Site | Date | Author | Summary |
Tonzi |
(346) 2008-12-11 12:00:00 |
Joe Verfaillie |
Showing Hideki the site, Standard field work, check Floor batteries, wind profile removed
|
Tonzi |
(331) 2008-11-26 10:00:00 |
Siyan Ma |
When: Date: 11/26/2008 ,
Day: 331 ,
Watch Time: 10:00am .
Where: Tonzi/Vaira Ranch
Who: Siyan and Gretchen
We
|
Tonzi |
(324) 2008-11-19 08:30:00 |
Joe Verfaillie |
Notes from Tonzi November 19, 2008
Sunny, warm, few high thin clouds, light to no breeze.
Starting about 8:30am I added about 1 gallon of water to the batteries at the base of the tower. All batteries were a little low on water but the system volta
|
Tonzi |
(319) 2008-11-14 00:00:00 |
Joe Verfaillie |
At Tonzi Floor
The tram car was in dock. The voltage in the charging pins read 11.8V but the solar charge controller read above 12V for the battery bank. It is possible that the tram is not charging fully and that its data logger program is not movin
|
Tonzi |
(318) 2008-11-13 08:58:00 |
Siyan Ma |
When: Date: 11/13/2008
, Day: 318
, Watch Time: 8:58 .
Where: Tonzi/Vaira Ranch
Who: Siyan
Weather:
clear
Phenology:
grass
|
Tonzi |
(304) 2008-10-30 00:00:00 |
Siyan Ma |
When: Date: 10/30/2008 ,
Day: 304 ,
Watch Time: .
Where: Tonzi/Vaira Ranch
Who: Siyan, Joe
Weather:
cloudy,
|
Tonzi |
(263) 2008-09-19 10:30:00 |
Siyan Ma |
When: Date: 9/19/2008 ,
Day: 263 ,
Watch Time: 10:30am .
Where: Tonzi/Vaira Ranch
Who: Siyan, Stefania
Weat
|
Tonzi |
(248) 2008-09-04 00:00:00 |
Siyan Ma |
When: Date: 9/4/2008 ,
Day: 248 ,
Watch Time: .
Where: Tonzi/Vaira Ranch
Who: Siyan, Jessica
Weather:
cle
|
Tonzi |
(219) 2008-08-06 09:30:00 |
Siyan Ma |
When: Date: 8/6/2008 , Day: 219
, Watch Time: 9:30am .
Where: Tonzi/Vaira Ranch
Who: Siyan, DDB
Weat
|
Tonzi |
(213) 2008-07-31 09:00:00 |
Siyan Ma |
When: Date: 7/31/2008 ,
Day: 213 ,
Watch Time: 9:00am .
Where: Tonzi/Vaira Ranch
Who: Siyan, Jessica
Weather:
|
Tonzi |
(194) 2008-07-12 16:00:00 |
Siyan Ma |
When: Date: 7/12/08 , Day: 194
, Watch Time: 4:00pm .
Where: Tonzi/Vaira Ranch
Who: Siyan, Xingyuan
Weather:
clear, breeze, hot
|
Tonzi |
(178) 2008-06-26 12:00:00 |
Siyan Ma |
html
When: Date: 26Jun2008 ,
Day: 178 ,
Watch Time: 12:00 pm .
Where: Tonzi/Vaira Ranch
Who: Siyan, Dim
|
Tonzi |
(152) 2008-05-31 00:00:00 |
Siyan Ma |
When: Date: , Day: ,
Watch Time: .
Where: Tonzi/Vaira Ranch
Who: Siyan, Jessica
Weather:
clear, nice breeze
Phe
|
Tonzi |
(127) 2008-05-06 08:55:00 |
Siyan Ma |
When: Date: 5/6/2008 , Day: 127
, Watch Time: 8:55 .
Where: Tonzi/Vaira Ranch
Who: Si
|
Tonzi |
(127) 2008-05-06 00:00:00 |
Ted Hehn |
6May08
Granted ACRT (Employee owned) Truck Lic # 8H94070 Truck# 1119 access to Tonzi Ranch – claimed to be PG&E contractor and needed access to inspect power lines and tree branches because PG&E changed locks and was not notified of said change.
|
Tonzi |
(111) 2008-04-20 05:30:00 |
Siyan Ma |
When: Datae 4/20/2008 , Day:
111 ,
Watch Time: 5:30am .
Where: Tonzi/Vaira Ranch
Who: Siyan and
|
Tonzi |
(95) 2008-04-04 11:00:00 |
Siyan Ma |
When: Date: 4/4/2008 , Day: 95
, Watch Time: 11:00 .
Where: Tonzi/Vaira Ranch
Who: Si
|
Tonzi |
(87) 2008-03-27 00:00:00 |
Ted Hehn |
Tonzi Ranch:
27Mar08
Run zero/span on co2 profile system
Note anomaly in zero span run last night: SPAN at 498 and zero at –3.1
Siyan please have a look at this to see what this problem is related to: pump failure, pressure at ambient, etc…
|
Tonzi |
(80) 2008-03-20 00:00:00 |
Dennis Baldocchi |
Perfectly clear, mild spring day. Grass is green and functioning, soil is moist.
Trees across the ranch and range are starting to leaf out this past week.
1. Moved tram system to near the understory eddy flux system. The tram needs fine adjustment, b
|
Tonzi |
(66) 2008-03-06 10:30:00 |
Dennis Baldocchi |
When: Date: 3/6/3008 ,
Day: 66 ,
Watch Time: 10:30 .
Where: Tonzi/Vaira Ranch
Who: DDB and S
|
Tonzi |
(66) 2008-03-06 00:00:00 |
Dennis Baldocchi |
Notes on re-installation of soil co2 profiles.
|
Tonzi |
(52) 2008-02-21 00:00:00 |
Ted Hehn |
Download all data from CR23X3. Ran successfully since last visit with no connection to computer. No webcam picture files. Install new cable between CR23X3 and computer and logger crashes During this process the logger crashed. Cr23X now flashing “HELLOâ
|
Tonzi |
(30) 2008-01-30 10:00:00 |
Siyan Ma |
When: Date: 1/30/2008
, Day: 30 , Watch Time: 10:00
.
Where:
Tonzi/Vaira Ranch
Who:
Siyan
|
Tonzi |
(30) 2008-01-30 00:00:00 |
Ted Hehn |
Tonzi Ranch:
Floor
13:21
Solar charge regulator
14.0 volts
18.1 charge amp
2.0 load amp, green battery status LED flashing
Tower
13.37
Solar charge regulator
12.9 volts
0.0 solar amp
5.1 load amp
Zero and span LI800
Radiation
|
Tonzi |
(24) 2008-01-24 00:00:00 |
Ted Hehn |
When: Wed, 24Jan08 JD-24
Where: Tonzi/Vaira Ranches
Who: Ted Hehn
Weather Rainy and cold, light snow in Jackson, Ca
Trip Purpose Repair fence at soil co2 profile system
Tonzi Ranch:
Replace tower co2 profile system pump and reconfigure so i
|
Tonzi |
(13) 2008-01-13 11:00:00 |
Siyan Ma |
When: Date: 1/13/2008 ,
Day: 13 ,
Watch Time: 11:00 .
Where: Tonzi/Vaira Ranch
Who: Si
|