Site | Date | Author | Summary |
Bouldin Alfalfa |
(356) 2023-12-22 15:30:00 |
Joe Verfaillie |
Standard data collection, swapped 7500 for calibration, the usual way is muddy - use the levee road.
|
Bouldin Alfalfa |
(341) 2023-12-07 15:10:00 |
Daphne Szutu |
Regular data collection/cleaning, cold and rainy day after chamber/soil sampling at Gilbert Tract in the morning
|
Bouldin Alfalfa |
(324) 2023-11-20 12:45:00 |
Daphne Szutu |
Regular data collection/cleaning
|
Bouldin Alfalfa |
(310) 2023-11-06 15:44:00 |
Daphne Szutu |
Regular data collection/cleaning, alfalfa still short
|
Bouldin Alfalfa |
(299) 2023-10-26 14:10:00 |
Daphne Szutu |
Regular data collection/cleaning, alfalfa has been harvested, trimmed alfalfa under tower
|
Bouldin Alfalfa |
(284) 2023-10-11 16:15:00 |
Daphne Szutu |
Regular data collection/cleaning, discing alfalfa field by levee road
|
Bouldin Alfalfa |
(271) 2023-09-28 12:25:00 |
Daphne Szutu |
Regular data collection/cleaning, short alfalfa
|
Bouldin Alfalfa |
(262) 2023-09-19 10:00:00 |
Joe Verfaillie |
Quick stop to take down the NIKIRA fast H2O and AirT sensor. Got the tower clipped just as a mower arrived
|
Bouldin Alfalfa |
(255) 2023-09-12 16:05:00 |
Daphne Szutu |
Regular data collection/cleaning, downloaded NIKIRA data, removed PL Arable
|
Bouldin Alfalfa |
(249) 2023-09-06 15:00:00 |
Daphne Szutu |
Regular data collection/cleaning, only 1 day of camera photos--fixed, downloaded Nikira data and cleared its memory
|
Bouldin Alfalfa |
(241) 2023-08-29 15:00:00 |
Joe Verfaillie |
Quick stop to collect NKIRA data, some cable clean up
|
Bouldin Alfalfa |
(236) 2023-08-24 09:30:00 |
Joe Verfaillie |
Beginning of NKIRA water vapor inter-comparison, swapped 7500 for mount repairs, Testing LI-7810 chamber system, cut alfalfa under tower, Installed phenocam
|
Bouldin Alfalfa |
(220) 2023-08-08 15:40:00 |
Daphne Szutu |
Regular data collection/cleaning, alfalfa is looking sparse, phenocam dead
|
Bouldin Alfalfa |
(205) 2023-07-24 12:40:00 |
Daphne Szutu |
Regular data collection/cleaning, alfalfa has been mowed and baled, swapped 7500 for calibration
|
Bouldin Alfalfa |
(192) 2023-07-11 13:55:00 |
Daphne Szutu |
Regular data collection/cleaning, hot day, alfalfa growing back unevenly
|
Bouldin Alfalfa |
(179) 2023-06-28 13:00:00 |
Daphne Szutu |
Bales on field, spectral measurements weird, CR1000 program update - added more stats for modified Bowen ratio
|
Bouldin Alfalfa |
(165) 2023-06-14 13:50:00 |
Daphne Szutu |
Field recently mowed, standard fieldwork, CR1000 program update - needs another fix next time.
|
Bouldin Alfalfa |
(151) 2023-05-31 17:10:00 |
Daphne Szutu |
Regular data collection/cleaning, spectral data weird, alfalfa tall and green
|
Bouldin Alfalfa |
(137) 2023-05-17 13:45:00 |
Daphne Szutu |
Regular data collection/cleaning, field getting raked/baled
|
Bouldin Alfalfa |
(129) 2023-05-09 13:05:00 |
Daphne Szutu |
Regular data collection/cleaning, alfalfa ready to be mowed, trimmed alfalfa under the tower, installed FD chamber
|
Bouldin Alfalfa |
(115) 2023-04-25 14:45:00 |
Daphne Szutu |
Regular data collection/cleaning, alfalfa ready to mow, veg height
|
Bouldin Alfalfa |
(101) 2023-04-11 14:50:00 |
Daphne Szutu |
Regular data collection/cleaning, swapped 7500 for calibration, eosFD data very noisy--removed, bare patch in front of tower
|
Bouldin Alfalfa |
(93) 2023-04-03 15:45:00 |
Daphne Szutu |
Regular data collection/cleaning, field is slightly greener but very weedy, FD chamber data bad--needs replacement next time
|
Bouldin Alfalfa |
(72) 2023-03-13 11:50:00 |
Daphne Szutu |
Licor set up prototype ET sensor, regular data collection/cleaning, alfalfa very short and sparse, more rain on the way
|
Bouldin Alfalfa |
(61) 2023-03-02 12:20:00 |
Daphne Szutu |
Regular data collection/cleaning, alfalfa heavily grazed by geese, more rain to come
|
Bouldin Alfalfa |
(45) 2023-02-14 12:30:00 |
Daphne Szutu |
Regular data collection/cleaning, cold and breezy, alfalfa grazed by geese since last visit, dead mice x2
|
Bouldin Alfalfa |
(32) 2023-02-01 14:45:00 |
Daphne Szutu |
Regular data collection/cleaning, alfalfa short and sparse, reoriented PL Arable to face south
|
Bouldin Alfalfa |
(19) 2023-01-19 13:50:00 |
Daphne Szutu |
Regular data collection/cleaning, cold and windy, replaced PL Arable solar panel
|
Bouldin Alfalfa |
(6) 2023-01-06 13:55:00 |
Daphne Szutu |
Regular data collection/cleaning, sheep have come and gone, wet roads, straighted PL Arable post, storms this week and more rain to come
|