Field Notes
<--2021-04-27 09:55:00 | 2021-05-26 10:00:00-->Other sites visited today: Bouldin Corn | Bouldin Alfalfa | West Pond | East End | Sherman Wetland | Mayberry
Phenocam link: Searching...
Hill Slough: 2021-05-13 09:45:00 (DOY 133)
Author: Daphne Szutu
Others: Joe
Summary: Regular data collection/cleaning, super windy, road construction, front gate lock missing
2021-05-13 Hill Slough Joe and I arrived at 9:45 PDT. It was super windy with some cirrus clouds. Road construction continues, but we were able to drive off the road and park right in front of the boardwalk for about 20 minutes without issues. The front gate was open and missing its lock. We need to bring a replacement. I downloaded met, camera, and USB GHG data. I downloaded and cleared the FD chamber. Joe cleaned the flux and rad sensors, tightening the nut on the folding boom, and added some miscellaneous hardware to better secure boxes. The wash reservoir was full. LI-7500 readings: CO2 410ppm H2O 510ppm T 16.3C P 101.8kPa SS 97 --> 98 after cleaning LI7700 readings: CH4 1.97ppm RSSI 56 --> 71 after cleaning We left at 10:05 PDT. |
0 photos found
4 sets found
20 HS_met graphs found
4 HS_flux graphs found
1 HS_cam graphs found
Can't check HS_Processed
2 HS_Processed graphs found