Equipment and Calibration History

History for Licor LI-7700 TG1-0357

Rec No.DateLoc FromTitleLoc ToNotes
6808 2024-08-07 Bouldin Corn Calibration Bouldin Corn Calibration Location: Bouldin Corn
Last calibration: 2024-01-11
RSSI=75%, Optical RH=17%
Ambient P=101.2kPa, Tair=31.0C
Zero Air at 1700psi, AMP CA03923 3.3865 at 1900
CH4 Zero Offset: -.043ppm
CH4 Span Offset: 0.0135ppm
Notes: Still day
6527 2024-01-11 Bouldin Corn Calibration Bouldin Corn Calibration Location: Bouldin Corn
Last calibration: 2023-06-14
RSSI=71%, Optical RH=9%
Ambient P=102.0kPa, Tair=13.3C
Zero Air at 1700psi, AMP CA03923 3.3865 at 1700
CH4 Zero Offset: .035ppm
CH4 Span Offset: -.0215ppm
Notes: Still day for once
6305 2023-06-14 Bouldin Corn Calibration Bouldin Corn Calibration Location: Bouldin Corn
Last calibration: 2022-11-30
RSSI=75%, Optical RH=23%
Ambient P=101.1kPa, Tair=23.0C
Zero Air at 1250psi, AMP CA04119 4.2238 at 1125
CH4 Zero Offset: -.012ppm
CH4 Span Offset: .0238ppm
Notes: Breezy. Flushed headspace to 12% optics RH after calibration and swapped in a new desiccant bottle.
6098 2022-11-30 Bouldin Corn Gas Analyzer CH4 Calibration Bouldin Corn Gas Analyzer CH4 Calibration Location: Bouldin Corn
Last calibration: 2022-06-08
RSSI=80%, Optical RH=23%
Ambient P=101.3kPa, Tair=12.6C
Zero Air at 1650psi, AMP CA04396 1.9317 at 1100
CH4 Zero Offset: .032ppm
CH4 Span Offset: .0083ppm
Notes: Breezy. After calibration we flushed headspace with zero air until optics RH = 8%. We swapped in fresh drierite. Half of the thermocouple tubing had broken off so we put on a new piece of tubing.
5897 2022-06-08 Bouldin Corn Calibration Bouldin Corn Calibration Location: Bouldin Corn
Last calibration: 2021-12-01
RSSI=77%, Optical RH=16%
Ambient P=101kPa, Tair=28C
Zero Air at 600psi, AMP CA04119 4.2238 at 1600
CH4 Zero Offset: -.074ppm
CH4 Span Offset: .0078ppm
Notes: Extra windy day of course. Did not change drierite or flush headspace with zero air.
5609 2021-12-01 Bouldin Corn Calibration Bouldin Corn Calibration Location: Bouldin Corn
Last calibration: 2021-06-24
RSSI=73%, Optical RH=24%
Ambient P=101.7kPa, Tair=20.9C
Zero Air at 1100psi, AMP CA04396 1.9317 at 1700
CH4 Zero Offset: 0.021ppm
CH4 Span Offset: -.0017ppm
Notes: Relatively still day, lots of geese in the air. After calibration, flushed headspace with zero air until optics RH=10%. Swapped out the desiccant bottle for one with fresh drierite. Zero air tank pressure uncertain--wonky regulator.
5355 2021-06-24 Loaned none Installed Bouldin Corn Gas Analyzer CH4 Returned from Steve, Sabina and Nick who were using it on Staten Island. This unit belongs to UCB and was swapped for sn TG1-0224 which belongs to DWR.
5350 2021-06-24 Bouldin Corn Gas Analyzer CH4 Calibration Bouldin Corn Gas Analyzer CH4 Calibration Location: BC
Last calibration: 2021-01-20
RSSI=80.2%, Optical RH=23%
Ambient P=101.5kPa, Tair=34.5C
Zero Air at 1800psi, AMP CA04119 4.2238 at 1800
CH4 Zero Offset: -0.015ppm
CH4 Span Offset: -0.0338ppm
Notes: This 7700 was just returned from Nick and Sabina who were using it on Staten. They calibrated it on 2021-01-20 but I don't have notes on that. Also I uploaded the TG1-0224 config file before the calibration and again after calibration but I don't think that has any affect on the calibration or measurements.
4595 2020-07-09 Loaned Disposed Disposed Given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
4565 2020-07-09 Sherman Barn Gas Analyzer CH4 Removed Loaned none Removed from Sherman Barn with its decommissioning and given to Sabina of Hydrofocus. The DWR grant ended at the end of June 2020, and Bryan requested we hand off a tower to Hydrofocus.
4483 2020-05-21 Sherman Barn Gas Analyzer CH4 Calibration Sherman Barn Gas Analyzer CH4 Calibration Location: Sherman Barn
Last calibration: 2019-10-31
RSSI=80%, Optical RH=12%
Ambient P=101.6kPa, Tair=19.2C
Zero Air at 800psi, AMP CA3923 3.121 at 800
CH4 Zero Offset: 0.036ppm
CH4 Span Offset: 0.036ppm
Notes: Breezy day
4131 2019-10-31 Sherman Barn Gas Analyzer CH4 Calibration Sherman Barn Gas Analyzer CH4 Calibration Location: Sherman Barn
Last calibration: 2019-04-11
RSSI=68%, Optical RH=8%
Ambient P=102.8kPa, Tair=12.1C
Zero Air at 1000psi, AMP CA03923 3.121 at 1050
CH4 Zero Offset: 0.020ppm
CH4 Span Offset: -0.011ppm
Notes: Power was out earlier this week.
4093 2019-09-04 Sherman Barn Gas Analyzer CH4 Upgrade Sherman Barn Gas Analyzer CH4 We updated the 7700 firmware from v1.0.21 to v1.0.27. To do this we had to change the 7700’s IP address to 192.168.2.77 – it was still at the default 169 subnet
3904 2019-04-11 Sherman Barn Gas Analyzer CH4 Calibration Sherman Barn Gas Analyzer CH4 Calibration Location: Sherman Barn
Last calibration: 2018-07-10
RSSI=70%, Optical RH=3%
Ambient P=101.9kPa, Tair=16.5C
Zero Air M4002 at 1800psi, AMP CA03923 3.121 at 1800
CH4 Zero Offset: 0.035ppm
CH4 Span Offset: -0.002ppm
Notes: Windy 3m/s to 7.5m/s
3576 2018-07-11 Lab none Installed Sherman Barn Gas Analyzer CH4 Installed at Sherman Barn on the scaffolding frame in the southwest corner of the cow fence. This is the initial set up of the site.
3562 2018-07-10 Lab none Calibration Lab none Calibration Location: Lab
Last calibration: 2017-11-09
RSSI=74.6%, Optical RH=2%
Ambient P=100.5kPa, Tair=25.8C
Zero Air at 220psi, LBL Air 1.9497 at 1400
CH4 Zero Offset: -0.001ppm
CH4 Span Offset: 0.0127ppm
Notes:
3468 2018-05-16 East End Gas Analyzer CH4 Removed Lab none Removed from the East End tower for calibration. Replaced by sn TG1-0421
3198 2017-11-10 Lab none Installed East End Gas Analyzer CH4 Installed at EE to replace sn TG1-0155, which was brought back to the lab for calibration.
3190 2017-11-09 Lab none Calibration Lab none Calibration Location: Lab
Last calibration: 2017-03-23
RSSI=72.7%, Optical RH=23%
Ambient P=100.6kPa, Tair=21.8C
Zero Air at 400psi, LBL Air 1.9497 at 1800
CH4 Zero Offset: -0.1ppm
CH4 Span Offset: -0.0197ppm
Notes: Optics RH was 23%, so I flushed the head cavity with zero air and replaced the desiccant. We just changed the desiccant last time (March 2017) so I was expecting a RH ~5%. Let's keep an eye on the optics RH.
3180 2017-10-26 Mayberry Gas Analyzer CH4 Removed Lab none Removed from MB and brought back to the lab for calibration
2670 2017-03-23 Mayberry Gas Analyzer CH4 Calibration Mayberry Gas Analyzer CH4 Calibration Location: Mayberry
Last calibration: 2016-10-11
RSSI=77.3%, Optical RH=17%
Ambient P=102.1kPa, Tair=17.0C
Zero Air at 750psi, Ameriflux CH4 4.0304 at 600
CH4 Zero Offset: 0.032ppm
CH4 Span Offset: -0.0277ppm
Notes: Changed dessicant and flushed out head with dry air.
2494 2016-10-11 Mayberry Gas Analyzer CH4 Calibration Mayberry Gas Analyzer CH4 Calibration Location: Mayberry
Last calibration: 2016-04-13
RSSI=73.6%, Optical RH=13%
Ambient P=101.6kPa, Tair=18.3C
zero air at 850psi, AMP CH4 4.030 at 1900
CH4 Zero Offset: 0.020ppm
CH4 Span Offset: 0.025ppm
Notes: Windy.
2233 2016-04-13 Mayberry Gas Analyzer CH4 Calibration Mayberry Gas Analyzer CH4 Calibration Location: Mayberry
Last calibration: 2015-09-30
RSSI=78.3%, Optical RH=7.5%
Ambient P=102.1kPa, Tair=15.8C
Zero Air at 1000psi, AMP CH4 1200 at 1.9966
CH4 Zero Offset: -0.024ppm
CH4 Span Offset: -0.009ppm
Notes: Gusty breeze, dropped the hood in the water before calibration - dried it off.
1948 2015-09-30 Mayberry Gas Analyzer CH4 Calibration Mayberry Gas Analyzer CH4 Calibration Location: Mayberry
Last calibration: 2015-06-18
RSSI=73.7%, Optical RH=3%
Ambient P=101.46kPa, Tair=17.1C
Zero Air at 1100psi, AMP CH4 1.9966 at 1650
CH4 Zero Offset: 0.049ppm
CH4 Span Offset: 0.0024ppm
Notes: Breezy - started to rain later in the day
1894 2015-06-18 Mayberry Gas Analyzer CH4 Calibration Mayberry Gas Analyzer CH4 Calibration Location: Mayberry
Last calibration: 2014-12-22
RSSI=71.7%, Optical RH=2%
Ambient P=101.2kPa, Tair=20.8C
Zero Air at 1200psi, AMP CH4 1.9966 at 1800
CH4 Zero Offset: 0.016ppm
CH4 Span Offset: 0.008ppm
Notes: Gusty wind
1634 2014-12-23 Lab none Installed Mayberry Gas Analyzer CH4 Installed on the Mayberry tower to replace sn TG1-0224 that has a problem controlling the washer pump.
1646 2014-12-22 Lab none Calibration Lab none Calibration Location: Lab
Last calibration: 2014-04-04
RSSI=72.66%, Optical RH=1%
Ambient P=101.11kPa, Tair=25.56C
Zero Air at 1300psi, 2nd CH4 4.995 at 650
CH4 Zero Offset: 0.029ppm
CH4 Span Offset: 0.025ppm
Notes:
1615 2014-10-09 Mayberry-Portable Removed Lab none Removed with the rest of the portable tower equipment. End of the portable tower campaign.
1537 2014-06-13 Lab none Installed Mayberry-Portable Installed on the Mayberry Portable tower to replace sn TG1-224 that was having line lock problems.