Field Notes
<--2018-08-07 13:12:00 | 2018-08-24 16:27:00-->Other sites visited today: Bouldin Alfalfa | Bouldin Corn | East End | Sherman Barn | Sherman Wetland | Mayberry | West Pond
Phenocam link: Searching...
East Pond: 2018-08-23 12:25:00 (DOY 235)
Author: Joe Verfaillie
Others: Daphe, Kuno
Summary: Standard fieldwork, water level good, cleared some tule near the solar panels
East Pond 2018-08-23 I arrived at about 12:25 with Daphne and Kuno. It was sunny and mild with a cool breeze and very poor visibility due to haze. This wetland still looks very green with many other species of water plants competing with the tules and cattails. The water level was 61cm. The inlet was running but the water level seemed good so I didn’t adjust it. I cut down some tules shading the solar panels. Next time the solar panels could use washing. Might be possible to put in a stepping stone (cinder block?) to make it possible to get to the panels without waders. Kuno collected the data The 7500 read: 385ppm CO2, 667mmol/m3 H2O, 22.7C, 101.9kPa, 96SS The 7700 read: 1.9ppm CH4, 42RSSI – 72 after cleaning. We left at 12:45. The levee road north of the ponds is getting over grown with willows. |
0 photos found
5 sets found
Can't check MBEEWPSWEPGT_cam
9 EP_met graphs found
4 EP_flux graphs found
Can't check EP_hobo
1 EP_hobo graphs found
Can't check EP_level1
3 EP_level1 graphs found