Site | Date | Author | Summary |
East End |
(352) 2017-12-18 12:20:00 |
Daphne Szutu |
Regular data collection/cleaning, Swapped LI-7500 for calibration, Upgraded LI-7550 from 8.0.0 to 8.5.0, Removed HMP60 for field test
|
East End |
(334) 2017-11-30 13:25:00 |
Daphne Szutu |
Regular data collection/cleaning, downloaded miniDOT data, fixed NDVI/PRI/WaterLevel
|
East End |
(321) 2017-11-17 13:30:00 |
Daphne Szutu |
Fixed NDVI sensors, downloaded met data
|
East End |
(314) 2017-11-10 13:20:00 |
Daphne Szutu |
Regular data collection/cleaning, swapped LI-7700 for calibration, corrected LI-7550 time, deployed miniDOT at tower
|
East End |
(299) 2017-10-26 11:40:00 |
Daphne Szutu |
Regular data collection/cleaning, power short from one of the NDVI sensors, camera card lost
|
East End |
(292) 2017-10-19 13:10:00 |
Daphne Szutu |
Decommission Open Water temporary tower
|
East End |
(286) 2017-10-13 10:00:00 |
Joe Verfaillie |
Added split loom to radiation sensors, cleaned solar panels, retrieved ground sensors from T3 boardwalk site.
|
East End |
(277) 2017-10-04 12:00:00 |
Joe Verfaillie |
Decommissioning of Temporary Tower 3 – Boardwalk, ground sensors still need to be retrieved.
|
East End |
(269) 2017-09-26 10:40:00 |
Daphne Szutu |
Main tower: SHF plate 1 has been chewed off, re-installed conductivity sensor
Boardwalk: sonic spikes faced downward
Closed canopy: dismantled and stored scaffolding at WP
Open water: water level lower
|
East End |
(256) 2017-09-13 10:05:00 |
Daphne Szutu |
Main tower: swapped 7500, removed conductivity and HOBO/miniDOT sensors
Boardwalk: sonic spikes faced downward
Closed canopy: deployed HOBO/miniDOT sensor
Open water: water level lower and less plant cover, sonic spikes faced downward
|
East End |
(242) 2017-08-30 09:50:00 |
Daphne Szutu |
Regular data collection/cleaning, SHF plate chewed off at T1, Swapped 7700 ethernet cable at T2, Uploaded new CR1000 program at permanent tower
|
East End |
(235) 2017-08-23 12:30:00 |
Daphne Szutu |
Downloaded met/eclipse and Licor GHG data, updated CR1000 program to record 30-min data only
|
East End |
(228) 2017-08-16 13:00:00 |
Joe Verfaillie |
Lots of wasps, Rnet bent and soil TC loose at T2, T1 okay, Main tower eclipse met program
|
East End |
(221) 2017-08-09 11:10:00 |
Joe Verfaillie |
Fixed power line at T1 Open Water and brought in RPi cam for upgrade.
|
East End |
(216) 2017-08-04 12:00:00 |
Daphne Szutu |
Fixed power at T2 (Closed Veg), T1 (Open Water) still off line, Collected camera data at Permanent tower
|
East End |
(214) 2017-08-02 09:25:00 |
Ada Chang |
Power outages at T1 and T2.
|
East End |
(213) 2017-08-01 09:30:00 |
Elke Eichelmann |
24-hour diurnal measurements of photosynthesis and stomatal conductance
|
East End |
(200) 2017-07-19 11:00:00 |
Daphne Szutu |
Permanent tower -- fixed camera, updated CR1000 OS to 31.08
T3/Boardwalk -- regular data collection/cleaning
|
East End |
(198) 2017-07-17 14:00:00 |
Ada Chang |
Conductivity NaN at Permanent Tower. MET battery empty at Open Water T1. Closed Canopy T2 was fine.
|
East End |
(198) 2017-07-17 09:30:00 |
Elke Eichelmann |
Took Li-6400 leaf level photosynthesis measurements
|
East End |
(193) 2017-07-12 09:30:00 |
Elke Eichelmann |
Took Li-6400 leaf level photosynthesis measurements
|
East End |
(184) 2017-07-03 09:00:00 |
Ada Chang |
Moved EC into water at TT1. Regular data collection at permanent tower, TT2, and TT3.
|
East End |
(178) 2017-06-27 17:43:00 |
Sam Chamberlain |
Soil iron sampling
|
East End |
(178) 2017-06-27 10:00:00 |
Joe Verfaillie |
Cleaned up T2 install, upgraded PT CR1000 met OS to fix phenocam image problem, collected data from T3.
|
East End |
(174) 2017-06-23 10:00:00 |
Joe Verfaillie |
Set up TempTower3 - boardwalk. Replaced thermocouples with floating jellyfish thermocouples at TempTower1 - Open Water. No images at Permanent Tower
|
East End |
(165) 2017-06-14 09:00:00 |
Elke Eichelmann |
Set up Closed Vegetation Temporary Tower, Moved met sensors at Open Water TT, swapped LI7500 at EE permanent tower
|
East End |
(156) 2017-06-05 12:55:00 |
Joe Verfaillie |
Data collection, installed NDVI sensors, lowered water CO2 sensor, secured solar panels at closed canopy temporary tower location.
|
East End |
(152) 2017-06-01 10:00:00 |
Elke Eichelmann |
Set up Open Water Temporary Tower
|
East End |
(145) 2017-05-25 11:05:00 |
Daphne Szutu |
Regular data collection and cleaning
|
East End |
(130) 2017-05-10 12:20:00 |
Daphne Szutu |
Regular data collection/cleaning
|
East End |
(117) 2017-04-27 11:25:00 |
Daphne Szutu |
Regular data collection/cleaning
|
East End |
(101) 2017-04-11 12:00:00 |
Daphne Szutu |
Regular data collection/cleaning, camera enclosure glass is loose
|
East End |
(88) 2017-03-29 13:30:00 |
Daphne Szutu |
Regular data collection/cleaning
|
East End |
(82) 2017-03-23 11:25:00 |
Daphne Szutu |
Calibrated 7700
|
East End |
(74) 2017-03-15 12:35:00 |
Daphne Szutu |
Regular data collection/cleaning, swapped 7500
|
East End |
(60) 2017-03-01 12:35:00 |
Daphne Szutu |
Regular data collection/cleaning
|
East End |
(54) 2017-02-23 13:55:00 |
Daphne Szutu |
set up camera to store to CF card, downloaded met data
|
East End |
(45) 2017-02-14 12:30:00 |
Daphne Szutu |
Collected met data directly from CR1000, brought Intel stick computer back to lab
|
East End |
(31) 2017-01-31 10:50:00 |
Elke Eichelmann |
Regular data collection, foggy, extensive blow down of vegetation
|
East End |
(17) 2017-01-17 12:25:00 |
Daphne Szutu |
Regular data collection, swapped sonic, water puddles in LI7500 box
|
East End |
(5) 2017-01-05 12:20:00 |
Daphne Szutu |
Regular data collection, large blowdown of wetland tule/cattail
|