Site | Date | Author | Summary |
Tonzi |
(364) 2010-12-30 08:00:00 |
Siyan Ma |
Floor site computer died
|
Tonzi |
(343) 2010-12-09 09:00:00 |
Joe Verfaillie |
tower, floor power out, tram out - fixed, data copied, z-cam cards swapped, IRTs brough in, Floor computer clock reset.
|
Tonzi |
(316) 2010-11-12 10:00:00 |
Siyan Ma |
regular check; new soil moisture probes installed at Vaira
|
Tonzi |
(316) 2010-11-12 10:00:00 |
Siyan Ma |
regular check; new soil moisture probes installed at Vaira
|
Tonzi |
(316) 2010-11-12 09:40:00 |
Joe Verfaillie |
Reset time on z-cams, new CO2 profile pump.
|
Tonzi |
(301) 2010-10-28 10:00:00 |
Siyan Ma |
Swapped CO2 profile pump,collected Jaclyn's grass samples, swapped z-cam cards, grass sprouting.
|
Tonzi |
(280) 2010-10-07 11:30:00 |
Joe Verfaillie |
Show Sonia the towers, regular maintenance, fixed chewed z-cam 1 wire.
|
Tonzi |
(280) 2010-10-07 10:00:00 |
Siyan Ma |
Show Sonia the towers, swap LI7500s, standard field work.
|
Tonzi |
(253) 2010-09-10 12:00:00 |
Hideki Kobayashi |
Extensive LAI, canopy, and radiation measurements.
|
Tonzi |
(245) 2010-09-02 05:27:00 |
Siyan Ma |
Predawn water potential, standard field work, collected left and needle samples.
|
Tonzi |
(245) 2010-09-02 05:20:00 |
Joe Verfaillie |
predawn water potential, fix west and east sap flow stations, moved tipping bucket.
|
Tonzi |
(241) 2010-08-29 11:39:00 |
Jaclyn Hatala |
Field trip to Tonzi Ranch, Saturday 8/28/2010
|
Tonzi |
(231) 2010-08-19 10:30:00 |
Joe Verfaillie |
Tonzi
8/19/2010
I arrived about 10:30 PDT from Vaira. It was clear, sunny, and hot with very little wind at first but increasing towards midday.
My first task was to fix the tram charging station. I put a fresh SLA battery inside the tram and fixed th
|
Tonzi |
(226) 2010-08-14 05:10:00 |
Siyan Ma |
html
When: Date: 8/14/2010 , Day: 226
, Watch Time: 5:10am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather: Sunny
Phenology: ye
|
Tonzi |
(217) 2010-08-05 09:30:00 |
Joe Verfaillie |
Tonzi
2010/8/5
Returned to Tonzi about 9:30PDT where Jaclyn was busy taking soil cores. The weather is clear, warm, and sunny with a little breeze. Talked to Mr. Tonzi about nothing of consequence. The trees still look happy and there is still some
|
Tonzi |
(197) 2010-07-16 09:00:00 |
Joe Verfaillie |
Jaclyn doing photo degradation, checked sap flow stations, cleaned tower battery terminals, removed surface renewal equipment
|
Tonzi |
(175) 2010-06-24 05:00:00 |
Joe Verfaillie |
Tonzi
6/24/2010
Arrived about 5am with Siyan for pre-dawn water potential. Not too cold and no wind before dawn. Warming to pleasant temperatures at midday, a few clouds but mostly sunny. The wind was light but increasing. The oaks look strong and
|
Tonzi |
(175) 2010-06-24 05:00:00 |
Siyan Ma |
When: Date: 6/24/2010 ,
Day: 175 ,
Watch Time: 5:00 am .
Where: Tonzi/Vaira Ranch
Who: Siyan, Joe
Weather:
n
|
Tonzi |
(161) 2010-06-10 10:00:00 |
Siyan Ma |
When: Date: 6/10/2010 ,
Day: 161 ,
Watch Time: 10:00 .
Where: Tonzi/Vaira Ranch
Who: Siyan, De
|
Tonzi |
(148) 2010-05-28 05:10:00 |
Siyan Ma |
When: Date: 5/28/2010 ,
Day: 148 ,
Watch Time: 5:10 am
.
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather:
partia
|
Tonzi |
(133) 2010-05-13 11:00:00 |
Siyan Ma |
When: Date: 5/13/2010 ,
Day: 133 ,
Watch Time: 11:00 .
Where: Tonzi/Vaira Ranch
Who: Siyan, Jo
|
Tonzi |
(133) 2010-05-13 10:00:00 |
Joe Verfaillie |
Anders Ameriflux inter-comparison, LI7500 swap, IRT sensors cow chewed, two new N2 tanks.
|
Tonzi |
(120) 2010-04-30 06:10:00 |
Siyan Ma |
Tall grass at Vaira, A-Ci curves for oak and pine, leaf water potential, standard field work
|
Tonzi |
(103) 2010-04-13 10:00:00 |
Joe Verfaillie |
Tonzi
4/13/2010
Arrived about 10am. Tonzi's pound is still full, ground is very wet like recent storm dropped a lot of rain.
I fixed the under-story HMP45 solar shield, removing home made on and installing 12 plate gill with ventilation.
Replac
|
Tonzi/Vaira |
(92) 2010-04-02 06:00:00 |
Siyan Ma |
html
When: Date: 4/2/2010 , Day: 92 , Watch Time: 6:00 am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather:
cloudy, slight wind, a lot of dews, started
|
Tonzi |
(80) 2010-03-21 11:30:00 |
Siyan Ma |
|
Tonzi |
(75) 2010-03-16 09:00:00 |
Joe Verfaillie |
Tonzi pond nearly full, Installed a KZ NR-Lite and two PAR sensors, Tower tipping rain bucket needs cleaning.
|
Tonzi |
(64) 2010-03-05 09:50:00 |
Siyan Ma |
When: Date: 3/5/2010 ,
Day: 63 ,
Watch Time: 9:50 am .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather:
partially
|
Tonzi |
(56) 2010-02-25 09:00:00 |
Joe Verfaillie |
Took detour to ranch, Tram not running, Several equipment in disrepair, Removed Vaisala CO2 probes, Little scorpions in bottom of the storage box.
|
Tonzi |
(41) 2010-02-10 11:00:00 |
Joe Verfaillie |
Installed Tram with 24VDC chargin station, left CO2 profile off, brought in old sap flow equipment.
|
Tonzi |
(41) 2010-02-10 10:00:00 |
Siyan Ma |
When: Date: 2/10/2010 ,
Day: 41 ,
Watch Time: 10:00 .
Where: Tonzi/Vaira Ranch
Who: Siyan, DDB,
|
Tonzi |
(27) 2010-01-27 11:30:00 |
Joe Verfaillie |
Evidence of strong winds, consolidated soil co2 solar system, power out at Tower and soil co2
|
Tonzi |
(8) 2010-01-08 11:00:00 |
Joe Verfaillie |
Power outages at Floor and Tower, swapped soil co2 batteries, Floor computer not booting - had to use auxiliary battery.
|
Tonzi |
(8) 2010-01-08 09:50:00 |
Siyan Ma |
When: Date: 1/8/2010 ,
Day: 8 ,
Watch Time: 9:50 .
Where: Tonzi/Vaira Ranch
Who: Siyan Joe Naa
|