Hill Slough: 2021-09-14 11:20:00 (DOY 257)
Author: Daphne Szutu
Others:
Summary: Brett called to say they will start slowly flooding
Brett, the engineer at Ducks, called to give me an update on flooding. This week they will start slowly flooding the pond by the PG&E tower south of our tower--the slow pace is to give time for the salt marsh harvest mouse to escape to higher ground. He only expects 15-30cm of water, so he's not sure if we'll even see any water at the surface at our tower. They plan to breach the outer levees in the last 2 weeks of October, after which the site will be fully tidal. He will keep me updated about the final breach date. |