Field Notes

Fieldnotes Limited To:
Site = Sherman Wetland
Year = 2016
2016 | 2017 | 2018 | 2019 | 2020 | 2021 | 2022
22 Rows returned:
SiteDateAuthorSummary
Sherman Wetland (364) 2016-12-29 12:15:00 Elke Eichelmann Regular data collection, LI7500 swapped for calibration
Sherman Wetland (356) 2016-12-21 14:35:00 Elke Eichelmann Regular data collection, LI7550 pressure coefficients missing
Sherman Wetland (341) 2016-12-06 09:30:00 Joe Verfaillie LOTS of bird poop, more water, cold, windy, standard data collection.
Sherman Wetland (327) 2016-11-22 09:15:00 Elke Eichelmann Regular data collection, wetland ponds and channels flooded
Sherman Wetland (316) 2016-11-11 13:30:00 Elke Eichelmann Soil Sampling for C and N analysis
Sherman Wetland (313) 2016-11-08 14:00:00 Elke Eichelmann Regular data collection, soil sampling in tower footprint, replaced broken TC rod
Sherman Wetland (300) 2016-10-26 09:10:00 Elke Eichelmann Regular data collection, one of the "water" TC rods mowed down
Sherman Wetland (285) 2016-10-11 09:15:00 Joe Verfaillie Calibrated 7700, tested rain gauge, regular data collection.
Sherman Wetland (280) 2016-10-06 14:00:00 Joe Verfaillie Fixed NDVI, PRI sensors, lots of wasps.
Sherman Wetland (273) 2016-09-29 09:30:00 Joe Verfaillie Swapped 7500, swapped HMP fan, moved sonic to 24V, new desiccant for well pressure, lots of wasps.
Sherman Wetland (266) 2016-09-22 09:00:00 Joe Verfaillie Moved boxes, tipping bucket higher, set clock on phenocam, lots of wasps - left battery box open hoping they will leave.
Sherman Wetland (259) 2016-09-15 15:15:00 Elke Eichelmann Problem with 7700, fixed. Need to raise methane wash water reservoir. Normal data collection
Sherman Wetland (244) 2016-08-31 15:20:00 Joe Verfaillie Standard data collection, some wasps in box, HMP60 fan needs replacing.
Sherman Wetland (229) 2016-08-16 09:00:00 Joe Verfaillie Standard data collection, wasps in the data logger box and wash box.
Sherman Wetland (214) 2016-08-01 16:20:00 Elke Eichelmann Normal data collection, site not flooded, still no water in well.
Sherman Wetland (202) 2016-07-20 09:15:00 Alison Haddad Locked up solar battery box and charge controller, regular data collection.
Sherman Wetland (197) 2016-07-15 13:30:00 Joe Verfaillie Baordwalk nearly done, fixed feet on solar scaffold, moved batteries, controller higher, checked on Stardot camera
Sherman Wetland (188) 2016-07-06 09:10:00 Alison Haddad Measured sonic boom angle and veg height, took well measurements, normal data collection.
Sherman Wetland (176) 2016-06-24 09:00:00 Joe Verfaillie Swapped HMP60 shield for one with fan, clock error on 7700 but data seemed okay, Stardot camera pointing down - repositioned.
Sherman Wetland (158) 2016-06-06 09:15:00 Alison Haddad Troubleshot problems from initial setup, got camera started, recorded relative heights and distances of instruments to scaffold, recorded thermocouple-electrical port relationship
Sherman Wetland (153) 2016-06-01 08:30:00 Joe Verfaillie Finishing up site installation, change data logger clock and 7700 time zone.
Sherman Wetland (145) 2016-05-24 09:30:00 Joe Verfaillie Initial tower setup, mostly went well, running when we left, see notes from odds and ends needing to be finished