Field Notes
<--2021-03-30 10:30:00 | 2021-04-15 11:25:00-->Other sites visited today: West Pond | Vaira | Tonzi
Phenocam link: Searching...
Bouldin Corn: 2021-04-01 10:30:00 (DOY 91)
Author: Joe Verfaillie
Others:
Summary: Set upright the PL Arables removed from the field, our corner still not disked.
Bouldin Corn 2021-04-01 I arrived at about 10:30 PDT. This was a quick stop to set up the Planet Labs Ararble units that Daphne removed from the field on Tuesday for plowing. The corner of the field near our tower still hasn’t been plowed. I attached the post for the PL Arables to the south side of the tower so that the units are at about the level of the top of the railing. The unit on the left had all green status lights but the one on the right had two green lights, the third light was red and the last light was unlit. I left at about 10:45 for Tonzi and Vaira |
1 photos found
20210401BC_UnplowedPatch.jpg ( 2021-04-01 10:39:00 ) Full size: 1920x584
They still haven’t disked the patch near our tower
6 sets found
17 BC_met graphs found
5 BC_flux graphs found
Can't check TATWBABCSB_cam
Can't check MBSWEEWPBCBA
2 BC_pa graphs found
1 BC_arable graphs found