Field Notes
<--2007-09-07 11:30:00 | 2007-09-27 09:00:00-->Other sites visited today: Tonzi
Phenocam link: Searching...
Sherman Island: 2007-09-20 16:20:00 (DOY 263)
Author: Matteo Detto
Others: Ted Hehn
Summary: 3 TC probes were not working; datalogger reset at 14:53; cleaned radiometers; installed new 60 micron filter; swapped pump; downloaded Sherman Island data.
Sherman Island - Methane Study Date: 20 Sept 2007 Day: 263 Standard Time in: 9:40 Out: 16:20 Who: MD & TH Weather: overcast, drizzly in the morning, open in the afternoon, no wind Phenology: peeper weed dry on top, renewing greenness from the bottom Tasks
Check list
Closed gate and set up fence. Other Notes: 3 TC are not working : TC1_2cm, TC2_16cm, TC2_32cm 14:53 reset datalogger
Remember next time to: Large heat shrink in tool belt (pens too) Study diff band program Need a net cable 40’ Need Ethernet card Buy plastic box for fittings ete Take ¼†compression fittings Replace low flow exhaust Order 60 micron filter element or larger SS-8F-K4-60 14†wire-tighters |
0 photos found
7 sets found
No data found for SI_mp.
10 SI_met graphs found
Can't check SI_mixed
2 SI_mixed graphs found
4 SI_flx graphs found
No data found for SI_soilco2.
Can't check TWSI_mixed
Can't check SIMBTWEE_met