Site | Date | Author | Summary |
Bouldin Alfalfa |
(356) 2016-12-21 09:30:00 |
Elke Eichelmann |
Regular data collection, adjusted LI7700 heater setting
|
Bouldin Alfalfa |
(342) 2016-12-07 09:30:00 |
Joe Verfaillie |
Recently mowed and baled, swapped 7500, lots of birds.
|
Bouldin Alfalfa |
(327) 2016-11-22 13:10:00 |
Elke Eichelmann |
Regular data collection, reconnected set 3 of soil sensors, adjusted LI7700 heater settings
|
Bouldin Alfalfa |
(321) 2016-11-16 12:30:00 |
Joe Verfaillie |
Collected data, moved camera higher, field may be mowed soon.
|
Bouldin Alfalfa |
(308) 2016-11-03 15:09:00 |
Sam Chamberlain |
Standard data collection, moved solar panels, set up phenocam
|
Bouldin Alfalfa |
(294) 2016-10-20 15:00:00 |
Joe Verfaillie |
Standard data collection, measured sensor locations, veg height.
|
Bouldin Alfalfa |
(280) 2016-10-06 09:30:00 |
Joe Verfaillie |
Ground sensors Set B cut - removed, swapped sonic, new 7700 hat, tilted reflected NDVI PRI sensors, clipped around tower
|
Bouldin Alfalfa |
(257) 2016-09-13 08:30:00 |
Joe Verfaillie |
Field wet with dew, ditch was dry, spikes feel off 7700 hat, moved sonic power from 12V to 24V.
|
Bouldin Alfalfa |
(244) 2016-08-31 09:55:00 |
Joe Verfaillie |
Collected data, swapped sonic, added spikes to 7700, adjust CR1000 clock by 4min.
|
Bouldin Alfalfa |
(229) 2016-08-16 13:00:00 |
Joe Verfaillie |
Field mowed, cleaned up wires, sonic bird spikes, HMP60 fan, reoriented eddy sensors.
|
Bouldin Alfalfa |
(225) 2016-08-12 09:30:00 |
Joe Verfaillie |
Initial site set up.
|