Rec No. | Date | Loc From | Title | Loc To | Notes |
5997 |
2022-09-15 |
Gilbert Tract |
Removed |
Lab none |
Removed from GT tower after 1 month of intercomparison with the SRS NDVI sensors |
5940 |
2022-08-16 |
Lab none |
Installed |
Gilbert Tract none |
Installed at GT in the reflected position and data collected in a separate data table for an NDVI intercomparison. |
5784 |
2022-04-12 |
Cal Kit Narrow Band NDVI Reflected |
Removed |
Lab none |
Removed from the Tonzi Tower at the end of the inter-comparison |
5728 |
2022-03-10 |
Cal Kit Narrow Band NDVI Reflected |
Moved |
Cal Kit Narrow Band NDVI Reflected |
Moved from VR radiometer boom to TZ Tower top |
5681 |
2022-02-09 |
Lab none |
Installed |
Cal Kit Narrow Band NDVI Reflected |
Installed at Varia as part of the CalKit |
5572 |
2021-11-05 |
Cal Kit Narrow Band NDVI Reflected |
Removed |
Lab none |
Removed from BA tower at the conclusion of the rad calibration and brought back to the lab. |
5538 |
2021-10-21 |
Cal Kit Narrow Band NDVI Reflected |
Moved |
Cal Kit Narrow Band NDVI Reflected |
Moved from GT to BA as part of the radiometer cal kit to begin the calibration at BA |
5460 |
2021-09-15 |
Cal Kit Narrow Band NDVI Reflected |
Moved |
Cal Kit Narrow Band NDVI Reflected |
Moved from MB to the new Gilbert Tract site to continue the radiometer intercomparison there. |
5428 |
2021-08-17 |
Cal Kit Narrow Band NDVI Reflected |
Moved |
Cal Kit Narrow Band NDVI Reflected |
Moved from EE to MB after completion of radiometer intercomparison at EE |
5392 |
2021-07-21 |
Cal Kit Narrow Band NDVI Reflected |
Moved |
Cal Kit Narrow Band NDVI Reflected |
Moved from West Pond to East End at the conclusion of the radiometer intercomparison at WP |
5349 |
2021-06-22 |
Cal Kit Narrow Band NDVI Reflected |
Moved |
Cal Kit Narrow Band NDVI Reflected |
Moved from HS to WP as part of the radiometer calibration kit at the conclusion of the 2-week intercomparison at HS. |
5324 |
2021-06-09 |
Cal Kit Narrow Band NDVI Reflected |
Moved |
Cal Kit Narrow Band NDVI Reflected |
Moved from BC to HS as part of rad cal kit |
5265 |
2021-05-27 |
Bouldin Alfalfa Narrow Band NDVI Reflected Test |
Moved |
Cal Kit Narrow Band NDVI Reflected |
Removed from the reflected position at BA where it was redundant with the SRS NDVI sensor for use with the cal kit subsequently installed at BC in the reflected position |
4661 |
2020-08-05 |
Lab none |
Installed |
Bouldin Alfalfa Narrow Band NDVI Reflected Test |
Installed at BA in the NDVI outgoing position |
4622 |
2020-07-15 |
Lab none |
Initial settings |
Lab none |
Set up as SDI-12 address H for NDVIout |