Field Notes
<--2025-03-07 11:10:00 |Other sites visited today: Bouldin Alfalfa | Hill Slough
Phenocam link: Searching...
Bouldin Corn: 2025-03-25 08:30:00 (DOY 84)
Author: Carlos Wang
Others: Arman
Summary: Regular data download and site maintenance + replaced boardwalks
Arman and I arrived at ~08:30 PST. It was sunny and warm with quite a bit of weeds by the tower. Charlotte from Whendee's lab arrived as we were doing the tower maintenance. At the tower, I dowloaded MET, GHG, purple air and camera data. The camera card had full set of images, I moved images and re-inserted this same card back. As I collected the MET data, the default settings were changed with downloaded data starting from 2025-01-29. But both 30min and 5min had data until 2025-03-25 The LI-7700 reservoir was 2/3 full, and we refilled it. Arman and I repalced the old boardwalks with new ones. The water level was 30.5cm below the ground. (Top of well pipe to water level = 151.5cm, (Previous visit measured) top of well pipe to ground = 121cm) 7500 read: 626ppm CO2, 678mmol/m3 H2O, 20.3 C, 101.5kPa, 98.6SS --99 after cleaning 7700 read: 3.6ppm CH4, 34RSSI – 81 after cleaning We left the field at around 09:35 PST. |
0 photos found
6 sets found
17 BC_met graphs found
5 BC_flux graphs found
Can't check TATWBABCSB_cam
Can't check MBSWEEWPBCBA
2 BC_pa graphs found
1 BC_arable graphs found