Field Notes
<--2009-08-20 08:30:00 | 2009-09-01 10:17:00-->Other sites visited today: Sherman Island
Phenocam link: Searching...
Twitchell Rice: 2009-08-25 13:00:00 (DOY 237)
Author: Joe Verfaillie
Others: Oliver, Ben
Summary: Atsushi's equipment has been installed, adjusted bypass valve.
Twitchell
8/25/2009 Arrive about 1pm with Oliver and Ben. Very little wind varying from west to north. Warm clear and sunny. Rice flowering heavily. Atsushi installed his equipment north of tower last Friday, looks fine. Everything seemed to be running. LGR was at 118 Torr. I adjusted the bypass value to bring to back to 142. Still making clouds of dust to the west. Ben and Oliver walked the transect for LAI, spectrum, etc. |
6 photos found
20090825TW_BenOliverHarvest.jpg ( 2009-08-25 13:28:28 ) Full size: 2048x1536
Ben and Oliver taking biomass samples
20090825TW_BenOliverUmbrella.jpg ( 2009-08-25 12:44:10 ) Full size: 2048x1536
Ben and Oliver doing LAI measurements in the rice
20090825TW_DustClouds.jpg ( 2009-08-25 12:43:38 ) Full size: 2048x1536
Dust clouds upwind from the rice paddy
20090825TW_PrayingMantis.jpg ( 2009-08-25 13:26:14 ) Full size: 2048x1536
Yellow praying mantis on green rice
20090825TW_Rice.jpg ( 2009-08-25 13:29:15 ) Full size: 1536x2048
Grains on the rice plants
20090825TW_RiceFlowers.jpg ( 2009-08-25 13:28:21 ) Full size: 2048x1536
View of tops of heading rice
6 sets found
12 TW_met graphs found
5 TW_flux graphs found
Can't check TWSI_mixed
Can't check SIMBTWEE_met
1 TW_cam graphs found
Can't check TATWBABCSB_cam