Equipment and Calibration History
History for Hukseflux HFP01 11326
Rec No. | Date | Loc From | Title | Loc To | Notes |
---|---|---|---|---|---|
6291 | 2023-05-03 | Bouldin Corn Heat Flux Plate A | Installed | Bouldin Corn Heat Flux Plate A | Installed in soil under tower at 2cm depth. |
6285 | 2023-04-26 | Bouldin Corn Heat Flux Plate A | Moved | Bouldin Corn Heat Flux Plate A | Moved from field to tower in preparation for impending plowing. Not installed in soil yet. |
4793 | 2020-09-01 | Bouldin Corn Heat Flux Plate A | Moved | Bouldin Corn Heat Flux Plate A | Moved tower and soil sensors back from field in preparation for corn harvest. Soil sensors were reinstalled under the tower at -2cm depth. |
4785 | 2020-05-19 | Bouldin Corn Heat Flux Plate A | Moved | Bouldin Corn Heat Flux Plate A | Moved back into the field from being under the scaffolding at the side of the field for tilling and planting. |
4291 | 2019-12-13 | Lab none | Installed | Bouldin Corn Heat Flux Plate A | Re-installed at Bouldin Corn after re-assembling tower. Need to check if this in A/B/C location. |
4258 | 2019-12-02 | Bouldin Corn Heat Flux Plate A | Removed | Lab none | Removed from Bouldin Corn site and brought back to the lab after the tower fell down during a rain/wind storm on 2019-11-26. |
2722 | 2017-04-26 | Lab none | Installed | Bouldin Corn Heat Flux Plate A | Installed at the Bouldin Corn site with the initial set up of the tower. Temporarily at the south edge of the scaffolding until tractor work is finished. |
1956 | 2015-06-11 | Factory | Calibration | Factory | Initial factory calibration: 62.52 uV/(W/m2) |