Tonzi about 9:30PDT where Jaclyn was busy taking soil cores. The weather is clear, warm, and sunny with a little breeze. Talked to Mr. Tonzi about nothing of consequence. The trees still look happy and there is still some
Tonzi (197) 2010-07-16 09:00:00 Joe Verfaillie Jaclyn doing photo degradation, checked sap flow stations, cleaned tower battery terminals, removed surface renewal equipment
Tonzi (175) 2010-06-24 05:00:00 Joe Verfaillie Tonzi 6/24/2010 Arrived about 5am with Siyan for pre-dawn water potential. Not too cold and no wind before dawn. Warming to pleasant temperatures at midday, a few clouds but mostly sunny. The wind was light but increasing. The oaks look strong and
Tonzi (175) 2010-06-24 05:00:00 Siyan Ma
When: Date: 6/24/2010 , Day: 175 , Watch Time: 5:00 am .
Where: Tonzi/Vaira Ranch
Who: Siyan, Joe
Weather: n
Tonzi (161) 2010-06-10 10:00:00 Siyan Ma
When: Date: 6/10/2010 , Day: 161 , Watch Time: 10:00 .
Where: Tonzi/Vaira Ranch
Who: Siyan, De
Tonzi (148) 2010-05-28 05:10:00 Siyan Ma
When: Date: 5/28/2010 , Day: 148 , Watch Time: 5:10 am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather: partia
Tonzi (133) 2010-05-13 11:00:00 Siyan Ma
When: Date: 5/13/2010 , Day: 133 , Watch Time: 11:00 .
Where: Tonzi/Vaira Ranch
Who: Siyan, Jo
Tonzi (133) 2010-05-13 10:00:00 Joe Verfaillie Anders Ameriflux inter-comparison, LI7500 swap, IRT sensors cow chewed, two new N2 tanks.
Tonzi (120) 2010-04-30 06:10:00 Siyan Ma Tall grass at Vaira, A-Ci curves for oak and pine, leaf water potential, standard field work
Tonzi (103) 2010-04-13 10:00:00 Joe Verfaillie Tonzi 4/13/2010 Arrived about 10am. Tonzi's pound is still full, ground is very wet like recent storm dropped a lot of rain. I fixed the under-story HMP45 solar shield, removing home made on and installing 12 plate gill with ventilation. Replac
Tonzi/Vaira (92) 2010-04-02 06:00:00 Siyan Ma html
When: Date: 4/2/2010 , Day: 92 , Watch Time: 6:00 am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather: cloudy, slight wind, a lot of dews, started
Tonzi (80) 2010-03-21 11:30:00 Siyan Ma
Tonzi (75) 2010-03-16 09:00:00 Joe Verfaillie Tonzi pond nearly full, Installed a KZ NR-Lite and two PAR sensors, Tower tipping rain bucket needs cleaning.
Tonzi (64) 2010-03-05 09:50:00 Siyan Ma
When: Date: 3/5/2010 , Day: 63 , Watch Time: 9:50 am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather: partially
Tonzi (56) 2010-02-25 09:00:00 Joe Verfaillie Took detour to ranch, Tram not running, Several equipment in disrepair, Removed Vaisala CO2 probes, Little scorpions in bottom of the storage box.
Tonzi (41) 2010-02-10 11:00:00 Joe Verfaillie Installed Tram with 24VDC chargin station, left CO2 profile off, brought in old sap flow equipment.
Tonzi (41) 2010-02-10 10:00:00 Siyan Ma
When: Date: 2/10/2010 , Day: 41 , Watch Time: 10:00 .
Where: Tonzi/Vaira Ranch
Who: Siyan, DDB,
Tonzi (27) 2010-01-27 11:30:00 Joe Verfaillie Evidence of strong winds, consolidated soil co2 solar system, power out at Tower and soil co2
Tonzi (8) 2010-01-08 11:00:00 Joe Verfaillie Power outages at Floor and Tower, swapped soil co2 batteries, Floor computer not booting - had to use auxiliary battery.
Tonzi (8) 2010-01-08 09:50:00 Siyan Ma
When: Date: 1/8/2010 , Day: 8 , Watch Time: 9:50 .
Where: Tonzi/Vaira Ranch
Who: Siyan Joe Naa