Skip to main content
rice field banner biometlab logo
   
   
 
   
   
   
   
   
 
 

Equipment and Calibration

View History

Equipment Entry

Instrument:CO2 Probe
Manufacture:Vaisala
Model No:GMP222
Serial No:Z2720015
Tag No:
Acquisition Date:2004-06-29
Project:Tonzi
Location on 2022-10-05:Lab,
Notes: 0-1% range

Documents

No documents found

History

Rec No.DateLoc FromTitleLoc ToNotes
6028 2022-10-05 Tonzi-SoilCO2 CO2 Probe Open Profile -0.04 Removed Lab none The soil co2 gradient system has not been in good condition for a long time. Finally getting around to removing the equipment from the field: Open -4cm
3055 2017-09-14 Lab none Installed Tonzi CO2 Probe Open Profile -0.04 Installed at Tonzi in the Open profile at -4cm after lab calibration. This is a new installation with new holes dug.
3010 2017-08-25 Tonzi CO2 Probe Open Profile -0.04 Removed Lab none Removed from Tonzi Open profile at -4 cm position for calibration
2189 2016-02-23 Lab none Installed Tonzi CO2 Probe Open Profile -0.04 Installed in the Tonzi Open profile at -4cm after lab calibration.
2150 2016-02-04 Vaira CO2 probe East Profile -0.04 Removed Lab none Removed from Vaira East profile at -4cm for calibration
2067 2014-12-09 Vaira CO2 probe East Profile -0.02 Location Vaira CO2 probe East Profile -0.02 Vaira East profile at -2cm
2000 2014-01-29 Lab none Installed Vaira CO2 probe East Profile -0.04 East profile as -4cm with new U-shaped tops on the PVC enclosures.
1443 2014-01-27 Lab none Calibration Lab none Trueppm = Probeppm*0.9937 + 44.53; linear relationship between the ppm reported by the probe and the known ppm of the calibration tanks. Tanks: zero air (0ppm), 3056ppm, and 10000ppm. Ta=22.7C, P=102.1kPa. Because the lab conditions were close to factory conditions, no temperature or pressure corrections were applied. Done by: Patty.
1191 2014-01-24 Vaira CO2 probe East Profile -0.04 Removed Lab none Removed from Vaira east plot at -4cm for lab calibration
1125 2012-03-21 Lab none Installed Vaira CO2 probe East Profile -0.04 Installed at Vaira in the east set at -4cm
1400 2012-01-30 Lab none Calibration Lab none Trueppm = Probeppm*1.005 + 20.82; linear relationship between the ppm reported by the probe and the known ppm of the calibration tanks. Tanks: zero air (0ppm), 436ppm, 2238ppm, and 10000ppm (N2 bal). Ta=27.4C, P=101.9kPa. Because the lab conditions were close to factory conditions, no temperature or pressure corrections were applied. Done by: Siyan.
1373 2011-02-01 Lab none Calibration Lab none Trueppm = Probeppm*1.025 + 6.264; linear relationship between the ppm reported by the probe and the known ppm of the calibration tanks. Tanks: zero air (0ppm), 383ppm, and 597ppm. Ta=25.5C, P=102.3kPa. Because the lab conditions were close to factory conditions, no temperature or pressure corrections were applied. Done by: Melanie.
1360 2010-02-11 Lab none Calibration Lab none Trueppm = Probeppm*1.053 + -13.53; linear relationship between the ppm reported by the probe and the known ppm of the calibration tanks. Tanks: zero air (0ppm), 383ppm, 597ppm, and 2238ppm. Ta=21.8C, P=102.3kPa. Because the lab conditions were close to factory conditions, no temperature or pressure corrections were applied. Done by: Jaclyn.
9 2009-12-01 Factory Repair Factory Vaisala factory repair and calibration 0-1% - certificate on file.
Problem: Got probe error 05 and 10. Memory error and no IR source.
Action: Replaced probe circuit board and adjusted unit
 
 

Login