Field Notes
<--2019-10-02 13:40:00 | 2019-10-22 12:45:00-->Other sites visited today: East Pond | West Pond | Mayberry | Sherman Barn | Sherman Wetland
Phenocam link: Searching...
East End: 2019-10-16 12:05:00 (DOY 289)
Author: Daphne Szutu
Others: Alex
Summary: Regular data collection/cleaning, collected veg samples, wetland is starting to brown
2019-10-16 East End Alex and I arrived at 12:05. It was an overcast and mild day. Bruce and his crew are re-doing the Twitchell gravel road; they were working on smoothing a dirt layer. The water level was 13 cm, quite low. We should get in touch with Bryan about it. The wetland is starting to brown—about 80% of the plants had brown tips. Alex collected some veg samples from near the tower and cleaned flux and rad sensors. I downloaded met, cam, USB GHG, and miniDOT data. We also replaced the water level sensor and miniDOT desiccant. The wash reservoir was ½ full; we refilled it. LI-7500 readings: CO2 419ppm H2O 542ppm T 20.2C P 19.4kPa SS 94--> 98 LI7700 readings: CH4 2.04ppm RSSI 58--> 79 after cleaning We left at 12:25. |
0 photos found
11 sets found
14 EE_met graphs found
Can't check EE_mixed
1 EE_mixed graphs found
8 EE_flux graphs found
Can't check MBWPEESWGT_mixed
1 EE_cam graphs found
Can't check MBEEWPSWEPGT_cam
Can't check SIMBTWEE_met
Can't check EE_Temp
5 EE_Temp graphs found
Can't check EE_minidot
1 EE_minidot graphs found
Can't check MBSWEEWPBCBA
1 EE_processed graphs found