Field Notes
<--2018-08-27 14:00:00 | 2018-09-18 09:55:00-->Other sites visited today: East End | Bouldin Alfalfa | East Pond | West Pond | Sherman Wetland | Sherman Barn | Mayberry
Phenocam link: Searching...
Bouldin Corn: 2018-09-05 11:55:00 (DOY 248)
Author: Daphne Szutu
Others: Sam, Alex
Summary: Regular data collection/cleaning, veg height, LAI, polished Arable dome, Theta probe out of soil
2018-09-05 Bouldin Corn We arrived at 11:55. It was sunny and clear, but the horizons were hazy. Tyler and Heather were also at the site installing soil moisture and soil O2 sensors. I collected met, camera, and USB GHG data. I also cleaned the flux and rad sensors and polished the Arable dome with toothpaste, which looked a bit better. The Theta soil moisture probe was out of the soil; I reburied it at the soil surface. Alex took 2-wand LAI data: BC0905SC, BC180905. Sam took veg height measurements. LI-7500 readings: CO2 401ppm H2O 665ppm T 24.7C P 100.8kPa SS 87-->88 LI7700 readings CH4 1.94ppm RSSI 49ppm --> 86ppm after cleaning We left at 12:25. Looking at the data back in the lab, it seems like the HMP60 could be drifting down (or BA HMP60 is drifting up). We should keep an eye on it. |
Veg Height (cm): Tape measure from ground to top of plant - measured by SC
266.7, 259.08, 264.16, 241.3, 254, 266.7, 266.7, 256.54, 254, 248.92, avg = 257.8, stdev = 8.57
1 photos found
20180905BC_ArablePolish.jpg ( 2018-09-05 12:09:47 ) Full size: 2156x1440
We polished the Arable dome with some toothpaste, before (left) and after (right). It's a little better. The darker area in the "before" picture is where Joe cleaned the dome with rubbing alcohol two weeks earlier.
6 sets found
17 BC_met graphs found
5 BC_flux graphs found
Can't check TATWBABCSB_cam
Can't check MBSWEEWPBCBA
No data found for BC_pa.
1 BC_arable graphs found