Field Notes
<--2007-08-31 10:40:00 | 2007-09-20 16:20:00-->Phenocam link: Searching...
Sherman Island: 2007-09-07 11:30:00 (DOY 250)
Author: Dennis Baldocchi
Others: Matteo Detto and Kate
Summary: Power was lost on the 7th from 3am-5am and methane sensor did not restore; LI-corr 7500 power cable replaced; took soil moisture; data collected from laser & Sherman Island.
Sherman Island - Methane Study Date: 7 September 2007 Day: 250 Standard Time in: 10:20 Out: 11:30 Who: DB, MD, kate Weather: windy, fog-overcast Phenology: pepper weed flowering and green up again, dead leaves dropped Tasks
Check list
Closed gate and set up fence. Other Notes: 09-07-07 at 3 AM (approx) until 5 AM (approx) we lost power. The CO2 station automatic restored, methane sensor not. Dennis swapped power supply cable of Li-corr 7500 Water table 4 ft + 9.5 tenth = 102.61 (double check next time) Remember next time to: |
0 photos found
7 sets found
No data found for SI_mp.
10 SI_met graphs found
Can't check SI_mixed
2 SI_mixed graphs found
4 SI_flx graphs found
No data found for SI_soilco2.
Can't check TWSI_mixed
Can't check SIMBTWEE_met