Skip to main content
rice field banner biometlab logo
   
   
 
   
   
   
   
   
 
 

Equipment and Calibration

View History

Equipment Entry

Instrument:Heat Flux Plate
Manufacture:Hukseflux
Model No:HFP01
Serial No:10809
Tag No:
Acquisition Date:2015-02-20
Project:Oikawa
Location on 2021-03-11:Hill Slough,
Notes: Factory calibration 2014-10-17, 62.69 uV/(W/m2). Wht = +sig, Grn = -sig, Blk = shield.

Documents

No documents found

History

Rec No.DateLoc FromTitleLoc ToNotes
5190 2021-03-11 Lab none Installed Hill Slough Heat Flux Plate B Installed at Hill Slough with site setup.
4959 2020-11-12 Sherman Wetland-Temp1 Heat Flux Plate B Removed Lab none Removed with decommissioning of Sherman Wetland Temp tower. Brought back to the lab for cleanup.
4492 2020-05-21 Sherman Wetland-Temp1 Heat Flux Plate B Moved Sherman Wetland-Temp1 Heat Flux Plate B Moved from 5cm depth and 30 degree angle to 2cm depth below soil surface and horizontal.
4342 2020-01-30 East Pond Heat Flux Plate C Moved Sherman Wetland-Temp1 Heat Flux Plate B Removed with the decommissioning of the EP tower and installed at the new SW Temporary site 1250m upwind of the Permanent Tower.
3427 2018-04-17 Lab none Installed East Pond Heat Flux Plate C Installed at EP tower as part of initial site set up in profile C (South) and mux channel 10
3339 2018-02-27 Lab none Repair Lab none Re-stripped cable so the correct ground wire was showing. The brown wire had been used as the ground, but that is not connected to anything. I fixed the cable so the three exposed wires are white (sig +), green (sig -) and bare (ground).
3090 2017-09-26 East End-Temp2 Heat Flux Plate B Removed Lab none Brought back to the lab with the decommissioning of the East End closed canopy temporary tower 2.
2866 2017-06-14 Lab none Installed East End-Temp2 Heat Flux Plate B Installed on the East End Temporary Tower #2 Closed Canpoy location with the initial tower set up.
2687 2017-04-04 Twitchell Rice Heat Flux Plate A Removed Lab none Removed with the decommissioning of the Twitchell Rice site.
1781 2015-04-09 Lab none Installed Twitchell Rice Heat Flux Plate A Installed at rice as SHF1 in mux channel 16
1970 2014-10-17 Factory Calibration Factory Initial factory calibration:
a0 = 0
a1 = 62.69 uV/(W/m2)
 
 

Login