Equipment and Calibration

View History

Equipment Entry

Instrument:Solar Controller
Manufacture:MorningStar
Model No:PS-15M
Serial No:12501584
Tag No:
Acquisition Date:2014-04-23
Project:USDA
Location on 2020-07-07:Tonzi,
Notes:

Documents

No documents found

History

Rec No.DateLoc FromTitleLoc ToNotes
4553 2020-07-07 Lab none Installed Tonzi none Installed at Tonzi to replace sn 0127000A for use elsewhere. Since updating the solar power to 24V the 30A model is not required.
4099 2019-09-04 Bouldin Alfalfa-ReleaseEx Solar Controller Far Removed Lab none Removed from Bouldin Alfalfa with the end of the CH4 release experiment. This unit was at the far release point.
4083 2019-08-16 Lab none Installed Bouldin Alfalfa-ReleaseEx Solar Controller Far Installed for CH4 release experiment. This unit was part of the farther (nigth time) release point.
3534 2018-06-13 Twitchell Alfalfa Removed Lab none Removed with Twitchell Alfalfa site decommissioning.
3460 2018-05-10 East Pond Solar Controller Installed Twitchell Alfalfa Solar Controller Removed from East Pond in favor of a 30A version and installed at Twitchell Alfalfa
3457 2018-05-10 East Pond Solar Controller Removed Twitchell Alfalfa Solar Controller Removed from East Pond. Replaced by 30A controller.
3434 2018-04-17 Lab none Installed East Pond Solar Controller Installed at EP tower as part of initial site set up about 12m NNW of the tower
3179 2017-10-19 East End-Temp1 Solar Controller Removed Lab none Removed with decommissioning of East End Open Water tower (temporary tower 1)
2861 2017-06-01 Lab none Installed East End-Temp1 Solar Controller Installed at the East End Temporary Tower #1 Open Water location with the initial set up of this site.
1616 2014-10-09 Mayberry-Portable Removed Lab none Removed with the rest of the portable tower equipment. End of the portable tower campaign.
1285 2014-04-28 Lab none Installed Mayberry-Portable Installed on the Mayberry Portable tower.