Field Notes

Fieldnotes Limited To:
Site = Hill Slough
Year = 2021

2020 | 2021 | 2022 | 2023 | 2024
32 Rows returned:
SiteDateAuthorSummary
Hill Slough (348) 2021-12-14 09:55:00 Daphne Szutu Swapped 7500 for calibration, changed eddy clock +1min, deployed new conductivity + water level sensor, 7700 optics desiccant needs to be swapped
Hill Slough (336) 2021-12-02 14:30:00 Joe Verfaillie High tide, replaced MiniDot.
Hill Slough (335) 2021-12-01 16:45:00 Daphne Szutu Regular data collection/cleaning, sunset, calibrated 7700, miniDOT was out of batteries
Hill Slough (322) 2021-11-18 08:30:00 Daphne Szutu Regular data collection/cleaning, close to low tide, dew on sensors, 7700 thermocouple broken--fixed, changed eddy clock +2min
Hill Slough (309) 2021-11-05 00:00:00 Daphne Szutu Breaches complete
Hill Slough (308) 2021-11-04 09:45:00 Joe Verfaillie Lowish tide, excavators still working on breach I think, tested tipping bucket, added MiniDot, added Eos CO2 probe, 7700 thermocouple broken, WD-40'd the locks, found some biofilms.
Hill Slough (299) 2021-10-26 09:30:00 Joe Verfaillie High tide - knee deep water at the tower, FD under water but seemed ok - removed, Well pipe floating - reinstalled, tested tipping bucket
Hill Slough (279) 2021-10-06 17:45:00 Joe Verfaillie First visit since levee breech - less than impressive, ditch full and some standing water far upwind. FD data not collected.
Hill Slough (278) 2021-10-05 08:00:00 Daphne Szutu First levee breach
Hill Slough (266) 2021-09-23 07:25:00 Daphne Szutu Regular data collection/cleaning, no water at the surface, swapped 7500 for calibration, changed eddy clock +1min, new gamecam from Ducks
Hill Slough (257) 2021-09-14 11:20:00 Daphne Szutu Brett called to say they will start slowly flooding
Hill Slough (246) 2021-09-03 09:00:00 Daphne Szutu Regular data collection/cleaning, barbed wire fence up, changed eddy clock +1min
Hill Slough (237) 2021-08-25 09:30:00 Daphne Szutu Fixed thermocouples, swapped dfPAR sensor, changed eddy clock +3min
Hill Slough (229) 2021-08-17 07:20:00 Daphne Szutu Regular data collection/cleaning, hazy skies, fixed TC1 and TC6 but more thermocouples need to be checked
Hill Slough (216) 2021-08-04 07:40:00 Daphne Szutu Regular data collection/cleaning, very windy and cold, new staff gauge with imperial units
Hill Slough (201) 2021-07-20 08:10:00 Joe Verfaillie Regular data collection/cleaning. Soil cores, RTK measurements and vegetation plots
Hill Slough (189) 2021-07-08 08:00:00 Ariane Arias-Ortiz Soil core collection (day 2)
Hill Slough (188) 2021-07-07 09:00:00 Ariane Arias-Ortiz Regular data collection/cleaning, soil cores (day 1)
Hill Slough (173) 2021-06-22 10:20:00 Daphne Szutu Regular data collection/cleaning, windy, spectral, removed rad cal kit
Hill Slough (167) 2021-06-16 14:00:00 Joe Verfaillie Set pi-cams locale and time, checked on cal kit, moved cal PAR from incoming to outgoing, checked on TC1 - still needs love
Hill Slough (160) 2021-06-09 17:30:00 Daphne Szutu Regular data collection/cleaning, super duper windy, measured sonic/eddy orientation, swapped 7500 for calibration, installed rad cal kit, changed eddy clock +1min
Hill Slough (146) 2021-05-26 10:00:00 Daphne Szutu Regular data collection/cleaning, calibrated 7700, took some spectral measurements, changed sonic heading
Hill Slough (133) 2021-05-13 09:45:00 Daphne Szutu Regular data collection/cleaning, super windy, road construction, front gate lock missing
Hill Slough (117) 2021-04-27 09:55:00 Daphne Szutu Regular data collection/cleaning, windy day, road construction on Grizzly Island Road, added RSB diffuse PAR sensor
Hill Slough (105) 2021-04-15 09:45:00 Daphne Szutu Regular data collection/cleaning, fresh green pickleweed growth
Hill Slough (89) 2021-03-30 09:15:00 Daphne Szutu Regular data collection/cleaning, windy day, all looks ok, wasps in met box
Hill Slough (84) 2021-03-25 09:00:00 Joe Verfaillie Working trip, new power line, 4-way net rad, FD chamber, soil cores, bolts, cleaning, tightening, measured sensor locations
Hill Slough (75) 2021-03-16 09:20:00 Daphne Szutu First site visit after setup, added precip bucket, fixed RH mux port, adjusted camera view, uploaded new config file for 7500
Hill Slough (70) 2021-03-11 09:30:00 Daphne Szutu Installed flux/met/rad sensors, Installed batteries, Ran temporary power line, Added chain link fencing to platform floors, Replaced broken solar panel
Hill Slough (61) 2021-03-02 07:50:00 Joe Verfaillie Entrance gate in poor place, dimensions of platforms
Hill Slough (57) 2021-02-26 14:40:00 Joe Verfaillie Initial set up of infrastructure, boardwalks complete, fencing done except entrance gate at beginning of boardwalk, broke one solar panel.
Hill Slough (34) 2021-02-03 13:00:00 Joe Verfaillie Met with contractors to confirm boardwalk plans - no major changes - ETA two weeks