Field Notes
<--2009-08-25 13:00:00 | 2009-09-14 12:00:00-->Other sites visited today: Sherman Island
Phenocam link: Searching...
Twitchell Rice: 2009-09-01 10:17:00 (DOY 244)
Author: Joe Verfaillie
Others: Jaclyn, Oliver
Summary: Pass valve pressure back to 142.12 Torr, Generator went down couple of times fixed.
Twitchell
9/1/2009 Arrived about 10:17 with Jaclyn and Oliver. Clear, sunny, very light breeze. Still grading to the west. LGR: 1.91 CH4 ppm, 17112 H2O ppm, 386.7 CO2 ppm, 25.46 C, 132.6 Torr, 18.46 usec, 10Hz I adjusted the by pass valve to bring pressure back to 142.12 Torr. Generator was down a couple of times and further times to find and fix the problem – Jim thinks it was dirty filters. Down Up period 8/26 21:37:47 8/27 09:40:06 12hr 6min 8/27 15:37:06 8/27 16:10:36 33min 8/27 17:40:44 8/27 18:04:02 23min 8/29 01:23:19 8/29 07:32:52 6hr 10min 8/30 06:45:15 8/30 06:54:31 9min |
2 photos found
20090901TW_AtsushisBox.jpg ( 2009-09-01 10:24:22 ) Full size: 2048x1536
UC Davis leaf temperature and dew measurements
20090901TW_KiteFlying.jpg ( 2009-09-01 10:21:24 ) Full size: 2048x1536
Joe flying a kite
6 sets found
12 TW_met graphs found
5 TW_flux graphs found
Can't check TWSI_mixed
Can't check SIMBTWEE_met
1 TW_cam graphs found
Can't check TATWBABCSB_cam