Field Notes
<--2009-07-22 09:30:00 | 2009-07-31 10:00:00-->Other sites visited today: Sherman Island
Phenocam link: Searching...
Twitchell Rice: 2009-07-24 13:30:00 (DOY 205)
Author: Joe Verfaillie
Others: Abhinav
Summary: LGR trailer running, LGR at new location still in temporary boxes, radiation boom swung 180 degrees.
Twitchell
7/24/2009 Arrived about 1:30. met Abhinav coming back from the field. LGR trailer in for charging. Last run with LGR trailer did not write to CF card. I copied about 3 hours of data from the CR1000 internal memory. System in temporary boxes seems to be running fine. Let in place until early next week. Bolt to keep tower center post from turning fell out during move. Boom swung almost 180. replacing bolt required another 180 turn. Sonic and IRGA mount manually rotated back close to initial position after move – need to check heading again. All locked down and tight now. |
0 photos found
6 sets found
12 TW_met graphs found
5 TW_flux graphs found
Can't check TWSI_mixed
Can't check SIMBTWEE_met
1 TW_cam graphs found
Can't check TATWBABCSB_cam