Notes from Tonzi November 19, 2008
Sunny, warm, few high thin clouds, light to no breeze. Starting about 8:30am I added about 1 gallon of water to the batteries at the base of the tower. All batteries were a little low on water but the system voltage was above 12V. The fence charger is still reading in the yellow. I walked the fence and cleared some branches and weeds but no improvement. Battery and solar panel seem okay. Mapped location of soil temperature, heat flux and moisture probes. Floor: The tram was still at its charging station. I replace the power supply for its battery charger and it began drawing about 2amps of power from the solar panels. While I worked on other things I debated benefits of leaving the tram to see if it would charge up and start working against the deficit of having it draw down the batteries if it still had problems. In the end I decide to bring the tram in for a redesign. The computer at the floor tower was running and had collect continuous data since Nov 15 near 9am. There was a break in the data from just before midnight Nov 14 until the following morning. There was also an unexplained break in the data around 6pm on Nov 13. Siyan had visited the site in the morning of Nov 13 and I had visited the site in the afternoon of Nov 14. I checked the computer clock and data logger clocks. The clocks were ahead of my cell phone time by 2 minutes 35 seconds. Daylight savings time adjustment was/is off. Name Time Cell time Set At Computer 11:25:35 11:23:00 11:24:00 CR10X2 11:30:16 11:27:40 11:33:50 CR23X3 11:29:21 11:26:45 11:34:15 CR10X4 no connect CR23X5 11:31:12 11:28:35 11:35:05 CR23X6 11:31:47 11:29:10 11:35:30 CR10X8 11:32:16 11:29:40 11:35:55 CR10X12 no connect CR10X17 11:33:07 11:30:30 11:36:25 Batteries at Floor site didn’t need any water. Checked batteries at the soil CO2 site and added water to the two batteries powering the CO2 sensor near the tree. |
Field Data
No tank data
No TZ Well data found
No TZ Moisture Point data found
No VR Moisture Point data found
No TZ grass heigth found
No VR grass heigth found
No TZ Tree DBH found
No water potential data found
No TZ Grass Biomass data found
No TZ OakLeaves Biomass data found
No TZ PineNeedles Biomass data found
0 photos found
16 sets found
No data found for TZ_Fenergy.
11 TZ_tmet graphs found
11 TZ_soilco2 graphs found
Can't check TZ_mixed
3 TZ_mixed graphs found
No data found for TZ_fflux.
8 TZ_fmet graphs found
No data found for TZ_tram.
3 TZ_co2prof graphs found
No data found for TZ_irt.
1 TZ_windprof graphs found
No data found for TZ_tflux.
2 TZ_sm graphs found
Can't check TZ_met
1 TZ_met graphs found
Can't check TZVR_mixed
No data found for TZ_osu.
No data found for TZ_fd.
Tonzi Z-cam data