Field Notes
<--2022-02-18 15:25:00 | 2022-03-15 12:45:00-->Other sites visited today: Gilbert Tract | Mayberry | West Pond | Bouldin Alfalfa | Bouldin Corn | Hill Slough
Phenocam link: Searching...
East End: 2022-03-01 14:35:00 (DOY 60)
Author: Daphne Szutu
Others: Koong
Summary: Regular data collection/cleaning, improved pi-cam screws, Koong's first visit to the Delta
2022-03-01 East End Koong and I arrived at 14:35 PST. This was Koong’s first time visiting the Delta field sites. It was mild, calm, and mostly overcast – perfect weather for a first visit. The water level is still relatively high here; the staff gauge read 61cm. Bryan said water levels have been increasing because they're trying to flush out salt. I downloaded met, camera, and USB GHG data. I downloaded the miniDOT data and changed the desiccant in the miniDOT and water level sensors. The wash reservoir was 80% full; Koong topped it off. Koong cleaned flux and rad sensors. He also replaced all the temporary picam box screws with the proper screws. We left the black electrical tape wrapped around the case. The 7500 signal strength is at 108 here. We should probably reset it to 100 next time. LI-7500 readings: CO2 418 H2O 350 T 26.7C P 101.9kPa SS 107 --> 108 LI7700 readings: CH4 2.0 RSSI 38 --> 78 after cleaning We left at 14:55 PST. |
0 photos found
11 sets found
14 EE_met graphs found
Can't check EE_mixed
1 EE_mixed graphs found
8 EE_flux graphs found
Can't check MBWPEESWGT_mixed
1 EE_cam graphs found
Can't check MBEEWPSWEPGT_cam
Can't check SIMBTWEE_met
Can't check EE_Temp
5 EE_Temp graphs found
Can't check EE_minidot
1 EE_minidot graphs found
Can't check MBSWEEWPBCBA
1 EE_processed graphs found