Mayberry |
(324) 2024-11-19 12:20:00 |
Daphne Szutu |
Improved picam mount, storms coming later this week
|
Mayberry |
(311) 2024-11-06 10:10:00 |
Daphne Szutu |
Super windy, one set of solar panels had fallen - fixed temporarily
|
Mayberry |
(297) 2024-10-23 11:35:00 |
Daphne Szutu |
Swapped 7500 for calibration, picam tilted--fixed
|
Mayberry |
(285) 2024-10-11 09:45:00 |
Daphne Szutu |
Sampled porewater sippers, installed new miniDOT on floating boom, dirty radiometers, measured camera height
|
Mayberry |
(269) 2024-09-25 09:10:00 |
Daphne Szutu |
Replaced bottom scaffolding, regular data collection, lowered picam and dfPAR, disturbed veg-black and veg-blue sippers
|
Mayberry |
(263) 2024-09-19 08:20:00 |
Daphne Szutu |
Removed miniDOT for temporary use at GT, swapped in swivel clamp for floating boom
|
Mayberry |
(255) 2024-09-11 12:30:00 |
Daphne Szutu |
Replaced one of the rusty bottom scaffolding layers, disturbed vegetated-red sipper profile, water level has come up, sheep have trimmed vegetation near our site
|
Mayberry |
(243) 2024-08-30 13:15:00 |
Joe Verfaillie |
Brought spare scaffolding, prepped for replacement of lowest frame set rusting out, fixed logging problem with underwater PAR, picked up some junk.
|
Mayberry |
(228) 2024-08-15 07:20:00 |
Daphne Szutu |
2nd day of chamber campaign for CH4 and N2O fluxes, regular data download, installed underwater PAR sensor, lower level of scaffolding broken--temporarily supported with two posts
|
Mayberry |
(220) 2024-08-07 14:05:00 |
Daphne Szutu |
Biomet Olympics mixed relay sipathon, 7700 calibration, pore water near the tower, BIG spider.
|
Mayberry |
(204) 2024-07-22 10:20:00 |
Daphne Szutu |
Wetland is very green, regular data collection/cleaning
|
Mayberry |
(198) 2024-07-16 08:10:00 |
Daphne Szutu |
Swapped 7500 for calibration, new CR1000 program that includes modified Bowen calcs, Porewater sipper samples, Blackberries are ripe
|
Mayberry |
(179) 2024-06-27 09:30:00 |
Daphne Szutu |
Visiting student, vegetated porewater samples, regular data collection/cleaning, heat wave next two weeks
|
Mayberry |
(177) 2024-06-25 09:00:00 |
Daphne Szutu |
CRAM assessment
|
Mayberry |
(170) 2024-06-18 09:00:00 |
Daphne Szutu |
Regular data collection/cleaning, Kyle's porewater samples, tried injecting dissolved gas and bubbles into LI-7810
|
Mayberry |
(155) 2024-06-03 10:35:00 |
Daphne Szutu |
Regular data collection/cleaning, breezy
|
Mayberry |
(152) 2024-05-31 14:30:00 |
Kyle Delwiche |
Sampled porewater sippers
|
Mayberry |
(144) 2024-05-23 12:25:00 |
Daphne Szutu |
Regular data collection/cleaning, breezy, picam tilted--fixed
|
Mayberry |
(128) 2024-05-07 11:05:00 |
Daphne Szutu |
Greening up, goats have cleared area by tower, sampled 5 sipper profiles, replaced clogged sippers
|
Mayberry |
(116) 2024-04-25 10:15:00 |
Kyle Delwiche |
We installed 10 more porewater sippers in the non-vegetated area, and sampled existing sippers.
|
Mayberry |
(114) 2024-04-23 12:20:00 |
Daphne Szutu |
Installed one profile of porewater sippers in the channel, added CTD to floating boom
|
Mayberry |
(107) 2024-04-16 13:05:00 |
Daphne Szutu |
Maintenance visit, removed CTD to send back to factory, reconnected 2nd VWC, flushed 3 of the clogged porewater wells, removed a clogged porewater well
|
Mayberry |
(102) 2024-04-11 10:40:00 |
Daphne Szutu |
Visitors Gelary and Ash, swapped 7500 for calibration, Campbell conductivity sensor in mud--adjusted, Campbell water level mostly NANs--fixed maybe, "developed" porewater sippers produced sample!
|
Mayberry |
(100) 2024-04-09 09:45:00 |
Kyle Delwiche |
Testing porewater sippers
|
Mayberry |
(95) 2024-04-04 10:15:00 |
Daphne Szutu |
Installed Campbell water level sensor, one VWC disconnected--more work needed, three porewater samples
|
Mayberry |
(85) 2024-03-25 11:00:00 |
Daphne Szutu |
Visitors, low water level, happy weeds, new pepperweed population, water level sensor not working--needs swap
|
Mayberry |
(74) 2024-03-14 13:25:00 |
Joe Verfaillie |
Windy, levees mowed, can't find cause of water level NANs, Some sipper data, lower water level
|
Mayberry |
(59) 2024-02-28 12:10:00 |
Daphne Szutu |
Water level lower, cattails coming up, attempted all porewater sippers and got 4 samples
|
Mayberry |
(47) 2024-02-16 10:30:00 |
Kyle Delwiche |
Today's goal was to sample the sippers Daphne and I had installed on Monday
|
Mayberry |
(43) 2024-02-12 12:15:00 |
Daphne Szutu |
Kyle D. installed homemade sippers--hard to draw sample, no dfPAR data for past two weeks--fixed, lots of blowdown from recent storms
|
Mayberry |
(30) 2024-01-30 11:30:00 |
Daphne Szutu |
Warm day, storm prep, + Kyle, installed VWC sensors in wetland to measure conductivity, removed porewater sippers for clean-up
|
Mayberry |
(18) 2024-01-18 12:25:00 |
Daphne Szutu |
Water level still low, dfPAR data spotty--needs more work, PG&E working on power pole removal project
|
Mayberry |
(11) 2024-01-11 11:35:00 |
Daphne Szutu |
Calibrated 7700, dfPAR motor bad--swapped, removed water radiometers, not enough water for porewater conductivity
|
Mayberry |
(4) 2024-01-04 14:00:00 |
Joe Verfaillie |
Year end data collection, 7500 swapped for calibration, diffuse PAR motor dying.
|