6209 |
2023-03-01 |
Tonzi Battery Bank soil co2 |
Replaced |
Tonzi Battery Bank soil co2 |
I brought the three batteries last remove from HS and put them under the solar panels. I rewired all the panels into a terminal strip. I used one of the old batteries for the fence charger and brought the rest in. |
5962 |
2022-08-25 |
Tonzi Battery Bank soil co2 |
Maintenance |
Tonzi Battery Bank soil co2 |
This battery bank had been without batteries since its batteries were moved to the Tower a few weeks ago. I installed three old batteries from the Floor system that tested ok with the load tester. I rewired the two larger solar panels to 12V. The two smaller panels had there leads chewed and I left them disconnected for now. |
5944 |
2022-08-05 |
Tonzi Battery Bank soil co2 |
Maintenance |
Tonzi Battery Bank soil co2 |
The batteried in this bank have been temporarily removed to power the Tower. Likely this bank will be repopulated to power the OSU-SP1 system and a couple FD chambers as the Vaisala soil CO2 system is decommissioned. |
5353 |
2021-06-24 |
Tonzi Battery Bank soil co2 |
Maintenance |
Tonzi Battery Bank soil co2 |
Added about 1.5 gallons of DI to the four batteries in total. No plates exposed. |
4068 |
2019-08-22 |
Tonzi |
Upgrade |
Tonzi |
Six old weak batteries (four currently connected) were brought back to the lab and four new Duracell deep cycle flooded group 27 batteries were installed in pairs for a 24V system. The new batteries have 09/19 (Sept/2019) stickers. |
4069 |
2019-07-16 |
Tonzi |
Maintenance |
Tonzi |
There are six batteries in three pairs for a 24V system – the original four plus two more we added last winter. Two of the originals test a little weak with the load tester so I disconnected them from the bank. |
3818 |
2018-12-13 |
Tonzi |
Upgrade |
Tonzi |
This system has been failing overnight partly because one set of Vaisala probes have not been cycling off. I also added to old batter most recently used on East End. |
3546 |
2018-06-26 |
Tonzi |
Maintenance |
Tonzi |
The top of the plates were visible in almost all cells. I refilled them all with DI water. |
3543 |
2010-01-27 |
Tonzi |
Maintenance |
Tonzi |
I moved and combined the east 24V system with the west 24V system. Four panels in two pairs now feed two pairs of batteries through one charge controller. |
3542 |
2010-01-08 |
Tonzi |
Upgrade |
Tonzi |
I replaced both pairs of batteries in new pairs marker November 2009. |