Site | Date | Author | Summary |
Bouldin Corn |
(353) 2017-12-19 10:00:00 |
Joe Verfaillie |
Water on the field, swapped HMP60 fan, standard data collection
|
Bouldin Corn |
(334) 2017-11-30 11:35:00 |
Daphne Szutu |
Regular data collection/cleaning, power problems on 11-19 to 11-21
|
Bouldin Corn |
(321) 2017-11-17 14:30:00 |
Daphne Szutu |
Fixed VWC/PRI/NDVI/dfPAR sensors, downloaded met data
|
Bouldin Corn |
(314) 2017-11-10 10:40:00 |
Daphne Szutu |
Regular data collection/cleaning, swapped LI-7500A (calibrated on LI-7550 v. 8.5.0), swapped LI-7550 temperature sensor, moved soil sensors back out to the field
|
Bouldin Corn |
(299) 2017-10-26 09:15:00 |
Daphne Szutu |
Regular data collection/cleaning, added 24V/10A power supply, LI-7550 temperature broken, CO2 very high
|
Bouldin Corn |
(292) 2017-10-19 09:45:00 |
Daphne Szutu |
Regular data collection, swapped 7500 but H2O is suspect, power-cycled PRI/NDVI sensors
|
Bouldin Corn |
(277) 2017-10-04 10:20:00 |
Joe Verfaillie |
Field was harvested, swapped 7700 and 7550 interface (embedded software 8.5.0)
|
Bouldin Corn |
(262) 2017-09-19 11:55:00 |
Daphne Szutu |
Regular data collection/cleaning, clip plots/veg height, LAI, moved soil sensors from field to under tower, 7700 wash is not working, uploaded 7550 master config file
|
Bouldin Corn |
(249) 2017-09-06 10:30:00 |
Joe Verfaillie |
Standard fieldwork, nearby fields being harvested, Fix 7700 settings again, fixed SRS NDVI/PRI loose wire problem, tower lost power on night of 2017-09-02, Watermelons!
|
Bouldin Corn |
(235) 2017-08-23 10:55:00 |
Daphne Szutu |
Regular data collection/cleaning, LAI, clip plots/veg height, updated LI-7550 software to v8.7.5, LI-7700 wash hopefully works now, we didn't know gate lock combo
|
Bouldin Corn |
(221) 2017-08-09 09:20:00 |
Joe Verfaillie |
Moved diffuse PAR RSB and remounted tipping bucket. Ears on corn, full suite of fieldwork and data collection. Restarted Picarro.
|
Bouldin Corn |
(207) 2017-07-26 09:35:00 |
Ada Chang |
Successfully took LAI measurements, swapped 7500A
|
Bouldin Corn |
(195) 2017-07-14 11:35:00 |
Daphne Szutu |
Added diffuse PAR sensor, re-installed Li-7700, updated CR1000 met program, collected camera and met data
|
Bouldin Corn |
(193) 2017-07-12 11:00:00 |
Ada Chang |
Moved tower closer to the corn field, removed 7700 to replace power board, StarDot camera installed
|
Bouldin Corn |
(174) 2017-06-23 12:00:00 |
Ada Chang |
Took vegetation height and biomass samples. Problems with NR1 PRT temperature.
|
Bouldin Corn |
(156) 2017-06-05 09:15:00 |
Joe Verfaillie |
Collected data, corn coming up, swapped downward NDVI sensor, wash problem with 7700, pulled weeds.
|
Bouldin Corn |
(152) 2017-06-01 11:00:00 |
Joe Verfaillie |
Replaced power supply, cleaned Licors, looks like they are planting the field today.
|
Bouldin Corn |
(145) 2017-05-25 14:25:00 |
Daphne Szutu |
Power problems at the tower, Disconnected Licor interface, Removed K&Z CNR1 4-way radiometer, Added longer wash hose to 7700 wash reservoir, Added new scaffolding cross bars
|
Bouldin Corn |
(130) 2017-05-10 09:20:00 |
Daphne Szutu |
Reset Time zone on 7550 box, Regular data collection/cleaning, spotty power on May 1st/2nd/8th, installed K&Z CNR1 4-way radiometer
|
Bouldin Corn |
(117) 2017-04-27 09:20:00 |
Daphne Szutu |
Regular data collection/cleaning
|
Bouldin Corn |
(116) 2017-04-26 10:30:00 |
Joe Verfaillie |
Initial set up of this site, installation on power line, waiting on end of tractor work before moving soil sensors into the field.
|
Bouldin Corn |
(110) 2017-04-20 09:00:00 |
Elke Eichelmann |
Scouted out location for Corn tower by Duck Hunting Club building, Met with Farmer
|
Bouldin Corn |
(94) 2017-04-04 13:00:00 |
Daphne Szutu |
Dropped off scaffolding
|