Field Notes
<--2024-12-04 10:30:00 | 2025-01-02 14:07:00-->Other sites visited today: Rush Ranch | Gilbert Tract | Mayberry | Bouldin Corn | Bouldin Alfalfa
Phenocam link: Searching...
East End: 2024-12-19 12:20:00 (DOY 354)
Author: Daphne Szutu
Others: Kyle
Summary: Cold and foggy, tules have been blown down
2024-12-19 East End Kyle and I had lunch and started the site visit at 12:20 PST. It was cold and foggy. We had a big storm last week and more rain coming all next week. We trimmed back some of the blowndown tules back from the boardwalk. The staff gauge read 54cm. I downloaded met, cam, and USB GHG data. PARin had some gaps, although it was fine while we were there. All the wiring looked tight. Kyle cleaned flux and rad sensors and checked that the precip bucket funnel looked clean. She replaced the tiny zip tie that was holding the 7700 spray tubing to the nozzle. She made sure to seat the spray nozzle correctly back onto the 7700 spar. I measured the surface water conductivity. Surface, 729uS, 6.3C The 7500 read: 433ppm CO2, 557mmol/m3 H2O, 10.1C, 102.1kPa, 93SS—95 after cleaning The 7700 read: 2.4ppm CH4, 23RSSI—76 after cleaning We left at 12:45 PST. I need to spend some time to secure the datalogger/mux better to the wooden backboard. |
0 photos found
11 sets found
14 EE_met graphs found
Can't check EE_mixed
1 EE_mixed graphs found
8 EE_flux graphs found
Can't check MBWPEESWGT_mixed
1 EE_cam graphs found
Can't check MBEEWPSWEPGT_cam
Can't check SIMBTWEE_met
Can't check EE_Temp
5 EE_Temp graphs found
Can't check EE_minidot
1 EE_minidot graphs found
Can't check MBSWEEWPBCBA
No data found for EE_processed.