Equipment and Calibration

View History

Equipment Entry

Instrument:Soil Moisture Probe
Manufacture:Campbell Sci.
Model No:CS655
Serial No:17133
Tag No:
Acquisition Date:2015-09-28
Project:CDFW
Location on 2023-05-03:Bouldin Corn,
Notes: 12cm tines

Documents

No documents found

History

Rec No.DateLoc FromTitleLoc ToNotes
6288 2023-05-03 Bouldin Corn Soil Moisture Probe C Installed Bouldin Corn Soil Moisture Probe C Installed in soil under tower. Probe was installed horizontally with top of probe 5cm under soil surface.
6282 2023-04-26 Bouldin Corn Soil Moisture Probe C Moved Bouldin Corn Soil Moisture Probe C Moved from field to tower in preparation for impending plowing. Not installed in soil yet.
5885 2022-05-27 Bouldin Corn Soil Moisture Probe C Moved Bouldin Corn Soil Moisture Probe C Moved from under the tower in to the field after planting west of the tower. The tower was moved about 2m west to the edge of the field
5760 2022-03-31 Bouldin Corn Soil Moisture Probe C Moved Bouldin Corn Soil Moisture Probe C Moved from the field back under the tower in anticipation of tilling. This sensor is horizontally between the other 2 Campbell sensors at 20cm depth.
4789 2020-09-01 Bouldin Corn Soil Moisture Probe C Moved Bouldin Corn Soil Moisture Probe C Moved tower and soil sensors back from field in preparation for corn harvest. Soil sensors were reinstalled under the tower at -2cm depth.
4782 2020-05-19 Bouldin Corn Soil Moisture Probe C Moved Bouldin Corn Soil Moisture Probe C Moved back into the field from being under the scaffolding at the side of the field for tilling and planting.
4288 2019-12-13 Lab none Installed Bouldin Corn Soil Moisture Probe C Re-installed at Bouldin Corn after re-assembling tower. Need to check if this in A/B/C location.
4255 2019-12-02 Bouldin Corn Soil Moisture Probe C Removed Lab none Removed from Bouldin Corn site and brought back to the lab after the tower fell down during a rain/wind storm on 2019-11-26.
2730 2017-04-26 Lab none Installed Bouldin Corn Soil Moisture Probe C Installed at the Bouldin Corn site with the initial set up of the tower. Temporarily at the south edge of the scaffolding until tractor work is finished.