<--2011-08-04 11:00:00 | 2011-08-25 11:30:00-->Other sites visited today: Mayberry | Twitchell Rice
Phenocam link: Searching...
Sherman Island: 2011-08-12 10:15:00 (DOY 224)
Author: Joe Verfaillie
Others: Jaclyn, Sara
Summary: Swapped CNR1 and replaced resister bridge, reset SHF plate that was loose.
Sherman
2011-08-12 I arrived about 10:15PST with Jaclyn and Sara. The field looked very wet towards the middle and west end from the bridge. The water in the ditch along the road seemed higher than usual. The pepper weed is done flowering but the hell weeds seem to be about peak season. I replaced the CNR1 and the resistor bridge. The CNR1 probably has a bad long wave sensor. The PRT resistor bridge might be bad, but it might have also been a programing error that was using the wrong excitation channel. In running around the tower I pulled SHF plate #2 out of the ground. I stuffed it back in but maybe could use a more careful reinsertion. Jaclyn and Sara helped collect the data. There’s a wasp nest in the end of the radiation boom. The met program still needs some work, but it looks like it is okay for now. The solar panel for the fence power is very dirty. |
1 photos found
SI_webcam_20112251115.jpg ( 2011-08-13 11:15:04 ) Full size: 640x480
Bird on fence.
7 sets found
1 SI_mp graphs found
11 SI_met graphs found
Can't check SI_mixed
2 SI_mixed graphs found
5 SI_flx graphs found
No data found for SI_soilco2.
Can't check TWSI_mixed
Can't check SIMBTWEE_met