Field Notes
<--2021-09-20 09:00:00 | 2021-10-07 07:45:00-->Phenocam link: Searching...
Gilbert Tract: 2021-10-04 09:00:00 (DOY 277)
Author: Daphne Szutu
Others: Katie Bandy
Summary: Breached to Little Dutch Slough
Katie's e-mail: "The tidal marsh on the Gilbert parcel was breached...to Little Dutch Slough! They still have work at this site through the rest of the week and should be done with work on Gilbert after that. We have bridge piers being delivered and starting to be driven on Marsh Creek and Dutch Slough breach locations starting today. ... The current game plan is to breach the Dutch Slough and Marsh Creek breaches within a few days of each other the week of the 18th. It would be something like Dutch going on the 18th and Marsh Creek later that week. We will install decks for bridges in November, March Creek earlier and Dutch a little later. We will be installing a floating barrier with a boat gate in front of the Dutch Slough and Little Dutch Slough breach locations, but those likely won’t be installed until January due to manufacturing delays." |
0 photos found
8 sets found
Can't check MBWPEESWGT_mixed
Can't check MBEEWPSWEPGT_cam
16 GT_met graphs found
4 GT_flux graphs found
No data found for GT_adcp.
1 GT_cam graphs found
2 GT_usgs graphs found
2 GT_chanexo graphs found